waeco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CA-800-Install.book Seite 28 Mittwoch, 20. Februar 2008 12:28 12<br />
Installation<br />
6.2.3 Secure the balance plate<br />
CoolAir<br />
➤<br />
Position the balance plate on the system. To do this, place the four<br />
thread bolts through the four slots in the balance plate.<br />
The balance plate adjusts the roof air conditioner to the specific requirements<br />
of each vehicle.<br />
➤<br />
Screw one M8 nut each + spring washer + washer (see fig. 3 on<br />
page 3, Pos. 1-3) on to the four thread bolts.<br />
Turn the nuts by hand. The nuts are tightened at a later stage.<br />
6.2.4 Attach the sealing compound to the roof of the driver's<br />
cabin<br />
Make sure that the surface for sticking sealing compound between the balance<br />
plate and the roof of the driver's cabin is clean (free from dust, oil,<br />
etc.).<br />
➤<br />
➤<br />
Stick the 2.5 m long insulating tape (25 x 25 mm) along the contour of<br />
the roof hatch on the roof of the driver's cabin (see fig. 4 on page 4).<br />
Apply a plastic, non-hardening sealing compound (for example, Sika-<br />
Lastomer-710) to the impact edge and the top edge of the insulation<br />
tape.<br />
6.2.5 Install the system in the roof hatch<br />
➤<br />
Position the system in the sunroof opening centrally and in the direction<br />
of travel (see fig. 1 on page 3). The eight fastening bolts for the<br />
balance plate must be put into the drill holes positioned by the manufacturer<br />
around the sunroof opening.<br />
Make sure the roof air conditioner is centred perfectly. The seal must be<br />
applied continuously around the roof air conditioner after placing it on the<br />
roof of the vehicle. This is the only way to ensure a tight seal.<br />
➤<br />
on the roof of the vehicleScrew one self-locking M8 nut each + washer<br />
(see fig. 5 on page 4, Pos. 2 and 1) on to the eight fastening bolts.<br />
Tighten the nuts with a torque of 10 Nm to attach the system.<br />
➤ Tighten the four M8 nuts on the thread bolts (see fig. 3 on page 3,<br />
Pos. 6) by hand again.<br />
28