The Project Proponent is committed to operating the plant<br />

in an environmentally sustainable manner, in compliance<br />

with all prevailing environmental regulations.<br />

[PRELIMINARY ENVIRONMENTAL IMPACT<br />

ASSESSMENT AND QUANTITATIVE RISK<br />

ASSESSMENT, PROPOSED ADVANCED MATERIALS<br />

PLANT, GEBENG INDUSTRIAL ESTATE, KUANTAN<br />

PAHANG, MALAYSIA VOLUME 1: MAIN REPORT<br />

January 2008 muka surat 8-21]”<br />

iv) Radiologi:<br />

a. Kilang <strong>Lynas</strong> juga melalui <strong>Laporan</strong> RIA, komited untuk<br />

mematuhi dan memasang alat kawalan pencemaran radiologi<br />

yang berkesan dan mematuhi standard yang ditetapkan bagi<br />

mengawal dan memantau pencemaran keradioaktifan ke alam<br />

sekitar. Malahan <strong>Jawatankuasa</strong> mengambil maklum pihak<br />

<strong>Lynas</strong> telah menempatkan alat pemantauan tambahan alam<br />

sekitar yang melebihi keperluan perundangan.<br />

“In mitigation against the release of potentially contaminated<br />

liquid and gaseous effluents, <strong>Lynas</strong> will employ all necessary<br />

technological means to render these emissions harmless to<br />

the receiving environment, in compliance to the prevailing<br />

regulatory requirements including those enforced by <strong>AELB</strong>.<br />

Details of the non-radiological pollution control systems<br />

proposed for the plant are deliberated in the Environmental<br />

Impact Assessment prepared for the project. Basically it<br />

consists of a scrubbing system that can practically trap and<br />

remove all particulates and non-radioactive gases, and a 55 m<br />

high stack through which the gaseous effluents will be<br />

released. The immediate environment around the plant will be<br />

monitored periodically to ensure that any release of the<br />

radioactive effluents will remain within the permissible limits<br />

in accordance to clearance levels as stipulated in the<br />

Radioactive Waste Management Regulations [Atomic Energy<br />

Licensing Board; Atomic Energy Licensing (Radioactive<br />

Waste Management) Regulations 2011 [P.U. (A) 274]].<br />

[LAMP Radiological Impact Assessment, Rev 5, December<br />

2011, muka surat 68]”<br />

b. Tapak tersebut juga mempunyai data bacaan latar belakang<br />

radiologi 12 bulan, ini penting bagi mencapai tujuan konsep<br />

„cradle to cradle’ apabila pembubaran dan nyahcemaran<br />

(decommissioning and decontamination) kilang nanti. Tapak<br />

57<br />