238 Pembangkitan Tenaga Listrik

Gambar IV.2.C.

Kurva Beban Sistem dan Region

Selasa, 13 November 2001 Pukul 18.30 = 12.577 MW (Netto)

Gambar IV.2.D.

Kurva Beban Sistem dan Region

Rabu, 14 November 2001 pukul 19.00 = 12.500 MW (Netto)