02.07.2013 Views

teknik pembangkit tenaga listrik jilid 2 smk

teknik pembangkit tenaga listrik jilid 2 smk

teknik pembangkit tenaga listrik jilid 2 smk

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LAMPIRAN<br />

B2<br />

Pembangkitan Tenaga Listrik<br />

duga muka air (DMA), 159<br />

economizer, 174, 163<br />

elektroda, 87<br />

elevator, 512<br />

energi <strong>listrik</strong>, 5<br />

energi mekanik, 4<br />

energi primer, 5, 16<br />

exitacy, 94, 458<br />

feeder (saluran), 15<br />

faktor beban, 2, 244<br />

faktor daya, 551<br />

faktor disipasi, 97<br />

faktor kapasitas, 245<br />

faktor utilisasi, 246<br />

field circuit breaker, 480<br />

fire, 93,233<br />

filtering, 95<br />

flashover, 115<br />

frekuensi, 24, 110<br />

frekuensi getar,557<br />

frekuensi lidah bergetar, 556<br />

frekuensi meter, 556<br />

flused stem system, 197<br />

forced outage rate (for), 246<br />

fuel cell, 213<br />

gangguan belitan kutub, 371<br />

gangguan dan kerusakan, 19<br />

gangguan elektrik generator, 370<br />

gangguan mekanis generator, 364<br />

gangguan, pemeliharaan dan<br />

perbaikan generator sinkron, 285<br />

gangguan, pemeliharaan dan<br />

perbaikan motor asinkron, 288<br />

gangguan pada mesin dc, 364<br />

gelombang mikro, 553<br />

generation planning, 5<br />

generator, 350<br />

generator asinkron,133<br />

generator arus searah shunt, 37<br />

generator buffer, 360<br />

generator dc, 29<br />

generator dc dengan 2 kutub, 40<br />

generator dc shunt 4 kutup, 40<br />

generator dc tidak keluar tegangan,<br />

364<br />

generator <strong>listrik</strong>,1<br />

generator main excitacy, 38<br />

generator penguat pilot, 29<br />

generator penguat utama, 29<br />

generator sinkron, 3, 28, 133, 282,<br />

generator sinkron 3 phasa, 27, 28,<br />

generator terbakar, 277<br />

gerbang AND,428<br />

gerbang NOT, 429<br />

gerbang OR, 428,<br />

geothermal, 189<br />

glowler, 373<br />

grindability test, 234<br />

ground, 546<br />

grounding mesh, 137<br />

grounding plate, 137<br />

hand wheel (shunt regullar), 37<br />

harmonisa, 24<br />

hazard triangle, 229<br />

heat exchanger, 18<br />

heat recovery steam generator, 184<br />

heat shrink, 184<br />

hubungan jajar baterai akumulator<br />

dan generator sunt, 350<br />

hygroscopicity, 95<br />

instalasi arus searah, 5<br />

instalasi bahan bakar, 5<br />

instalasi baterai aki, 5<br />

instalasi lift/elevator, 512<br />

instalasi pemakain sendiri, 75<br />

instalasi pendingin, 5<br />

instalasi penerangan, 5<br />

instalasi tegangan tinggi, 5<br />

instalasi tegangan rendah, 5<br />

instalasi telekomunikasi, 119<br />

instalasi sumber energi, 5<br />

interferensi, 523<br />

interkoneksi, 6<br />

insulating switch, 50<br />

investasi, 5<br />

jenis saklar <strong>tenaga</strong>, 49<br />

juster werstand, 37<br />

jointing sleeve, 128<br />

kapasitor penguat, 529<br />

kendalan <strong>pembangkit</strong>, 248<br />

kebenaran AND, 427<br />

kebenaran OR, 428<br />

kedip tegangan, 24<br />

kegiatan pemeliharaan, 396<br />

kemiringan tegangan, 24<br />

klasifikasi transformator <strong>tenaga</strong>, 450<br />

kendala operasi, 227<br />

kerja pararel transformator. 432

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!