M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
B A B 1 : <strong>MAKLUMAT</strong> <strong>PROJEK</strong> <strong>RMKe</strong>-9<br />
1.1 PRESTASI PERBELANJAAN PERUNTUKAN PEMBANGUNAN <strong>RMKe</strong>-9 MENGIKUT TAHUN (31 OGOS 2010)<br />
- Maklumat ini hanya boleh dicapai dalam Portal Intranet KKR –<br />
1
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
- Maklumat ini hanya boleh dicapai dalam Portal Intranet KKR –<br />
Sumber : Unit Penyelarasan Pelaksanaan (ICU), Jabatan Perdana Menteri<br />
2
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
1.2 PRESTASI PERBELANJAAN PEMBANGUNAN <strong>RMKe</strong>-9 TAHUN 2010 (31 OGOS 2010)<br />
- Maklumat ini hanya boleh dicapai dalam Portal Intranet KKR –<br />
3
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
- Maklumat ini hanya boleh dicapai dalam Portal Intranet KKR –<br />
Sumber : Unit Penyelarasan Pelaksanaan (ICU), Jabatan Perdana Menteri<br />
4
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
1.3 PRESTASI PELAKSANAAN <strong>PROJEK</strong> KKR BERDASARKAN BUTIRAN (SEHINGGA 31 OGOS 2010)<br />
Bil<br />
Bahagian/<br />
Cawangan<br />
Bil.<br />
Projek<br />
Dalam<br />
Perancangan<br />
Ikut<br />
Jadual<br />
Lewat<br />
Jadual<br />
Dahulu<br />
Jadual<br />
Siap<br />
Sepenuhnya<br />
1<br />
Bahagian Pembangunan dan<br />
Penswastaan (KKR)<br />
66 1 12 2 6 44<br />
2 Bahagian Perancang Jalan (KKR) 37 0 23 0 0 14<br />
3 Cawangan Arkitek (KKR) 1 0 0 0 0 1<br />
4 Cawangan Jalan (JKR) 27 0 18 0 3 6<br />
5<br />
Cawangan Kejuruteraan Awam, Struktur<br />
& Jambatan (CKASJ) (JKR)<br />
1 0 1 0 0 0<br />
6 Cawangan Kejuruteraan Cerun (JKR) 10 0 7 0 0 3<br />
7 Cawangan Kejuruteraan Mekanikal (JKR) 4 0 3 0 0 1<br />
8 Cawangan <strong>Kerja</strong> Bangunan Am (JKR) 1 0 0 0 0 1<br />
9 Jabatan <strong>Kerja</strong> <strong>Raya</strong> (JKR) 0 0 0 0 0 0<br />
10 JKR Negeri Johor 23 0 6 1 1 14<br />
11 JKR Negeri Kedah 26 0 10 0 7 9<br />
12 JKR Negeri Kelantan 18 0 3 0 4 10<br />
5
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
Bil<br />
Bahagian/<br />
Cawangan<br />
Dalam<br />
Perancangan<br />
Ikut<br />
Jadual<br />
Lewat<br />
Jadual<br />
Dahulu<br />
Jadual<br />
Siap<br />
Sepenuhnya<br />
13 JKR Negeri Melaka 7 0 0 1 2 4<br />
14 JKR Negeri Pahang 42 3 16 1 1 21<br />
15 JKR Negeri Perak 18 0 5 0 0 13<br />
16 JKR Negeri Perlis 13 0 3 0 1 9<br />
17 JKR Negeri Pulau Pinang 18 0 6 1 1 10<br />
18 JKR Negeri Sabah 65 1 15 4 3 41<br />
19 JKR Negeri Sarawak 91 5 26 8 1 51<br />
20 JKR Negeri Selangor 24 2 5 0 3 14<br />
21 JKR Negeri Sembilan 16 1 6 2 2 5<br />
22 JKR Negeri Terengganu 23 2 7 0 3 11<br />
23<br />
JKR Wilayah Persekutuan (Kuala<br />
Lumpur)<br />
17 0 6 0 2 9<br />
24 JKR Wilayah Persekutuan (Labuan) 6 0 3 0 0 3<br />
25 <strong>Kementerian</strong> <strong>Kerja</strong> <strong>Raya</strong> (KKR) 10 2 4 0 1 3<br />
26 Lembaga Lebuhraya <strong>Malaysia</strong> 28 3 8 0 3 14<br />
27 Pusat Khidmat Kontraktor 1 0 1 0 0 0<br />
<strong>Kementerian</strong> <strong>Kerja</strong> <strong>Raya</strong> 593 23 194 20 44 311<br />
Sumber : Sistem Pemantauan Projek II<br />
6
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
1.4 PRESTASI PELAKSANAAN <strong>PROJEK</strong> RMKE-9 YANG DILAKSANAKAN OLEH IBU PEJABAT JKR (MENGIKUT<br />
KONTRAK) SEHINGGA 31 DISEMBER 2010<br />
BIL<br />
KEMENTERIAN PELANGGAN<br />
JUMLAH<br />
<strong>PROJEK</strong><br />
<strong>RMKe</strong>-9<br />
<strong>PROJEK</strong> SAMBUNGAN<br />
<strong>RMKe</strong>-9<br />
PEMBINAAN<br />
SERAHAN /<br />
SIAP<br />
JUMLAH<br />
<strong>PROJEK</strong><br />
DALAM<br />
PEMBINAAN<br />
YANG SAKIT<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
JABATAN PERDANA MENTERI<br />
(JPM)<br />
KEMENTERIAN KEWANGAN<br />
(MOF)<br />
KEMENTERIAN LUAR NEGERI<br />
(KLN)<br />
KEMENTERIAN PELAJARAN<br />
(KPM)<br />
KEMENTERIAN PEMBANGUNAN<br />
WANITA, KELUARGA DAN<br />
MASYARAKAT (KPWKM)<br />
KEMENTERIAN PENGAJIAN<br />
TINGGI (KPT)<br />
KEMENTERIAN KESIHATAN<br />
(KKM)<br />
KEMENTERIAN PERDAGANGAN<br />
ANTARABANGSA & INDUSTRI<br />
(MITI)<br />
56 56 0 13<br />
26 26 0 5<br />
3 3 0 3<br />
552 487 65 27<br />
5 5 0 1<br />
73 68 5 6<br />
90 84 6 13<br />
0 0 0 0<br />
7
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BIL<br />
KEMENTERIAN PELANGGAN<br />
JUMLAH<br />
<strong>PROJEK</strong><br />
<strong>RMKe</strong>-9<br />
<strong>PROJEK</strong> SAMBUNGAN<br />
<strong>RMKe</strong>-9<br />
PEMBINAAN<br />
SERAHAN /<br />
SIAP<br />
JUMLAH<br />
<strong>PROJEK</strong><br />
DALAM<br />
PEMBINAAN<br />
YANG SAKIT<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
KEMENTERIAN PENGANGKUTAN<br />
(MOT)<br />
KEMENTERIAN PERDAGANGAN<br />
DALAM NEGERI, KOPERASI &<br />
KEPENGGUNAAN (KPDNKK)<br />
KEMENTERIAN PERTAHANAN<br />
(MINDEF)<br />
KEMENTERIAN TENAGA,<br />
TEKNOLOGI HIJAU & AIR<br />
(KTTHA)<br />
KEMENTERIAN PERUMAHAN &<br />
KERAJAAN TEMPATAN (KPKT)<br />
KEMENTERIAN SUMBER ASLI<br />
DAN ALAM SEKITAR (NRE)<br />
KEMENTERIAN KERJA RAYA<br />
(KKR)<br />
KEMENTERIAN PENERANGAN,<br />
KOMUNIKASI DAN KEBUDAYAAN<br />
(KPKK)<br />
KEMENTERIAN SAINS,<br />
TEKNOLOGI & INOVASI (MOSTI)<br />
1 1 0 1<br />
0 0 0 0<br />
10 9 1 0<br />
2 2 0 0<br />
4 4 0 0<br />
6 6 0 3<br />
89 82 7 10<br />
5 5 0 1<br />
4 4 0 0<br />
8
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BIL<br />
KEMENTERIAN PELANGGAN<br />
JUMLAH<br />
<strong>PROJEK</strong><br />
<strong>RMKe</strong>-9<br />
<strong>PROJEK</strong> SAMBUNGAN<br />
<strong>RMKe</strong>-9<br />
PEMBINAAN<br />
SERAHAN /<br />
SIAP<br />
JUMLAH<br />
<strong>PROJEK</strong><br />
DALAM<br />
PEMBINAAN<br />
YANG SAKIT<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
25<br />
KEMENTERIAN DALAM NEGERI<br />
(KDN)<br />
KEMENTERIAN PERUSAHAAN<br />
PERLADANGAN DAN KOMODITI<br />
(KPPK)<br />
KEMENTERIAN BELIA & SUKAN<br />
(KBS)<br />
KEMENTERIAN WILAYAH<br />
PERSEKUTUAN &<br />
KESEJAHTERAAN BANDAR<br />
(KWPKB)<br />
KEMENTERIAN PELANCONGAN<br />
(MOTOUR)<br />
KEMENTERIAN PERTANIAN DAN<br />
INDUSTRI ASAS TANI (MOA)<br />
KEMENTERIAN KEMAJUAN LUAR<br />
BANDAR DAN WILAYAH (KKLBW)<br />
KEMENTERIAN SUMBER<br />
MANUSIA (KSM)<br />
67 63 4 7<br />
4 4 0 0<br />
7 7 0 0<br />
1 1 0 0<br />
4 4 0 1<br />
5 5 0 3<br />
63 63 0 2<br />
3 3 0 0<br />
JUMLAH 1,080 992 88 96<br />
Sumber : Jabatan <strong>Kerja</strong> <strong>Raya</strong> (JKR)<br />
9
RUJUKAN<br />
BELANJA/PERUNTUKAN<br />
(%)<br />
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
1.5 SENARAI <strong>PROJEK</strong> DI BAWAH PAKEJ RANGSANGAN EKONOMI KKR (SEHINGGA 31 OGOS 2010)<br />
AGIHAN ALIRAN TUNAI TAHUNAN<br />
(RM) JUTA<br />
PROGRAM/<strong>PROJEK</strong><br />
PERUNTUKAN<br />
LULUS<br />
(RM)<br />
PERUNTUKAN<br />
SEMASA<br />
(RM)<br />
2009 2010<br />
BIL<br />
<strong>PROJEK</strong><br />
BIL<br />
<strong>PROJEK</strong><br />
SIAP<br />
JUMLAH<br />
BELANJA<br />
(RM)<br />
B<br />
PAKEJ<br />
RANGSANGAN<br />
EKONOMI - FASA<br />
2<br />
853,700,000.00 853,700,000.00 321,149,400.00 532,550,600.00 26 8 332,067,839 38.90%<br />
B1 Sabah 170,000,000.00 170,000,000.00 90,227,800.00 79,772,200.00 3 0 79,760,174 46.92%<br />
B2 Sarawak 344,700,000.00 344,700,000.00 75,615,500.00 269,084,500.00 10 4 53,022,377 15.38%<br />
B3 Pahang(Jerantut) 36,000,000.00 36,000,000.00 31,900,000.00 4,100,000.00 6 3 26,373,237.94 73.30%<br />
B4 Lain-Lain 303,000,000.00 303,000,000.00 125,406,100.00 177,593,900.00 7 1 174,720,051 57.66%<br />
Sumber : Bahagian Pembangunan dan Penswastaan<br />
10
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BAB 2: <strong>MAKLUMAT</strong> KONTRAKTOR<br />
2.1 STATISTIK KONTRAKTOR YANG BERDAFTAR DENGAN PUSAT KHIDMAT KONTRAKTOR (PKK) MENGIKUT<br />
NEGERI DAN KELAS (SEHINGGA 10 MAC 2011)<br />
Kategori<br />
Bilangan Kontraktor<br />
Bumiputra<br />
Bukan Bumiputera<br />
Jumlah<br />
Awam 38,604 2,524 41,128<br />
Elektrik 2,743 811 3,554<br />
Jumlah 41,347 3,335 44,682<br />
2.1.1 Kontraktor <strong>Kerja</strong> Awam<br />
Terdapat enam (6) Kelas pendaftaran bagi Kontraktor <strong>Kerja</strong> Awam dengan PKK yang dikategorikan mengikut had<br />
kewangan, modal berbayar, had kawasan operasi dan kelulusan pegawai teknikal syarikat. Kontraktor yang berdaftar<br />
hanya dibenarkan menyertai tender kerajaan yang dipelawa bagi kelas pendaftaran yang ianya didaftarkan sahaja.<br />
Had kewangan (iaitu kos kerja) dan modal berbayar bagi satu-satu kelas pendaftaran adalah seperti berikut :-<br />
KELAS HAD KEWANGAN (RM) MODAL BERBAYAR (RM)<br />
A > 10 juta 600,001<br />
B 5,000,001 – 10,000,000 400,001<br />
C 2,000,001 – 5,000,000 100,001<br />
D 500,001 – 2,000,000 35,001<br />
E 200,001 – 500,000 17,501<br />
F Sehingga 200,000 10,000<br />
Kepala dan sub-kepala yang wujud dalam pendaftaran Kontraktor <strong>Kerja</strong> Awam ialah :-<br />
Sumber : Pusat Khidmat Kontraktor<br />
11
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
Kepala I - <strong>Kerja</strong> kejuruteraan awam<br />
Kepala II - <strong>Kerja</strong> bangunan<br />
Kepala III - <strong>Kerja</strong> kejuruteraan mekanikal, kejuruteraan pembersihan dan kejuruteraan air<br />
Kepala IV - Lain-lain kerja pakar kejuruteraan awam<br />
Kepala V - <strong>Kerja</strong> kuari, membekal logam dan tanah, kerja angkut dan pengangkutan<br />
Kepala VI - <strong>Kerja</strong>-kerja perhutanan dan pembangunan tanah<br />
Kepala VIII - <strong>Kerja</strong> telekomunikasi<br />
2.1.2 Kontraktor <strong>Kerja</strong> Elektrik<br />
Terdapat empat (4) Kelas pendaftaran bagi Kontraktor <strong>Kerja</strong> Elektrik dengan PKK yang dikategorikan mengikut had<br />
kewangan, modal berbayar, had kawasan operasi dan kelulusan pegawai teknikal syarikat. Kontraktor yang berdaftar<br />
hanya dibenarkan menyertai tender kerajaan yang dipelawa bagi kelas pendaftaran yang ianya didaftarkan sahaja.<br />
Had kewangan (iaitu kos kerja) dan modal berbayar bagi satu-satu kelas pendaftaran adalah seperti berikut :-<br />
KELAS HAD KEWANGAN (RM) MODAL BERBAYAR (RM)<br />
I > 200,000 ribu 100,000<br />
II Sehingga 1,000,000 50,000<br />
III Sehingga 500,000 25,000<br />
IV Sehingga 200,000 7,501<br />
Kepala dan sub-kepala yang wujud dalam pendaftaran Kontraktor <strong>Kerja</strong> Elektrik ialah :-<br />
Kepala VII - <strong>Kerja</strong>-kerja kejuruteraan elektrik<br />
Sumber : Pusat Khidmat Kontraktor<br />
12
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
i) KONTRAKTOR KERJA AWAM<br />
Kelas A Kelas B Kelas C Kelas D Kelas E Kelas F<br />
Bil Negeri B BB B BB B BB B BB B BB B<br />
Jumlah<br />
Keseluruhan<br />
1 IBU PEJABAT PKK 1432 457 774 285 1607 337 0 0 0 0 0 4892<br />
2 JOHOR 0 0 0 0 0 0 350 45 257 33 2,588 3,273<br />
3 KEDAH 0 0 0 0 0 0 149 20 94 4 2,265 2,532<br />
4 KELANTAN 0 0 0 0 0 0 237 5 130 2 2,298 2,672<br />
5 MELAKA 0 0 0 0 0 0 159 25 104 19 1,129 1,436<br />
6 NEGERI SEMBILAN 0 0 0 0 0 0 256 35 171 18 2,103 2,583<br />
7 PAHANG 0 0 0 0 0 0 269 35 167 36 2,173 2,680<br />
8 PERAK 0 0 0 0 0 0 246 63 164 47 2,607 3,127<br />
9 PERLIS 0 0 0 0 0 0 55 10 7 5 1,033 1,110<br />
10 PULAU PINANG 0 0 0 0 0 0 147 64 77 22 1,282 1,592<br />
11 SABAH 116 62 50 37 40 31 266 112 177 71 2,480 3,442<br />
12 SARAWAK 114 43 37 37 37 21 73 51 171 87 920 1,591<br />
13 SELANGOR 0 0 0 0 0 0 669 171 271 70 4,143 5,324<br />
14 TERENGGANU 0 0 0 0 0 0 335 10 151 2 2,335 2,833<br />
15 W. PERSEKUTUAN 0 0 0 0 0 0 337 92 87 60 1,465 2,041<br />
Jumlah Keseluruhan 1,662 562 861 359 1,684 389 3,548 738 2,028 476 28,821 41,128<br />
Sumber : Pusat Khidmat Kontraktor (PKK)<br />
13
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
ii) KONTRAKTOR KERJA ELEKTRIK<br />
Kelas I Kelas II Kelas III Kelas IV Jumlah Jumlah<br />
Keseluruhan<br />
Bil Negeri B BB B BB B BB B BB B BB<br />
1<br />
IBU PEJABAT<br />
PKK<br />
271 146 498 152 1,214 282 0 0 1,983 580 2,563<br />
2 JOHOR 0 0 0 0 0 0 66 10 66 10 76<br />
3 KEDAH 0 0 0 0 0 0 56 3 56 3 59<br />
4 KELANTAN 0 0 0 0 0 0 55 5 55 5 60<br />
5 MELAKA 0 0 0 0 0 0 50 2 50 2 52<br />
6<br />
NEGERI<br />
SEMBILAN<br />
0 0 0 0 0 0 71 5 71 5 76<br />
7 PAHANG 0 0 0 0 0 0 49 6 49 6 55<br />
8 PERAK 0 0 0 0 0 0 80 11 80 11 91<br />
9 PERLIS 0 0 0 0 0 0 12 2 12 2 14<br />
10 PULAU PINANG 0 0 0 0 0 0 31 12 31 12 43<br />
11 SABAH 22 5 7 5 11 14 71 30 111 54 165<br />
12 SARAWAK 11 7 2 10 3 4 12 61 28 82 110<br />
13 SELANGOR 0 0 0 0 0 0 66 23 66 23 89<br />
14 TERENGGANU 0 0 0 0 0 0 56 0 56 0 56<br />
15<br />
W.<br />
PERSEKUTUAN<br />
0 0 0 0 0 0 29 16 29 16 45<br />
Jumlah Keseluruhan 304 158 507 167 1,228 300 704 186 2,743 811 3,554<br />
Sumber : Pusat Khidmat Kontraktor<br />
14
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
2.2 STATISTIK KONTRAKTOR YANG BERDAFTAR DENGAN CIDB MENGIKUT NEGERI DAN KELAS<br />
(SEHINGGA 28 FEB 2011)<br />
Gred<br />
Keupayaan Menender (RM)<br />
G1 Tidak Melebihi 100,000<br />
G2 Tidak Melebihi 500,000<br />
G3<br />
G4<br />
G5<br />
G6<br />
G7<br />
Tidak Melebihi 1 juta<br />
Tidak Melebihi 3 juta<br />
Tidak Melebihi 5 juta<br />
Tidak Melebihi 10 juta<br />
Tiada had<br />
15<br />
Sumber : CIDB
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
NEGERI<br />
GRED<br />
G1 G2 G3 G4 G5 G6 G7<br />
JUMLAH<br />
BESAR<br />
JOHOR 3,250 970 1,124 337 313 133 285 6,412<br />
KEDAH 2,105 497 352 117 140 63 170 3,444<br />
KELANTAN 2,281 291 303 82 141 47 131 3,276<br />
LABUAN 183 26 29 3 11 5 10 267<br />
MELAKA 1,093 336 360 112 123 39 103 2,166<br />
NEGERI SEMBILAN 2,209 391 424 92 125 43 79 3,363<br />
PAHANG 2,141 470 570 158 148 47 117 3,651<br />
PERAK 2,594 577 618 158 185 76 107 4,315<br />
PERLIS 960 85 71 22 25 3 22 1,188<br />
PULAU PINANG 1,356 553 610 130 199 94 245 3,187<br />
SABAH 4,449 854 887 148 207 80 336 6,961<br />
SARAWAK 1,220 517 458 140 185 89 329 2,938<br />
SELANGOR 4,324 1,125 2,031 543 784 264 931 10,002<br />
TERENGGANU 2,272 311 372 146 220 76 174 3,571<br />
WILAYAH<br />
PERSEKUTUAN<br />
1,690 785 1986 474 1,027 381 1,377 7,720<br />
JUMLAH 32,127 7,788 10,195 2,662 3,833 1,440 4,416 62,461<br />
16
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
JOHOR<br />
KEDAH<br />
i) KEJURUTERAAN AWAM<br />
NEGERI<br />
KELANTAN<br />
LABUAN<br />
MELAKA<br />
NEGERI SEMBILAN<br />
PAHANG<br />
PERAK<br />
PERLIS<br />
PULAU PINANG<br />
SABAH<br />
SARAWAK<br />
SELANGOR<br />
GRED<br />
G1 G2 G3 G4 G5 G6 G7<br />
2,928 621 885 296 280 115 260<br />
2,001 341 295 105 130 57 165<br />
2,191 195 283 79 138 44 127<br />
163 14 24 3 11 5 9<br />
1,021 233 294 104 118 37 93<br />
2,120 252 373 83 119 40 75<br />
2,033 334 503 151 140 45 112<br />
2,408 378 505 140 175 66 101<br />
939 38 62 21 25 3 21<br />
1,188 324 414 100 161 87 207<br />
3653 660 698 130 188 73 305<br />
1,117 443 376 114 159 82 318<br />
3,988 707 1,437 417 619 198 792<br />
TERENGGANU<br />
2,191 206 332 140 203 74 170<br />
WILAYAH<br />
PERSEKUTUAN 1,440 410 1,311 348 782 285 1,165<br />
JUMLAH<br />
JUMLAH<br />
BESAR<br />
5,385<br />
3,094<br />
3,057<br />
229<br />
1,900<br />
3,062<br />
3,318<br />
3,773<br />
1,109<br />
2,481<br />
5,707<br />
2,609<br />
8,158<br />
3,316<br />
5,741<br />
29,381 5,156 7,792 2,231 3,248 1,211 3,920 52,939<br />
Sumber : CIDB<br />
17
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
ii) PEMBINAAN BANGUNAN<br />
NEGERI<br />
GRED<br />
G1 G2 G3 G4 G5 G6 G7<br />
JUMLAH<br />
BESAR<br />
JOHOR 3,069 700 974 302 276 116 260 5,697<br />
KEDAH 2,001 345 302 105 131 58 166 3,108<br />
KELANTAN 2,176 194 282 82 138 45 126<br />
LABUAN 174 18 25 3 10 5 8 243<br />
MELAKA 1,048 246 305 106 114 38 92<br />
NEGERI SEMBILAN 2,145 266 384 87 120 39 74<br />
PAHANG 2,017 337 485 150 140 44 110<br />
PERAK 2,391 406 535 141 178 69 98 3,818<br />
PERLIS 938 41 62 21 25 3 21 1,111<br />
PULAU PINANG 1,258 372 489 104 166 84 211 2,684<br />
SABAH 3,963 703 807 139 195 72 306 6,185<br />
SARAWAK 1,133 447 374 114 157 79 312 2,616<br />
SELANGOR 4,065 773 1,580 436 627 192 785 8,458<br />
TERENGGANU 2,133 203 324 139 201 73 169 3,242<br />
WILAYAH<br />
PERSEKUTUAN<br />
1,543 468 1,463 370 799 285 1,136 6,064<br />
JUMLAH 30,054 5,519 8,391 2,299 3,277 1,202 3,874 54,616<br />
3,043<br />
1,949<br />
3,115<br />
3,283<br />
18<br />
Sumber : CIDB
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
iii) MEKANIKAL DAN ELEKTRIKAL<br />
NEGERI<br />
GRED<br />
G1 G2 G3 G4 G5 G6 G7<br />
JUMLAH<br />
BESAR<br />
JOHOR 210 326 213 59 78 37 79 1,002<br />
KEDAH 111 181 68 22 24 9 31 446<br />
KELANTAN 141 124 48 7 26 12 28 386<br />
LABUAN 11 10 9 1 5 1 4 41<br />
MELAKA 68 117 74 17 27 5 32 340<br />
NEGERI SEMBILAN 110 163 77 15 24 10 21 420<br />
PAHANG 124 155 113 19 25 14 36 486<br />
PERAK 148 180 83 23 23 24 28 509<br />
PERLIS 40 50 16 3 2 0 3 114<br />
PULAU PINANG 132 212 154 36 47 19 69 669<br />
SABAH 252 147 113 23 38 19 99 691<br />
SARAWAK 113 91 102 36 46 30 123 541<br />
SELANGOR 341 462 579 182 305 138 366 2,374<br />
TERENGGANU 133 119 106 24 53 21 39 495<br />
WILAYAH<br />
PERSEKUTUAN<br />
204 332 632 149 372 179 581 2,449<br />
JUMLAH 2,138 2,669 2,387 616 1,095 518 1,539 10,962<br />
Sumber : CIDB<br />
19
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
2.3 STATISTIK BILANGAN PENGELUAR/PEMBEKAL BAHAN BINAAN BUMIPUTERA MENGIKUT NEGERI<br />
(SEHINGGA 28 FEBRUARI 2011)<br />
BIL. NEGERI BILANGAN<br />
1 Johor 31<br />
2 Kedah 47<br />
3 Kelantan 26<br />
4 Melaka 27<br />
5 Negeri Sembilan 16<br />
6 Pahang 17<br />
7 Perak 56<br />
8 Perlis 8<br />
9 Pulau Pinang 23<br />
10 Selangor 90<br />
11 Terengganu 66<br />
12 W. Persekutuan 33<br />
13 Sabah 14<br />
14 Sarawak 13<br />
Jumlah Keseluruhan 467<br />
Sumber : Bahagian Pembangunan Bumiputera<br />
20
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
2.4 PINJAMAN SKIM WANG AMANAH KONTRAKTOR (SKWAK) 2009 – 28 Februari 2011<br />
2009 2010 2011<br />
BIL.<br />
NEGERI<br />
PERMOHONAN<br />
DILULUSKAN<br />
AMAUN<br />
(RM JUTA)<br />
PERMOHONAN<br />
DILULUSKAN<br />
AMAUN<br />
(RM JUTA)<br />
PERMOHONAN<br />
DILULUSKAN<br />
AMAUN<br />
(RM JUTA)<br />
1 Johor 6 1.780 - - - -<br />
2 Kedah 2 0.370 4 0.680 - -<br />
3 Kelantan 3 0.940 - - - -<br />
4 Melaka 2 0.460 5 0.909 - -<br />
5 Negeri Sembilan 0 0 - - - -<br />
6 Pahang 6 1.985 3 0.770 - -<br />
7 Perak 0 0 - - - -<br />
8 Perlis 3 0.880 - - - -<br />
9 Pulau Pinang 2 0.400 - - - -<br />
10 Sabah 0 0 - - - -<br />
11 Sarawak 0 0 - - - -<br />
12 Selangor / WP<br />
KL<br />
4 0.670 - - - -<br />
13 Terengganu 2 0.800 1 0.280 2 0.47<br />
JUMLAH 30 8.285 13 2.639 2 0.47<br />
Sumber : Bahagian Pembangunan Bumiputera<br />
21
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
B A B 3 : INDUSTRIALISED BUILDING SYSTEM (IBS)<br />
3.1 <strong>PROJEK</strong>-<strong>PROJEK</strong> RMK-9 MENGGUNAKAN KAEDAH IBS (31 DISEMBER 2011)<br />
Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />
22
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
3.2 ANALISIS STATUS AKTIVITI <strong>PROJEK</strong> MENGGUNAKAN KAEDAH IBS MENGIKUT AGENSI PELAKSANA<br />
PELANGGAN<br />
Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />
23
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
3.3 ANALISIS STATUS AKTIVITI <strong>PROJEK</strong> MENGGUNAKAN KAEDAH IBS MENGIKUT KEMENTERIAN<br />
Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />
24
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
(.....sambungan)<br />
Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />
25
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
3.4 TABURAN <strong>PROJEK</strong> MENGGUNAKAN KAEDAH IBS MENGIKUT NEGERI<br />
Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />
26
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />
27
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
3.5 BILANGAN PENGELUAR KOMPONEN IBS YANG BERDAFTAR DENGAN CIDB (30 SEPTEMBER 2010)<br />
Sumber : CIDB<br />
28
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
3.6 BILANGAN PENGELUAR DAN KOMPONEN IBS YANG BERDAFTAR DENGAN CIDB<br />
Sumber : CIDB<br />
29
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
3.7 TABURAN KONTRAKTOR DAN PENGELUAR IBS BERDAFTAR DENGAN CIDB MENGIKUT NEGERI<br />
Sumber : CIDB<br />
30
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
Sumber : CIDB<br />
31
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
B A B 4 : <strong>MAKLUMAT</strong> J A L A N P E R S E K U T U A N D A N<br />
J A M B A T A N<br />
4.1 STATISTIK JALAN PERSEKUTUAN (BUKAN BERTOL)<br />
Negeri<br />
PERSEKUTUAN<br />
JUMLAH<br />
Gravel<br />
Paved (KM)<br />
Earth (KM) (KM)<br />
(KM)<br />
Johor 2,343.87 0.00 0.00 2,343.87<br />
Melaka 246.05 0.00 0.00 246.05<br />
Negeri Sembilan 1,319.13 3.10 0.00 1,322.23<br />
Selangor 975.08 0.00 0.00 975.08<br />
Perak 1,461.74 0.00 0.00 1,461.74<br />
Pulau Pinang 190.04 0.00 0.00 190.04<br />
Kedah 968.00 0.00 0.00 968.00<br />
Perlis 211.30 0.00 0.00 211.30<br />
Pahang 3,753.67 7.30 0.00 3,760.97<br />
Terengganu 1,151.09 0.00 0.00 1,151.09<br />
Kelantan 1,189.09 0.00 0.00 1,189.09<br />
W.P. Putrajaya 80.34 0.00 0.00 80.34<br />
Semenanjung <strong>Malaysia</strong> (a) 13,889.39 10.40 0.00 13,889.86<br />
Sabah 1,501.84 0.00 0.00 1,501.84<br />
Sarawak 1,423.79 0.00 0.00 1,423.79<br />
W.P Labuan 98.20 0.00 0.00 98.20<br />
<strong>Malaysia</strong> Timur (b) 3,032.83 0.00 0.00 3,032.83<br />
JUMLAH (a+b) 16,922.22 10.40 0.00 16,932.66<br />
1. Data bagi Jalan Paved adalah<br />
berdasarkan maklumat pewartaan<br />
sehingga 31.12.2009.<br />
2. Data bagi Jalan Gravel & Earth<br />
adalah berdasarkan Statistik Jalan<br />
2009 JKR.<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
32
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
4.2 STATISTIK JALAN NEGERI (TAHUN 2009)<br />
Negeri<br />
JALAN NEGERI<br />
JUMLAH<br />
Gravel<br />
Paved (KM)<br />
Earth (KM) (KM)<br />
(KM)<br />
Johor 10,604.54 285.74 324.21 11,214.49<br />
Melaka 1,581.05 282.12 20.73 1,883.90<br />
Negeri Sembilan 5,965.81 300.89 586.00 6,852.70<br />
Selangor 12,132.59 677.88 772.21 13,582.68<br />
Perak 6,364.38 678.18 52.79 7,095.36<br />
Pulau Pinang 2,069.03 15.16 76.47 2,160.67<br />
Kedah 5,338.69 219.31 370.70 5,928.70<br />
Perlis 638.88 130.40 93.60 862.88<br />
Pahang 6,824.14 337.33 764.23 7,925.71<br />
Terengganu 4,912.23 236.09 429.18 5,577.49<br />
Kelantan 4,431.08 197.49 346.35 4,974.92<br />
WP K. Lumpur 1,138.18 19.08 0.00 1,157.26<br />
Jumlah kecil 62,000.60 3,379.67 3,836.47 69,216.76<br />
Sabah 6,482.26 10,618.68 1533.58 18,634.53<br />
Sarawak 12,873.05 2,328.88 2,906.06 18,108.00<br />
WP Labuan 76.20 35.53 4.12 115.85<br />
Jumlah kecil 19,431.51 12,983.09 4443.76 36,858.38<br />
JUMLAH 81,432.12 16,362.76 8,280.23 106,075.14<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
33
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
4.3 SENARAI JALAN PERSEKUTUAN<br />
Kategori Jalan Persekutuan<br />
Bilangan<br />
Utama 285<br />
Felda 390<br />
Industri 47<br />
Institusi Utama 106<br />
JUMLAH 828<br />
4.4 STATISTIK JAMBATAN PERSEKUTUAN MENGIKUT NEGERI<br />
NEGERI<br />
BILANGAN<br />
KEDAH 611<br />
PERLIS 44<br />
PULAU PINANG 353<br />
PERAK 2,353<br />
SELANGOR 390<br />
KELANTAN 464<br />
TERENGGANU 805<br />
PAHANG 1,512<br />
JOHOR 1,029<br />
WILAYAH PERSEKUTUAN (LABUAN) 3<br />
MELAKA 158<br />
NEGERI SEMBILAN 483<br />
JUMLAH 8,205<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
34
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
4.5 SKOP KERJA RUTIN PENYENGGARAAN JALAN PERSEKUTUAN<br />
ITEM PERKARA PUSINGAN KERJA<br />
R01<br />
R02<br />
R03<br />
R04<br />
Menampal pothole<br />
Meratakan bahu jalan<br />
Memotong rumput<br />
Mencuci perabot jalan<br />
Patching pothole siap sepenuhnya dalam masa satu hari.<br />
Perlu apabila perbezaan dengan aras jalan melebihi 50mm. (Tertakluk<br />
kepada syarat perjanjian, iaitu sebanyak maksima 10% setahun daripada<br />
keluasan keseluruhan bahu jalan yang disenggara)<br />
Semua Jalan Persekutuan<br />
- 12 kali/tahun<br />
i) Jalan Protokol -4 kali/tahun<br />
ii) Jalan ‘Primary’-2 kali/tahun<br />
iii) Jalan ‘Secondary’-2 kali/tahun<br />
R05<br />
R07<br />
B<br />
Mencuci pembetung dan<br />
jambatan<br />
Mencuci longkang<br />
Pemeriksaan berjadual<br />
i) Jalan Protokol -4 kali/tahun<br />
ii) Jalan ‘Primary’-2 kali/tahun<br />
iii) Jalan ‘Secondary’-2 kali/tahun<br />
i) Jalan Protokol- 4 kali/tahun<br />
ii) Jalan ‘Primary’-2 kali/tahun<br />
iii) Jalan ‘Secondary’-2 kali/tahun<br />
Semua Jalan Persekutuan<br />
- 2 kali/minggu<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
35
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
4.6 SENARAI KONSESI PENYENGGARAAN JALAN PERSEKUTUAN<br />
BIL<br />
SYARIKAT /<br />
KONSESI<br />
1 Roadcare(M) Sdn Bhd<br />
2<br />
3<br />
Selia Senggara<br />
Selatan Sdn Bhd<br />
Belati Wangsa (M)<br />
Sdn Bhd<br />
4 Gammerlite Sdn Bhd<br />
5<br />
Lintasan<br />
Sdn Bhd<br />
Resources<br />
ZON<br />
Tengah Dan<br />
Timur<br />
Selatan<br />
Utara<br />
Pantai Timur<br />
Sabah<br />
Pantai Barat<br />
Sabah Dan WP<br />
Labuan<br />
6 PPES Works Sdn Bhd Sarawak Zon 1<br />
7<br />
8<br />
HCM Engineering Sdn<br />
Bhd<br />
Endaya Construction<br />
Sdn Bhd<br />
NEGERI<br />
Selangor, Pahang,<br />
Terengganu, Kelantan<br />
Johor, Melaka, Negeri<br />
Sembilan<br />
Perak, Pulau Pinang,<br />
Kedah, Perlis<br />
Sandakan, Telupid,<br />
Lahad Datu, Kunak,<br />
Beluran, Tawau<br />
Kota Kinabalu, Tenom,<br />
Sipitang, Beaufort,<br />
Keningau, Kota Belud,<br />
Kudat dan WP Labuan<br />
Kuching, Samarahan,<br />
Sri Aman, Betong,<br />
Sarikei<br />
TEMPOH<br />
KONSESI<br />
(TAHUN)<br />
TEMPOH KONTRAK<br />
15 16/02/2001 – 15/2/2016<br />
15 16/02/2001 – 15/2/2016<br />
15 16/02/2001 – 15/2/2016<br />
15 1/9/2003 – 31/8/2018<br />
15 1/9/2003 – 31/8/2018<br />
15 1/9/2003 – 31/8/2018<br />
Sarawak Zon 2A Sibu, Bintulu 15 1/9/2003 – 31/8/2018<br />
Sarawak Zon 2B Miri, Limbang, Lawas 15 1/9/2003 – 31/8/2018<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
36
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
4.7 SENARAI JALAN BELUM DIWARTAKAN DI BAWAH AKTA JALAN PERSEKUTUAN 1959 (<br />
(SEHINGGA 28 FEBRUARI 2011)<br />
Bil<br />
NEGERI SEMBILAN<br />
Nama Jalan<br />
Kilometer<br />
(KM)<br />
1 Jalan Kampung Gedes 3.35<br />
2 Jalan Tampin Lama 1.98<br />
PAHANG<br />
3 Jalan Mentiga - Kertau 45.00<br />
4 Jalan Pos Slim-Loging 11.70<br />
5 Jalan Pintasan Gebeng 17.00<br />
PERAK<br />
6 Jalan Damar Laut Segari 5.70<br />
7 Jalan Ipoh – Kuala Kangsar (Jalan Tuanku Abdul Rahman) 6.60<br />
8 Jalan Gopeng – Siputeh 9.20<br />
KEDAH<br />
9 Jalan Lunas – Kupang, Baling 32.20<br />
10 Jalan Pintas Kuala Pegang 2.50<br />
11 (Jalan Baling-Kupang-Lunas) Jalan Kupang - Grik 61.78<br />
12 Jalan Kupang/Kg. Sedek/Kg. Pisang (K171) dan Kg.<br />
Hangus/Jerai/Tiak/Kuala Kuang (K173), Baling<br />
13 Jalan Masuk Kedua ke Kawasan Perindustrian Kulim 4.92<br />
14<br />
(Jalan Langgar) Jalan dari Simpang Hutan Kampong ke Pejabat Pos<br />
Lama Jalan Raja<br />
5.00<br />
5.63<br />
37
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
Bil<br />
Nama Jalan<br />
Kilometer<br />
(KM)<br />
15 (Jalan Lencongan Barat) Jalan Lencongan Barat Sungai Petani 12.00<br />
16<br />
(Jalan Ulu Melaka-Makam Mahsuri) Jalan Ulu Melaka ke Makam<br />
Mahsuri, Langkawi<br />
17 (Jalan Sultan Bahiyah) Lebuhraya Sultan Bahiyah 13.84<br />
KELANTAN<br />
6.03<br />
18<br />
Laluan D28 (Jalan Tanah Merah - Kampung Putat - Simpang 3 Batu<br />
Empat) ke Km 57.03 (Jalan Machang - Jeli)<br />
7.80<br />
19 Laluan D24/D22 (Jalan Pasir Mas - Pohon Tanjong - Rantau Panjang) 16.46<br />
20 Laluan D27 (Jalan Tanah Merah Bukit Gading - Alor Pasir - Lubok Jong) 14.00<br />
21 Jalan Tuju ke Jambatan Baru Bukit Bunga, Tanah Merah 1.65<br />
PERLIS<br />
22 Jalan Ulu Pauh Chuping Padang Besar 28.50<br />
JUMLAH 312.84<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
38
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
4.8 SENARAI 10 LOKASI BLACKSPOT<br />
10 lokasi Kawasan Tertinggi Kerap Berlaku Kemalangan (Mengikut Keutamaan KPI YB Menteri)<br />
Bil<br />
Lokasi<br />
No<br />
Laluan<br />
No<br />
Seksyen<br />
Negeri Daerah Skop <strong>Kerja</strong> Pembaikan<br />
1<br />
Jalan Muar - Melaka (Tanjung<br />
Gading), Johor<br />
2 Jalan Serting Tengah<br />
FT005 189 Johor Muar<br />
FT010 41.8 N.Sembilan<br />
Jempol<br />
3 Jalan Damar Laut - Pantai Remis FT060 35.2 Perak Manjung<br />
4<br />
Jalan Alor Setar - Kangar - Padang<br />
Besar<br />
FT007 km 33 Perlis -<br />
5 Jalan Butterworth - Alor Setar FT001 833.1 Kedah Yan<br />
6 Jalan Kuala Terengganu - Kuantan FT003 399 Terengganu Kemaman<br />
7 Jalan Kuantan - Segamat<br />
8<br />
9<br />
10<br />
FT012 39 Pahang Rompin<br />
Jalan Gua Musang - Kuala Krai FT008 259.5 Kelantan Gua Musang<br />
Jalan Batu Pahat - Kluang FT050 16 Johor Batu Pahat<br />
Kuala<br />
Jalan Klang - Teluk Intan FT005 468 Selangor Selangor<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
Pemasangan perabut dan<br />
garisan jalan<br />
39
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
4.9 <strong>MAKLUMAT</strong> PERUNTUKAN BAGI KERJA-KERJA MEMBAIKI CERUN DI JALAN PERSEKUTUAN (TAHUN 2010)<br />
Peruntukan Pembaikan Cerun B27<br />
RM30,300,000<br />
Peratus Perbelanjaan daripada peruntukan tahunan 0.88%<br />
Tarikh Kemaskini : 28/02/11<br />
Bil<br />
Negeri<br />
Jumlah<br />
peruntukan<br />
(RM)<br />
Peruntukan<br />
Pembaikan<br />
Cerun B27 (RM)<br />
Peruntukan Program<br />
Rangsangan B11-Fasa I<br />
(RM)<br />
Perbelanjaan (RM)<br />
1 Perak 1,090,000.00 0.00 0.00% 18<br />
2 Selangor 1,910,000.00 0.00 0.00% 11<br />
3 Pahang 0.00 0.00%<br />
4 Kelantan 0.00 0.00%<br />
5 Johor 2,200,000.00 0.00 0.00% 26<br />
6 Kedah 970,000.00 0.00 0.00% 16<br />
7 Labuan 750,000.00 0.00 0.00% 3<br />
8 Melaka 1,720,000.00 0.00 0.00% 14<br />
9 Negeri Sembilan 1,842,000.00 0.00 0.00% 14<br />
10 Pulau Pinang 1,340,000.00 0.00 0.00% 16<br />
11 Perlis 200,000.00 0.00 0.00% 1<br />
12 Terengganu 930,000.00 0.00 0.00% 16<br />
13 Sabah 4,500,000.00 0.00 0.00% 9<br />
14 Sarawak 3,320,000.00 0.00 0.00% 17<br />
15 Senggara Cerun 0.00 0.00%<br />
Jumlah 20,772,000.00 0.00 0.00% 161<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
40
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BAB 5 : <strong>MAKLUMAT</strong> BANGUNAN GUNASAMA PERSEKUTUAN<br />
5.1 SENARAI BANGUNAN GUNASAMA PERSEKUTUAN (SEHINGGA 28 FEBRUARI 2011)<br />
BIL ZON NEGERI NAMA BANGUNAN<br />
1<br />
TAHUN SIAP<br />
DIBINA<br />
USIA<br />
BANGUNAN<br />
KELUASAN<br />
(lettable area)<br />
ft2<br />
4<br />
Sabah<br />
Sabah Bangunan Persekutuan Tawau 1982 28 92,971.68 1<br />
5 Sabah Bangunan Persekutuan Kota Belud 2000 10 31,255.00 1<br />
BIL. BLOK<br />
Sabah Rumah Persekutuan Beaufort 1983 27 20,940.82 1<br />
2 Sabah Rumah Persekutuan Keningau 1989 21 15,522.12 1<br />
3 Sabah Bangunan Persekutuan Sandakan 1983 27 91,783.88 1<br />
6 Sabah Wisma Dang Bandang 1977 33 68,618.56 1<br />
7 Sabah Rumah Persekutuan Kota Kinabalu 1972 38 107,030.01 1<br />
8 Sabah<br />
Kompleks Pentadbiran Kerajaan<br />
Persekutuan Sabah<br />
2008 5 747,873.43 5<br />
Jumlah Kecil 1,175,995.5 12<br />
8<br />
Kedah Bangunan Persekutuan Alor Star 1963 47 25,714.12 2<br />
9 Kedah Wisma Persekutuan Alor Star 1973 37 109,629.73 1<br />
Utara<br />
10 Kedah<br />
11 Perlis<br />
Kompleks Pentadbiran Kerajaan Persekutuan<br />
Bandar Muadzam Shah, Alor Setar<br />
Bangunan Persekutuan Kangar (Jln.<br />
Persiaran Jubli Emas)<br />
2008 2 696,697.26 7<br />
1996 14 110,740.30 1<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
41
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BIL ZON NEGERI NAMA BANGUNAN<br />
12 Perlis<br />
Bangunan Persekutuan Kangar Tun Hj.<br />
Abdul Razak<br />
TAHUN SIAP<br />
DIBINA<br />
USIA<br />
BANGUNAN<br />
KELUASAN<br />
(lettable area)<br />
ft2<br />
BIL. BLOK<br />
1977 33 21,596.24 1<br />
13 Perlis<br />
14 Pulau Pinang<br />
Bangunan Persekutuan Kangar (Lama), Jln.<br />
Hospital<br />
Bangunan Pejabat Kerajaan Persekutuan<br />
KOMTAR (tkt. 36 - tkt. 42)<br />
1962 48 7,823.92 1<br />
1974 36 103,671.32 1<br />
15 Pulau Pinang Bangunan Tunku Syed Putra 1959 51 100,498.62 1<br />
16 Pulau Pinang<br />
Bangunan Persekutuan Pulau Pinang (Jalan<br />
Anson)<br />
2004 6 169,714.00 1<br />
17 Perak Wisma Persekutuan Taiping 1986 24 109,024.36 1<br />
18 Perak<br />
19 Perak<br />
Bangunan Persekutuan Ipoh<br />
(Jln. Pamglima Bukit Gantang Wahab)<br />
Bangunan Persekutuan Ipoh<br />
(Greentown)<br />
1962 48 33,150.43 2<br />
1996 14 179,716.39 1<br />
20 Perak Bangunan Persekutuan Sri Manjung 1996 14 43,297.22 1<br />
21 Perak Bangunan Persekutuan Teluk Intan 1973 37 30,399.26 2<br />
22 Perak Bangunan Persekutuan Gerik 1997 13 49,499.12 1<br />
23<br />
Selatan<br />
24 Johor<br />
Jumlah Kecil 1,094,475.03 24<br />
Johor Wisma Persekutuan Johor Bahru 1976 34 211,994.76 2<br />
Kompleks Sultan Abu Bakar (CIQ), Gelang<br />
Patah<br />
1996 14 196,732.92 23<br />
42
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BIL ZON NEGERI NAMA BANGUNAN<br />
TAHUN SIAP<br />
DIBINA<br />
USIA<br />
BANGUNAN<br />
KELUASAN<br />
(lettable area)<br />
ft2<br />
BIL. BLOK<br />
25 Johor Bangunan Gunasama Persekutuan Kluang 1997 13 47,674.00 1<br />
26 Johor<br />
27<br />
Negeri<br />
Sembilan<br />
Bangunan Gunasama Persekutuan Batu<br />
Pahat<br />
1997 13 46,323.95 1<br />
Wisma Persekutuan Seremban 1979 31 176,103.95 1<br />
28 Melaka<br />
Bangunan Pejabat-Pejabat Pelabuhan<br />
Melaka<br />
1964 46 9,157.66 1<br />
29 Melaka Wisma Persekutuan Melaka 1974 36 112,991.02 1<br />
Jumlah Kecil 800,978.26 30<br />
30<br />
Sarawak<br />
Wisma Persekutuan Sri Aman Blok 2, Blok 3<br />
& Blok 4<br />
1993 17<br />
16,255.85<br />
(Blok 2)<br />
30,688.00<br />
(Blok 3&4)<br />
3<br />
31 Sarawak Bangunan Sultan Iskandar, Kuching 1988 22 265,146.53 1<br />
32 Sarawak Wisma Persekutuan Sri Aman Blok 1 1975 35 11,434.50 1<br />
33 Sarawak Wisma Persekutuan Saratok 1992 18 14,015.13 1<br />
Sarawak<br />
34 Sarawak Wisma Persekutuan Sarikei Blok I & II 1978 32 31,471.48 2<br />
35 Sarawak Wisma Persekutuan Sibu Blok 1 & 2 1976 34 36,475.66 2<br />
36 Sarawak Wisma Persekutuan Kapit 1979 31 22,031.98 1<br />
37 Sarawak Wisma Persekutuan Miri Blok 1 & 2 1973 37 33,561.50 2<br />
38 Sarawak Wisma Persekutuan Miri Blok A & B 1996 14 28,036.72 2<br />
43
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BIL ZON NEGERI NAMA BANGUNAN<br />
TAHUN SIAP<br />
DIBINA<br />
USIA<br />
BANGUNAN<br />
KELUASAN<br />
(lettable area)<br />
ft2<br />
39 Sarawak Wisma Persekutuan Lawas 1978 32 12,554.47 1<br />
40 Sarawak Wisma Persekutuan Marudi 1996 14 9,428.74 1<br />
41 Sarawak<br />
Wisma Persekutuan Limbang II<br />
( Blok A & B )<br />
BIL. BLOK<br />
1974 36 15,125.42 2<br />
42 Sarawak Wisma Persekutuan Bintulu 1983 27 14,135.69 1<br />
43 Sarawak Wisma Persekutuan Limbang I 1972 38 8,882.15 1<br />
44 Sarawak<br />
Bangunan Tun Datuk Patinggi Tuanku Haji<br />
Bujang, Kuching<br />
1972 38 140,069.69 1<br />
45 Sarawak Wisma Persekutuan Sibu Blok 3 1992 18 74,780.33 1<br />
Jumlah Kecil 764,093.84 23<br />
46<br />
Kelantan Bangunan Persekutuan Kota Bharu 1963 47 38,484.86 3<br />
47 Kelantan Bangunan Persekutuan Kuala Krai 1982 28 20,312.52 1<br />
48 Kelantan Wisma Persekutuan Kota Bahru 1975 35 155,809.98 1<br />
49 Kelantan Bangunan Persekutuan Gua Musang 1989 21 59,659.47 1<br />
50<br />
Timur<br />
Pahang Bangunan Persekutuan Raub 1995 15 53,858.75 1<br />
51 Pahang Wisma Persekutuan Kuantan 1979 31 147,461.41 1<br />
52 Pahang Bangunan Persekutuan Maran 1995 15 52,394.74 1<br />
53 Pahang Bangunan Persekutuan Temerloh 2001 9 71,995.00 1<br />
54 Terengganu Wisma Persekutuan Kuala Terengganu 1975 35 145,398.17 1<br />
44
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BIL ZON NEGERI NAMA BANGUNAN<br />
TAHUN SIAP<br />
DIBINA<br />
USIA<br />
BANGUNAN<br />
KELUASAN<br />
(lettable area)<br />
ft2<br />
55 Terengganu Bangunan Persekutuan Kemaman 1994 16 51,334.81 1<br />
56 Terengganu Bangunan Persekutuan Besut 1995 15 50,698.22 1<br />
BIL. BLOK<br />
Jumlah Kecil 847,407.93 13<br />
57<br />
58<br />
59<br />
Tengah<br />
Kuala<br />
Lumpur<br />
Kuala<br />
Lumpur<br />
Kuala<br />
Lumpur<br />
Rumah Persekutuan Kuala Lumpur 1954 56 86,548.00 1<br />
Kompleks Kerajaan Bukit Perdana, Kuala Lumpur 1952 58 474,180.00 13<br />
Kompleks Kerajaan Jalan Duta, Kuala Lumpur 1978 32 998,360.00 5<br />
60 Selangor Bangunan Persekutuan Petaling Jaya, Selangor 1958 52 87,566.00 1<br />
Jumlah Kecil 1,646,654.00 20<br />
JUMLAH KESELURUHAN - 6,329,604.56 122<br />
Nota: Keluasan bagi Kompleks Pentadbiran Kerajaan Persekutuan Bandar Muadzam Shah, Alor Setar adalah anggaran sahaja kerana belum<br />
pengesahan daripada Jabatan Penilaian dan Perkhidmatan Harta, <strong>Kementerian</strong> Kewangan.<br />
menerima<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
45
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
5.2 SKOP PENYENGGARAAN BANGUNAN PERSEKUTUAN<br />
BIL KRITERIA ASPEK PENYELENGGARAAN<br />
1 PEMBERSIHAN DAN PENCUCIAN<br />
2 KERJA-KERJA SENGGARAAN ‘CIVIL’<br />
3 LIF<br />
4 KAWALAN KESELAMATAN<br />
i) Ruang Pejabat dan Kawasan Koridor<br />
ii) Tandas<br />
iii) Pest Control<br />
iv) Lanskap<br />
v) Longkang<br />
vi) Dinding luar<br />
i) Dinding<br />
ii) Lantai<br />
iii) Siling, pintu, tingkap dan jeriji<br />
iv) Gutter, Rain Water Down Pipe and Drain<br />
v) Bumbung<br />
vi) Dataran Kejat<br />
vii) Plumbing and Sanitary fitting<br />
viii) Cat<br />
ix) Papan Tanda<br />
x) Booster pump<br />
xi) Sewerage system<br />
i) Kebersihan lantai dan dinding lif<br />
ii) Kemasan lantai dan dinding<br />
iii) Fungsi ‘indicator lift’<br />
iv) Fungsi lampu dan ‘alarm bell’<br />
v) Sijil Perakuan Kelayakan Mesin Angkut<br />
vi) Kebersihan dalam ’Lift Motor Room’<br />
vii) Levelling lift car<br />
viii) Nombor PMA<br />
i) Rondaan keseluruhan kawasan<br />
ii) Kawalan pintu masuk dan keluar bangunan<br />
iii) Laporan<br />
46
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BIL KRITERIA ASPEK PENYELENGGARAAN<br />
5 KERJA-KERJA SENGGARAAN MEKANIKAL<br />
6 KERJA-KERJA SENGGARAAN ELEKTRIKAL<br />
7 PEMBAYARAN BIL-BIL UTILITI<br />
8<br />
COMPUTERISED MANAGEMENT<br />
INFORMATION SYSTEM<br />
iv) Keadaan pondok kawalan<br />
v) Kaunter pengawal di Lobby<br />
vi) Kekemasan pengawal bertugas<br />
vii) Keadaan pagar keselamatan<br />
i) Chiller<br />
ii) Cooling Tower<br />
iii) Air Handling Unit (AHU)<br />
iv) Ducting and Diffuser<br />
v) Split unit<br />
vi) Pump System<br />
vii) Water Tank<br />
viii) Break glass and alarm bell<br />
ix) Smoke/Heat Detector<br />
x) Water riser/Hose Reel<br />
xi) Portable Fire Extinguisher<br />
i) Generator set<br />
ii) Main Swicth Board<br />
iii) Lighting<br />
iv) Public Address System<br />
v) PA System<br />
vi) PABX System<br />
vii) Lighting Protection System<br />
viii) Luminaries<br />
i) Bil lektrik<br />
ii) Bil air<br />
iii) Bil pembentungan<br />
i) Development system<br />
ii) Monitoring system<br />
iii) Maintenance system<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
47
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
5.3 SENARAI KONSESI PENYENGGARAAN BANGUNAN PERSEKUTUAN<br />
BIL.<br />
PERKARA<br />
ZON<br />
SELATAN &<br />
SARAWAK<br />
UTARA & SABAH TIMUR TENGAH<br />
1 Syarikat Konsesi<br />
Ambang Wira Sdn.<br />
Bhd.<br />
Gemilang<br />
Maintenance Services<br />
Sdn. Bhd.<br />
Building Lindungan<br />
Sdn. Bhd.<br />
2 Tempoh Perjanjian Induk 10 Tahun + 5 Tahun 10 Tahun + 5 Tahun 10 Tahun + 5 Tahun<br />
3<br />
4<br />
Tarikh Perjanjian Induk untuk<br />
Tempoh 10 Tahun<br />
Tarikh Penyambungan<br />
Tempoh Konsesi Untuk<br />
Tempoh 5 Tahun<br />
01hb Jun 1998 - 31hb.<br />
Mei 2008<br />
01hb. Jun 2008 - 1hb.<br />
Mei 2013<br />
16hb. Mac 2001 -<br />
15hb. Mac 2011<br />
Dalam Proses<br />
Permohonan<br />
01hb. April 2001 -<br />
31hb. Mac 2011<br />
Dalam Proses<br />
Permohonan<br />
Belum<br />
diswastakan<br />
5 Yuran Tahunan (RM) 30,401,441.28 26,206,649.88 10,246,606.80<br />
6 Yuran Bulanan (RM) 2,533,453.44 2,183,887.49 853,883.90<br />
7 Bil. Lokasi Bangunan Selatan :7 Utara : 15<br />
Sarawak :16 Sabah : 7<br />
8 Bil. Blok Bangunan Selatan :30 Utara : 24<br />
Sarawak :23 Sabah : 7<br />
11 4<br />
13 20<br />
9<br />
Jumlah Keluasan Bangunan<br />
(ft2)<br />
1,565,072.13 2,679,672.98 847,407.94 1,646,654.00<br />
Nota : Jumlah keluasan bangunan bagi Zon Utara & Sabah adalah anggaran sahaja kerana keluasan bagi Kompleks Pentadbiran Kerajaan Persekutuan<br />
Bandar Muadzam Shah, Alor Setar belum menerima pengesahan daripada Jabatan Penilaian dan Perkhidmatan Harta, <strong>Kementerian</strong> Kewangan.<br />
Sumber: Bahagian Kawalselia Penyenggaraan<br />
48
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BAB 6 : <strong>MAKLUMAT</strong> LEBUHRAYA<br />
6.1 SENARAI LEBUHRAYA BERTOL YANG BEROPERASI (30 JANUARI 2011)<br />
BIL KOD NAMA LEBUHRAYA SINGKATAN PANJANG<br />
1. E1/E2 LEBUHRAYA UTARA SELATAN PLUS 823.3 km<br />
SISTEM<br />
TOL<br />
Terbuka<br />
dan<br />
Tertutup<br />
BILANGAN<br />
R&R<br />
22<br />
2. E3 LEBUHRAYA LALUAN KEDUA MALAYSIA-SINGAPURA LINKEDUA 44.7 km Terbuka 2<br />
3. E5 LEBUHRAYA SHAH ALAM KESAS 35.0 km Terbuka 2<br />
4. E6 LEBUHRAYA UTARA-SELATAN HUBUNGAN TENGAH ELITE 46.6 km Tertutup 3<br />
5. E7 LEBUHRAYA CHERAS-KAJANG<br />
GRAND<br />
SAGA<br />
11.5 km Terbuka 1<br />
6. E8 LEBUHRAYA KUALA LUMPUR-KARAK KLK 60.0 km Terbuka 1<br />
7. E8 LEBUHRAYA PANTAI TIMUR FASA 1 LPT 1 169.0 km Tertutup 4<br />
8. E9 LEBUHRAYA SUNGAI BESI BESRAYA 16.7 km Terbuka 3<br />
9. E10 LEBUHRAYA PANTAI BARU NPE 19.6 km Terbuka -<br />
10. E11 LEBUHRAYA DAMANSARA-PUCHONG LDP 40.0 km Terbuka -<br />
11. E12 LEBUHRAYA BERTINGKAT KUALA LUMPUR-AMPANG AKLEH 7.9 km Terbuka -<br />
12 E 13 LEBUHRAYA KEMUNING - SHAH ALAM LKSA 14.7 km Terbuka -<br />
13. E15 LEBUHRAYA BUTTERWORTH-KULIM KLBK 16.8 km Terbuka 1<br />
14. E16 LEBUHRAYA DUTA-ULU KLANG DUKE 18 km Terbuka -<br />
15. E17 LEBUHRAYA LINGKARAN LUAR BUTTERWORTH BORR 12.1 km Terbuka 1<br />
49
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
BIL KOD NAMA LEBUHRAYA SINGKATAN PANJANG<br />
SISTEM<br />
TOL<br />
BILANGAN<br />
R&R<br />
16. E18<br />
LEBUHRAYA PENYURAIAN TRAFIK LINGKARAN<br />
KAJANG<br />
SILK 37.0 km Terbuka -<br />
17. E20 LEBUHRAYA KUALA LUMPUR-PUTRAJAYA MEX 26.0 km Terbuka 2<br />
18. E21 LEBUHRAYA KAJANG SEREMBAN LEKAS 44.3 km Tertutup<br />
Terbuka<br />
2<br />
19. E22 LEBUHRAYA SENAI DESARU SDE<br />
50.0 KM<br />
(72.6 KM)<br />
Tertutup<br />
2 (Belum<br />
dibuka)<br />
20. E23 LEBUHRAYA SISTEM PENYURAIAN TRAFIK KUALA<br />
LUMPUR BARAT<br />
SPRINT 26.0 km Terbuka -<br />
21. E26 LEBUHRAYA LEMBAH KLANG SELATAN SKVE 19.7 km<br />
(51 km)<br />
Terbuka<br />
Tertutup<br />
2 (Belum<br />
dibuka)<br />
22. E29 LEBUHRAYA SEREMBAN-PORT DICKSON SPDH 22.7 km Terbuka 2<br />
23. E30 LEBUHRAYA PINTAS SELAT KLANG UTARA NKSB 8.0 km<br />
Telah<br />
Ditutup<br />
-<br />
24. E30 LEBUHRAYA PINTAS SELAT KLANG UTARA BARU NNKSB 17.5 KM Terbuka 1<br />
25. E35 LEBUHRAYA SHAH ALAM-KUANG<br />
GUTHRIE<br />
KORIDOR<br />
25.0 KM Terbuka 2<br />
26. E36 JAMBATAN PULAU PINANG JPP 13.5 KM Terbuka -<br />
27. E37 LEBUHRAYA HUBUNGAN TIMUR BARAT METRAMAC 17.0 KM Terbuka -<br />
28. E38 TEROWONG JALAN RAYA DAN PENGURUSAN AIR<br />
BANJIR<br />
SMART 3.06 KM Terbuka -<br />
Sumber: Bahagian Pembangunan dan Penswastaan<br />
50
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
6.2 SENARAI KADAR TOL<br />
Kelas Kenderaan untuk semua lebuhraya kecuali Jambatan Pulau Pinang:<br />
KELAS JENIS KETERANGAN<br />
Kelas 0<br />
Motorsikal, basikal atau kenderaan 2 tayar atau kurang<br />
Kelas 1<br />
Kelas 2<br />
Kelas 3<br />
Kelas 4<br />
Kelas 5<br />
Kenderaan 2 gandar dan 3 atau 4 tayar tidak termasuk teksi<br />
Kenderaan 2 gandar dan 5 atau 6 tayar tidak termasuk bas<br />
Kenderaan 3 gandar atau lebih<br />
Teksi<br />
Bas<br />
1) LEBUHRAYA UTARA –SELATAN (E1/E2)<br />
i) Sistem Tertutup (Lebuhraya Utara Selatan)<br />
Kelas<br />
Kelas 0<br />
Kelas 1<br />
Kelas 2<br />
Kelas 3<br />
Kelas 4<br />
Kelas 5<br />
Bayaran Tol<br />
[sen/km]<br />
Tidak dikenakan tol<br />
13.60 sen setiap 1 kilometer<br />
20.39 sen setiap 1 kilometer<br />
27.19 sen setiap 1 kilometer<br />
6.80 sen setiap 1 kilometer<br />
10.20 sen setiap 1 kilometer<br />
51
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
ii) Sistem Terbuka (Lebuhraya Utara Selatan)<br />
Kelas<br />
Plaza Tol Bukit<br />
Kayu Hitam<br />
Plaza Tol Jitra Plaza Tol Kempas Plaza Tol<br />
Tambak Johor<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 3.60 RM 1.60 RM 2.10 RM 2.90<br />
Kelas 2 RM 5.30 RM 2.30 RM 3.20 RM 4.50<br />
Kelas 3 RM 7.20 RM 3.10 RM 4.10 RM 6.10<br />
Kelas 4 RM 1.70 RM 0.80 RM 1.10 RM 1.40<br />
Kelas 5 RM 2.60 RM 1.20 RM 1.40 RM 2.30<br />
1a) Sistem tol terbuka (Lebuhraya Persekutuan II)<br />
Kelas Plaza Tol Batu Tiga Plaza Tol Sungai Rasau<br />
Kelas 0 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.10 RM 1.00<br />
Kelas 2 RM 1.50 RM 1.30<br />
Kelas 3 RM 2.20 RM 2.00<br />
Kelas 4 RM 0.40 RM 0.40<br />
Kelas 5 RM 0.90 RM 0.80<br />
52
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
b) LEBUHRAYA LALUAN KEDUA MALAYSIA-SINGAPURA (E3 - LINKEDUA)<br />
Kelas<br />
Plaza Tol<br />
Kompleks<br />
Sultan Abu<br />
Bakar<br />
Tanjung Kupang<br />
Komponen<br />
Lebuhraya<br />
Komponen<br />
Jambatan<br />
Laluan<br />
Terus<br />
Plaza Tol<br />
Lima<br />
Kedai<br />
Plaza Tol<br />
Perling<br />
Kelas 0 RM3.20 RM 0.00 RM 1.10 RM 1.10 RM 0.00 RM 0.00<br />
Kelas 1 RM15.20 RM 2.20 RM 5.30 RM 7.50 RM 3.90 RM 2.30<br />
Kelas 2 RM39.00 RM 3.40 RM13.70 RM17.10 RM 7.80 RM 4.60<br />
Kelas 3 RM78.20 RM 6.90 RM27.40 RM34.30 RM 9.80 RM 5.70<br />
Kelas 4 RM13.00 RM 1.10 RM 4.60 RM 5.70 RM 2.00 RM 1.10<br />
Kelas 5 RM20.80 RM 1.80 RM 7.30 RM9.10 RM 3.90 RM 2.30<br />
c) LEBUHRAYA SHAH ALAM (E5 – KESAS)<br />
Kelas<br />
Plaza Tol Awan Besar<br />
Plaza Tol<br />
Sunway<br />
Plaza Tol<br />
Kemuning<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 2.20 RM 2.20 RM 2.20<br />
Kelas2 RM 3.30 RM 3.30 RM 3.30<br />
Kelas3 RM 4.40 RM 4.40 RM 4.40<br />
Kelas 4 RM 1.10 RM 1.10 RM 1.10<br />
Kelas 5 RM 1.70 RM 1.70 RM 1.70<br />
53
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
d) LEBUHRAYA UTARA SELATAN HUBUNGAN TENGAH (E6 – ELITE)<br />
Kelas<br />
Kelas 0<br />
Kelas 1<br />
Kelas2<br />
Kelas3<br />
Kelas 4<br />
Kelas 5<br />
Bayaran Tol<br />
[sen/km]<br />
Tidak dikenakan tol<br />
14.96 sen setiap 1 kilometer<br />
22.43 sen setiap 1 kilometer<br />
29.91 sen setiap 1 kilometer<br />
7.48 sen setiap 1 kilometer<br />
11.22 sen setiap 1 kilometer<br />
e) LEBUHRAYA CHERAS-KAJANG (E7 – GRAND SAGA)<br />
Kelas<br />
Plaza Tol<br />
Batu 9, Cheras<br />
Plaza Tol<br />
Batu 11, Cheras<br />
Kelas 0 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.00 RM 0.90<br />
Kelas2 RM 2.00 RM 1.80<br />
Kelas3 RM 2.00 RM 1.80<br />
Kelas 4 RM 0.50 RM 0.50<br />
Kelas 5 RM 1.00 RM 0.90<br />
54
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
f) LEBUHRAYA KUALA LUMPUR-KARAK (E8 – KLK)<br />
Kelas Plaza Tol Gombak Plaza Tol Betong<br />
Kelas 0 RM 0.00 RM 0.00<br />
Kelas 1 RM 5.00 RM 3.00<br />
Kelas2 RM 10.00 RM 6.00<br />
Kelas3 RM 15.00 RM 9.00<br />
Kelas 4 RM 2.50 RM 1.50<br />
Kelas 5 RM 5.00 RM 3.00<br />
g) LEBUHRAYA PANTAI TIMUR FASA 1 (E8 – LPT1)<br />
Kelas<br />
Kelas 0<br />
Kelas 1<br />
Kelas2<br />
Kelas3<br />
Kelas 4<br />
Kelas 5<br />
Bayaran Tol<br />
[sen/km]<br />
Tidak dikenakan tol<br />
12.00 sen setiap 1 kilometer<br />
24.00 sen setiap 1 kilometer<br />
36.00 sen setiap 1 kilometer<br />
6.00 sen setiap 1 kilometer<br />
12.00 sen setiap 1 kilometer<br />
55
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
h) LEBUHRAYA SUNGAI BESI (E9 – BESRAYA)<br />
Kelas<br />
Plaza Tol Mines<br />
Kelas 0 RM 0.00<br />
Kelas 1 RM 1.30<br />
Kelas2 RM 2.60<br />
Kelas3 RM 2.60<br />
Kelas 4 RM 1.30<br />
Kelas 5 RM 1.30<br />
Nota : Plaza Tol Salak Jaya telah ditutup pada 24 Februari 2009<br />
i) LEBUHRAYA BARU PANTAI (E10 – NPE)<br />
Kelas<br />
Plaza Tol Pantai<br />
Dalam<br />
Plaza Tol<br />
PJS 2<br />
Plaza Tol<br />
PJS 5<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.60 RM 1.00 RM 1.60<br />
Kelas2 RM 3.20 RM 3.20 RM 3.20<br />
Kelas3 RM 4.80 RM 4.80 RM 4.80<br />
Kelas 4 RM 0.80 RM 0.80 RM 0.80<br />
Kelas 5 RM 1.60 RM 1.60 RM 1.60<br />
Nota : Mulai 18 Februari 2011 Kadar tol kelas 1 di Plaza Tol PJS 2 telah dikurangkan daripada RM1.60 kepada RM1.00.<br />
Plaza Tol PJS 2 arah Kuala Lumpur telah ditutup pada 13 Februari 2009.<br />
56
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
j) LEBUHRAYA DAMANSARA-PUCHONG (E11 – LDP)<br />
Kelas<br />
Plaza Tol<br />
Penchala<br />
Plaza Tol PJ<br />
Selatan<br />
Plaza Tol<br />
Puchong Barat<br />
Plaza Tol<br />
Puchong<br />
Selatan<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.60 RM 1.60 RM 1.60 RM 1.60<br />
Kelas 2 RM 3.20 RM 3.20 RM 3.20 RM 3.20<br />
Kelas 3 RM 4.80 RM 4.80 RM 4.80 RM 4.80<br />
Kelas 4 RM 0.80 RM 0.80 RM 0.80 RM 0.80<br />
Kelas 5 RM 1.60 RM 1.60 RM 1.60 RM 1.60<br />
k) LEBUHRAYA BERTINGKAT KUALA LUMPUR-AMPANG (E12 - AKLEH)<br />
Kelas<br />
Plaza Tol Dato’ Keramat<br />
Kelas 0 RM 0.00<br />
Kelas 1 RM 1.50<br />
Kelas 2 RM 3.00<br />
Kelas 3 RM 4.50<br />
Kelas 4 RM 0.80<br />
Kelas 5 RM 1.50<br />
57
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
l) LEBUHRAYA KEMUNING - SHAH ALAM (E13 - LKSA)<br />
Kelas<br />
Plaza Tol Taman<br />
Seri Muda<br />
Plaza Tol Alam<br />
Impian<br />
Kelas 0 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.20 RM 0.60<br />
Kelas 2 RM 2.40 RM 1.20<br />
Kelas 3 RM 3.60 RM 1.80<br />
Kelas 4 RM 0.60 RM 0.60<br />
Kelas 5 RM 1.20 RM 0.60<br />
Nota : Lebuh raya ini akan dibuka secara rasminya pada 18 Mei 2010 dan Kutipan tol pula dijadualkan akan bermula sebulan dari tarikh<br />
pembukaan LKSA iaitu pada 17 Jun 2010<br />
m) LEBUHRAYA BUTTERWORTH-KULIM (E15 – KLBK)<br />
Kelas<br />
Plaza Tol Kubang<br />
Semang<br />
Plaza Tol Lunas<br />
Kelas 0 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.60 RM 1.60<br />
Kelas 2 RM 3.20 RM 3.20<br />
Kelas 3 RM 4.80 RM 4.80<br />
Kelas 4 RM 0.80 RM 0.80<br />
Kelas 5 RM 1.60 RM 1.60<br />
58
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
n) LEBUHRAYA DUTA-ULU KLANG (E16 – DUKE)<br />
Kelas<br />
Plaza Tol Ayer<br />
Panas<br />
Plaza Tol Sentul<br />
Plaza Tol Batu<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 2.00 RM 2.00 RM 2.00<br />
Kelas2 RM 3.00 RM 3.00 RM 3.00<br />
Kelas3 RM 4.00 RM 4.00 RM 4.00<br />
Kelas 4 RM 1.00 RM 1.00 RM 1.00<br />
Kelas 5 RM 1.30 RM 1.30 RM 1.30<br />
o) LEBUHRAYA LINGKARAN LUAR BUTTERWORTH (E17 – BORR)<br />
Kelas<br />
Plaza Tol<br />
Jalan Prai<br />
Plaza Tol<br />
Bagan Ajam<br />
Plaza Tol<br />
Sungai Nyior<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.30 RM 1.20 RM 0.50<br />
Kelas 2 RM 2.60 RM 2.40 RM 1.00<br />
Kelas 3 RM 3.90 RM 3.60 RM 2.00<br />
Kelas 4 RM 0.70 RM 0.60 RM 0.50<br />
Kelas 5 RM 1.30 RM 1.20 RM 0.50<br />
59
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
p) LEBUHRAYA PENYURAIAN TRAFIK LINGKARAN KAJANG (E18 – SILK)<br />
Kelas<br />
Plaza Tol<br />
Sungai Ramal<br />
Plaza Tol<br />
Sungai Balak<br />
Plaza Tol<br />
Bukit Kajang<br />
Plaza Tol<br />
Sungai Long<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.00 RM 1.00 RM 1.00 RM 1.00<br />
Kelas 2 RM 2.00 RM 2.00 RM 2.00 RM 2.00<br />
Kelas 3 RM 3.00 RM 3.00 RM 3.00 RM 3.00<br />
Kelas 4 RM 0.50 RM 0.50 RM 0.50 RM 0.50<br />
Kelas 5 RM 1.00 RM 1.00 RM 1.00 RM 1.00<br />
q) LEBUHRAYA KUALA LUMPUR-PUTRAJAYA (E20 – MEX)<br />
Kelas Plaza Tol Putrajaya Plaza Tol Salak Selatan<br />
Kelas 0 RM 0.00 RM 0.00<br />
Kelas 1 RM 2.50 RM 1.50<br />
Kelas2 RM 5.00 RM 3.00<br />
Kelas3 RM 7.50 RM 4.50<br />
Kelas 4 RM 1.30 RM 0.80<br />
Kelas 5 RM 2.50 RM 1.50<br />
60
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
r) LEBUHRAYA KAJANG SEREMBAN (E21 – LEKAS)<br />
a) Sistem Tertutup<br />
Kelas<br />
Bayaran Tol<br />
[sen/km]<br />
Kelas 0<br />
Kelas 1<br />
Kelas 2<br />
Kelas 3<br />
Kelas 4<br />
Kelas 5<br />
Tidak dikenakan tol<br />
14.96 sen setiap 1 kilometer<br />
22.43 sen setiap 1 kilometer<br />
29.91 sen setiap 1 kilometer<br />
7.48 sen setiap 1 kilometer<br />
11.22 sen setiap 1 kilometer<br />
b) Sistem Terbuka (Plaza Tol Ampangan)<br />
Kelas<br />
Bayaran Tol<br />
[RM]<br />
Kelas 0<br />
Tidak dikenakan tol<br />
Kelas 1 RM 1.90<br />
Kelas 2 RM 2.90<br />
Kelas 3 RM 3.90<br />
Kelas 4 RM 1.00<br />
Kelas 5 RM 1.50<br />
Nota : Telah dibuka sepenuhnya sepanjang 44.3 km dan Plaza Tol Ampangan akan memulakan kutipan tol dijangka pada<br />
20 September 2010<br />
61
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
s) LEBUHRAYA SENAI – DESARU (E22 – SDE) (Sistem Tertutup)<br />
Kelas<br />
Kelas 0<br />
Kelas 1<br />
Kelas 2<br />
Kelas 3<br />
Kelas 4<br />
Kelas 5<br />
Bayaran Tol<br />
[sen/km]<br />
Tidak dikenakan tol<br />
14.96 sen setiap 1 kilometer<br />
22.43 sen setiap 1 kilometer<br />
29.91 sen setiap 1 kilometer<br />
7.48 sen setiap 1 kilometer<br />
11.22 sen setiap 1 kilometer<br />
*Nota : Bagi kenderaan kelas 5, pengurangan sebanyak 50% telah diberikan sehingga 14 September 2010. Kadar tol sepertimana<br />
Perjanjian Konsesi adalah 11.22 sen/km<br />
t) LEBUHRAYA PENYURAIAN TRAFIK KL BARAT (E23 – SPRINT)<br />
Kelas<br />
Plaza Tol Kerinchi<br />
Plaza Tol<br />
Damansara<br />
Plaza Tol<br />
Penchala<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.50 RM 1.00 RM 2.00<br />
Kelas2 RM 3.00 RM 2.00 RM 4.00<br />
Kelas3 RM 4.50 RM 3.00 RM 6.00<br />
Kelas 4 RM 0.80 RM 0.50 RM 1.00<br />
Kelas 5 RM 1.50 RM1.00 RM 2.00<br />
62
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
u) LEBUHRAYA LEMBAH KLANG SELATAN (E26 – SKVE)<br />
Kelas<br />
Kelas 0<br />
Kelas 1<br />
Kelas2<br />
Kelas3<br />
Kelas 4<br />
Kelas 5<br />
Bayaran Tol<br />
[sen/km]<br />
Tidak dikenakan tol<br />
0.1496 sen setiap 1 kilometer<br />
0.2244 sen setiap 1 kilometer<br />
0.2992 sen setiap 1 kilometer<br />
0.748 sen setiap 1 kilometer<br />
0.1122 sen setiap 1 kilometer<br />
*Nota : Lebuhraya ini telah dibuka pada 29 Jun 2010 dan kutipan tol bermula pada 28hb Julai 2010.<br />
v) LEBUHRAYA SEREMBAN-PORT DICKSON (E29 – SPDH)<br />
Kelas Plaza Tol Mambau Plaza Tol Lukut<br />
Kelas 0 RM 0.00 RM 0.00<br />
Kelas 1 RM 2.90 RM 0.70<br />
Kelas2 RM 6.30 RM 1.40<br />
Kelas3 RM 9.50 RM 2.20<br />
Kelas 4 RM 3.20 RM 0.80<br />
Kelas 5 RM 6.30 RM 1.40<br />
63
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
w) LEBUHRAYA PINTAS SELAT KLANG UTARA (E30 – NKSB)<br />
Kelas<br />
Plaza Tol<br />
Telok Kapas<br />
Kelas 0 RM 0.00<br />
Kelas 1 RM 0.50<br />
Kelas 2 RM 1.00<br />
*Nota : Lebuhraya ini telah tamat Perjanjian pada 29hb Disember 2009 dan Plaza Tol telah ditutup pada 21hb Disember 09.<br />
x) LEBUHRAYA PINTAS SELAT KLANG UTARA BARU (E30 – NNKSB)<br />
PLAZA TOL / KADAR TOL (RM)<br />
KAPAR LALUAN TIMUR<br />
KAPAR LALUAN BARAT<br />
BUKIT RAJA KAPAR<br />
KAPAR –<br />
BKT RAJA<br />
PEL.KLANG-<br />
KAPAR<br />
KAPAR -BKT<br />
RAJA<br />
PEL.KLANG-<br />
KAPAR<br />
1 0.60 2.70 1.40 1.60 1.40 1.60<br />
2 1.10 4.80 2.50 2.80 2.50 2.80<br />
3 1.60 6.80 3.50 4.00 3.50 4.00<br />
4 0.30 1.40 0.70 0.80 0.70 0.80<br />
5 0.60 2.40 1.30 1.40 1.30 1.40<br />
64
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
y) LEBUHRAYA SHAH ALAM-KUANG (E35 – GUTHRIE)<br />
Kelas<br />
Plaza Tol<br />
Bukit Jelutong<br />
Plaza Tol Lagong<br />
Plaza Tol Elmina<br />
Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />
Kelas 1 RM 1.40 RM 1.40 RM 1.40<br />
Kelas 2 RM 2.80 RM 2.80 RM 2.80<br />
Kelas 3 RM 4.20 RM 4.20 RM 4.20<br />
Kelas 4 RM 0.70 RM 0.70 RM 0.70<br />
Kelas 5 RM 0.70 RM 0.70 RM 0.70<br />
65
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
z) JAMBATAN PULAU PINANG (E36 – JPP)<br />
Kelas Kenderaan yang menggunakan Jambatan Pulau Pinang:<br />
KELAS JENIS KETERANGAN<br />
kelas 1<br />
Motosikal<br />
kelas 2<br />
Motosikal dengan ruang tepi, kenderaan komersil 3 tayar serta<br />
kereta<br />
kelas 3 Lori dan van 2 gandar dengan 4 tayar /bas 2 gandar dengan 4<br />
tayar<br />
kelas 4<br />
kelas 5<br />
Lori dan van 2 gandar dengan 5 atau 6 tayar / bas 2 gandar<br />
dengan 5 atau 6 tayar<br />
Kenderaan 3 gandar / bas 3 gandar<br />
kelas 6<br />
kelas 7<br />
Kenderaan 4 gandar<br />
Kenderaan 5 gandar atau lebih<br />
Kelas<br />
Plaza Tol Pulau Pinang<br />
Kelas 1 RM 1.40<br />
Kelas 2 RM 7.00<br />
Kelas 3 RM 12.00 / RM 6.00<br />
Kelas 4 RM 25.00 / RM 12.50<br />
Kelas 5 RM 45.00 / RM 22.50<br />
Kelas 6 RM 60.00<br />
Kelas 7 RM 75.00<br />
66
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
aa) LEBUHRAYA METRAMAC (E37 – METRAMAC)<br />
Kelas<br />
Plaza Tol<br />
Lebuhraya Hubungan Timur Barat<br />
Kelas 0 RM 0.00<br />
Kelas 1 RM 0.50<br />
Kelas 2 dan 3 RM 1.00<br />
Kelas 4 RM 0.30<br />
Kelas 5 RM 0.30<br />
bb) LEBUHRAYA TEROWONG SMART (E38 – SMART)<br />
Kelas Plaza Tol Utara Plaza Tol Selatan<br />
Kelas 1 RM 2.00 RM 2.00<br />
Kelas 4 RM 2.00 RM 2.00<br />
Sumber: Bahagian Pembangunan dan Penswastaan<br />
67
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
B A B 7 : <strong>MAKLUMAT</strong> ADUAN AWAM<br />
7.1 STATISTIK ADUAN AWAM KKR DAN AGENSI JANUARI - FEBRUARI 2011<br />
BULAN<br />
TAHUN 2011<br />
JUMLAH ADUAN SELESAI PERATUS<br />
DALAM SIASATAN/<br />
TINDAKAN<br />
Januari 352 352 100% 0<br />
Februari 483 483 100% 0<br />
Mac<br />
April<br />
Mei<br />
Jun<br />
CATATAN<br />
JUMLAH (JAN-JUN) 835 835 100.0% 0<br />
Julai<br />
Ogos<br />
September<br />
Oktober<br />
November<br />
Disember<br />
JUMLAH (JUL-DIS)<br />
JUMLAH 352 352 100% 0<br />
Sumber: Unit Komunikasi Korporat<br />
68
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
7.2 STATISTIK MAKLUM BALAS AWAL ADUAN KKR DAN AGENSI JANUARI - FEBRUARI 2011<br />
MAKLUMBALAS AWAL KEPADA PENGADU<br />
(BILANGAN HARI)<br />
BULAN<br />
ADUAN DITERIMA<br />
3 hari -
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
7.3 STATISTIK PENYELESAIAN ADUAN KKR DAN AGENSI BAGI BULAN JANUARI - FEBRUARI 2011<br />
Jumlah<br />
Aduan<br />
Selesai<br />
ADUAN SELESAI MENGIKUT BILANGAN HARI<br />
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
7.4 STATISTIK KESELURUHAN ADUAN KKR DAN AGENSI BULAN JANUARI - FEBRUARI 2011<br />
BIL AGENSI/JABATAN BILANGAN ADUAN ADUAN SELESAI<br />
BAKI ADUAN BELUM<br />
SELESAI<br />
PERATUS<br />
SELESAI<br />
1 <strong>Kementerian</strong> <strong>Kerja</strong> <strong>Raya</strong> (KKR) 239 239 0 100%<br />
2 Jabatan <strong>Kerja</strong> <strong>Raya</strong> (JKR) 563 563 0 100%<br />
3 Lembaga Lebuhraya <strong>Malaysia</strong> (LLM) 33 33 0 100%<br />
4<br />
Lembaga Pembangunan Industri<br />
Pembinaan (CIDB)<br />
0 0 0 100%<br />
5 Lembaga Juruukur Bahan <strong>Malaysia</strong> (LJBM) 0 0 0 100%<br />
6 Lembaga Jurutera <strong>Malaysia</strong> (LJM) 0 0 0 100%<br />
7 Lembaga Arkitek <strong>Malaysia</strong> (LAM) 0 0 0 100%<br />
JUMLAH 835 835 0 100%<br />
Sumber: Unit Komunikasi Korporat<br />
71
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
7.5 STATISTIK ADUAN AWAM MENGIKUT LAIN-LAIN SALURAN BAGI BULAN JANUARI - FEBRUARI 2011<br />
BIL SALURAN KKR JKR LLM CIDB LJBM LJM LAM JUMLAH PERATUS<br />
1 Laman Web iSPAAA 48 280 15 0 0 0 0 343 41.08%<br />
2 Emel 87 4 0 0 0 0 0 91 10.90%<br />
3 SMS 0 61 6 0 0 0 0 67 8.02%<br />
4 Hari Bertemu Pelanggan 0 1 0 0 0 0 0 1 0.12%<br />
5 Borang 0 0 0 0 0 0 0 0 0.00%<br />
6 Surat/Faks 0 93 0 0 0 0 0 93 11.14%<br />
7 Telefon /Talian Bebas Tol 99 87 6 0 0 0 0 192 22.99%<br />
8<br />
Warkah Untuk PM/e-<br />
Maklumbalas/Laman Web PM<br />
2 2 5 0 0 0 0 9 1.08%<br />
9 Media Cetak 3 35 1 0 0 0 0 39 4.67%<br />
10 Biro Pengaduan Awam 0 0 0 0 0 0 0 0 0.00%<br />
11 PEMUDAH 0 0 0 0 0 0 0 0 0.00%<br />
12 Lain-Lain (HBP) 48 280 15 0 0 0 0 343 41.08%<br />
JUMLAH<br />
239 563 33 0 0 0 0 835 100.00%<br />
SELESAI 835 100.00<br />
BELUM SELESAI 0 0<br />
Sumber: Unit Komunikasi Korporat<br />
72
M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />
7.6 STATISTIK ADUAN AWAM MENGIKUT KATEGORI BAGI BULAN JANUARI - FEBRUARI 2011<br />
BIL KATEGORI JAN FEB MAC APR MEI JUN JUL OGOS SEPT OKT NOV DIS JUMLAH PERATUS<br />
1 Jalan (Jalan Rosak/Berlubang/Tidak<br />
Rata/Tidak Siap)<br />
2 Perabot Jalan (pembahagi jalan,<br />
bonggol,papan tanda dan lain-lain)<br />
3 Lampu (Lampu Jalan/Lampu<br />
Isyarat/Lampu Trafik Rosak/Perlu<br />
Kajian Sistem)<br />
90 165 255 30.54%<br />
10 16 26 3.11%<br />
48 70 118 0.14%<br />
4 Jambatan & Bangunan 5 15 20 2.40%<br />
5 Kemudahan Awam (kawasan Rehat &<br />
Rawat/ flyover/penghadang bunyi/dll)<br />
& Naik Taraf<br />
6 Halangan Di Lebuh <strong>Raya</strong> (Kesesakan<br />
lalulintas/banjir/pokok-pokok besar<br />
menghalang dll)<br />
7 Bayaran Tol (perkhidmatan tn’g/smart<br />
tag/bayaran atau baki tol dll)<br />
8 Kesan Pembinaan (Mengakibatkan<br />
banjir/longkang tersumbat/kerosakan<br />
atau keretakan rumah)<br />
3 0 3 0.36%<br />
2 5 7 0.84%<br />
0 5 5 0.60%<br />
1 1 2 0.24%<br />
9 Polisi Kerajaan 0 0 0 0.00%<br />
10 Pendaftaran Lesen Kontraktor 90 75 165 19.76%<br />
11 Luar Bidang Kuasa/Tidak Berkaitan 64 77 141 16.89%<br />
12 Lain-lain 39 54 93 11.14%<br />
JUMLAH 352 483 835 100.00%<br />
Sumber: Unit Komunikasi Korporat<br />
73