29.10.2014 Views

MAKLUMAT PROJEK RMKe-9 - Kementerian Kerja Raya Malaysia

MAKLUMAT PROJEK RMKe-9 - Kementerian Kerja Raya Malaysia

MAKLUMAT PROJEK RMKe-9 - Kementerian Kerja Raya Malaysia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

B A B 1 : <strong>MAKLUMAT</strong> <strong>PROJEK</strong> <strong>RMKe</strong>-9<br />

1.1 PRESTASI PERBELANJAAN PERUNTUKAN PEMBANGUNAN <strong>RMKe</strong>-9 MENGIKUT TAHUN (31 OGOS 2010)<br />

- Maklumat ini hanya boleh dicapai dalam Portal Intranet KKR –<br />

1


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

- Maklumat ini hanya boleh dicapai dalam Portal Intranet KKR –<br />

Sumber : Unit Penyelarasan Pelaksanaan (ICU), Jabatan Perdana Menteri<br />

2


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

1.2 PRESTASI PERBELANJAAN PEMBANGUNAN <strong>RMKe</strong>-9 TAHUN 2010 (31 OGOS 2010)<br />

- Maklumat ini hanya boleh dicapai dalam Portal Intranet KKR –<br />

3


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

- Maklumat ini hanya boleh dicapai dalam Portal Intranet KKR –<br />

Sumber : Unit Penyelarasan Pelaksanaan (ICU), Jabatan Perdana Menteri<br />

4


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

1.3 PRESTASI PELAKSANAAN <strong>PROJEK</strong> KKR BERDASARKAN BUTIRAN (SEHINGGA 31 OGOS 2010)<br />

Bil<br />

Bahagian/<br />

Cawangan<br />

Bil.<br />

Projek<br />

Dalam<br />

Perancangan<br />

Ikut<br />

Jadual<br />

Lewat<br />

Jadual<br />

Dahulu<br />

Jadual<br />

Siap<br />

Sepenuhnya<br />

1<br />

Bahagian Pembangunan dan<br />

Penswastaan (KKR)<br />

66 1 12 2 6 44<br />

2 Bahagian Perancang Jalan (KKR) 37 0 23 0 0 14<br />

3 Cawangan Arkitek (KKR) 1 0 0 0 0 1<br />

4 Cawangan Jalan (JKR) 27 0 18 0 3 6<br />

5<br />

Cawangan Kejuruteraan Awam, Struktur<br />

& Jambatan (CKASJ) (JKR)<br />

1 0 1 0 0 0<br />

6 Cawangan Kejuruteraan Cerun (JKR) 10 0 7 0 0 3<br />

7 Cawangan Kejuruteraan Mekanikal (JKR) 4 0 3 0 0 1<br />

8 Cawangan <strong>Kerja</strong> Bangunan Am (JKR) 1 0 0 0 0 1<br />

9 Jabatan <strong>Kerja</strong> <strong>Raya</strong> (JKR) 0 0 0 0 0 0<br />

10 JKR Negeri Johor 23 0 6 1 1 14<br />

11 JKR Negeri Kedah 26 0 10 0 7 9<br />

12 JKR Negeri Kelantan 18 0 3 0 4 10<br />

5


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

Bil<br />

Bahagian/<br />

Cawangan<br />

Dalam<br />

Perancangan<br />

Ikut<br />

Jadual<br />

Lewat<br />

Jadual<br />

Dahulu<br />

Jadual<br />

Siap<br />

Sepenuhnya<br />

13 JKR Negeri Melaka 7 0 0 1 2 4<br />

14 JKR Negeri Pahang 42 3 16 1 1 21<br />

15 JKR Negeri Perak 18 0 5 0 0 13<br />

16 JKR Negeri Perlis 13 0 3 0 1 9<br />

17 JKR Negeri Pulau Pinang 18 0 6 1 1 10<br />

18 JKR Negeri Sabah 65 1 15 4 3 41<br />

19 JKR Negeri Sarawak 91 5 26 8 1 51<br />

20 JKR Negeri Selangor 24 2 5 0 3 14<br />

21 JKR Negeri Sembilan 16 1 6 2 2 5<br />

22 JKR Negeri Terengganu 23 2 7 0 3 11<br />

23<br />

JKR Wilayah Persekutuan (Kuala<br />

Lumpur)<br />

17 0 6 0 2 9<br />

24 JKR Wilayah Persekutuan (Labuan) 6 0 3 0 0 3<br />

25 <strong>Kementerian</strong> <strong>Kerja</strong> <strong>Raya</strong> (KKR) 10 2 4 0 1 3<br />

26 Lembaga Lebuhraya <strong>Malaysia</strong> 28 3 8 0 3 14<br />

27 Pusat Khidmat Kontraktor 1 0 1 0 0 0<br />

<strong>Kementerian</strong> <strong>Kerja</strong> <strong>Raya</strong> 593 23 194 20 44 311<br />

Sumber : Sistem Pemantauan Projek II<br />

6


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

1.4 PRESTASI PELAKSANAAN <strong>PROJEK</strong> RMKE-9 YANG DILAKSANAKAN OLEH IBU PEJABAT JKR (MENGIKUT<br />

KONTRAK) SEHINGGA 31 DISEMBER 2010<br />

BIL<br />

KEMENTERIAN PELANGGAN<br />

JUMLAH<br />

<strong>PROJEK</strong><br />

<strong>RMKe</strong>-9<br />

<strong>PROJEK</strong> SAMBUNGAN<br />

<strong>RMKe</strong>-9<br />

PEMBINAAN<br />

SERAHAN /<br />

SIAP<br />

JUMLAH<br />

<strong>PROJEK</strong><br />

DALAM<br />

PEMBINAAN<br />

YANG SAKIT<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

JABATAN PERDANA MENTERI<br />

(JPM)<br />

KEMENTERIAN KEWANGAN<br />

(MOF)<br />

KEMENTERIAN LUAR NEGERI<br />

(KLN)<br />

KEMENTERIAN PELAJARAN<br />

(KPM)<br />

KEMENTERIAN PEMBANGUNAN<br />

WANITA, KELUARGA DAN<br />

MASYARAKAT (KPWKM)<br />

KEMENTERIAN PENGAJIAN<br />

TINGGI (KPT)<br />

KEMENTERIAN KESIHATAN<br />

(KKM)<br />

KEMENTERIAN PERDAGANGAN<br />

ANTARABANGSA & INDUSTRI<br />

(MITI)<br />

56 56 0 13<br />

26 26 0 5<br />

3 3 0 3<br />

552 487 65 27<br />

5 5 0 1<br />

73 68 5 6<br />

90 84 6 13<br />

0 0 0 0<br />

7


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BIL<br />

KEMENTERIAN PELANGGAN<br />

JUMLAH<br />

<strong>PROJEK</strong><br />

<strong>RMKe</strong>-9<br />

<strong>PROJEK</strong> SAMBUNGAN<br />

<strong>RMKe</strong>-9<br />

PEMBINAAN<br />

SERAHAN /<br />

SIAP<br />

JUMLAH<br />

<strong>PROJEK</strong><br />

DALAM<br />

PEMBINAAN<br />

YANG SAKIT<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

KEMENTERIAN PENGANGKUTAN<br />

(MOT)<br />

KEMENTERIAN PERDAGANGAN<br />

DALAM NEGERI, KOPERASI &<br />

KEPENGGUNAAN (KPDNKK)<br />

KEMENTERIAN PERTAHANAN<br />

(MINDEF)<br />

KEMENTERIAN TENAGA,<br />

TEKNOLOGI HIJAU & AIR<br />

(KTTHA)<br />

KEMENTERIAN PERUMAHAN &<br />

KERAJAAN TEMPATAN (KPKT)<br />

KEMENTERIAN SUMBER ASLI<br />

DAN ALAM SEKITAR (NRE)<br />

KEMENTERIAN KERJA RAYA<br />

(KKR)<br />

KEMENTERIAN PENERANGAN,<br />

KOMUNIKASI DAN KEBUDAYAAN<br />

(KPKK)<br />

KEMENTERIAN SAINS,<br />

TEKNOLOGI & INOVASI (MOSTI)<br />

1 1 0 1<br />

0 0 0 0<br />

10 9 1 0<br />

2 2 0 0<br />

4 4 0 0<br />

6 6 0 3<br />

89 82 7 10<br />

5 5 0 1<br />

4 4 0 0<br />

8


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BIL<br />

KEMENTERIAN PELANGGAN<br />

JUMLAH<br />

<strong>PROJEK</strong><br />

<strong>RMKe</strong>-9<br />

<strong>PROJEK</strong> SAMBUNGAN<br />

<strong>RMKe</strong>-9<br />

PEMBINAAN<br />

SERAHAN /<br />

SIAP<br />

JUMLAH<br />

<strong>PROJEK</strong><br />

DALAM<br />

PEMBINAAN<br />

YANG SAKIT<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

KEMENTERIAN DALAM NEGERI<br />

(KDN)<br />

KEMENTERIAN PERUSAHAAN<br />

PERLADANGAN DAN KOMODITI<br />

(KPPK)<br />

KEMENTERIAN BELIA & SUKAN<br />

(KBS)<br />

KEMENTERIAN WILAYAH<br />

PERSEKUTUAN &<br />

KESEJAHTERAAN BANDAR<br />

(KWPKB)<br />

KEMENTERIAN PELANCONGAN<br />

(MOTOUR)<br />

KEMENTERIAN PERTANIAN DAN<br />

INDUSTRI ASAS TANI (MOA)<br />

KEMENTERIAN KEMAJUAN LUAR<br />

BANDAR DAN WILAYAH (KKLBW)<br />

KEMENTERIAN SUMBER<br />

MANUSIA (KSM)<br />

67 63 4 7<br />

4 4 0 0<br />

7 7 0 0<br />

1 1 0 0<br />

4 4 0 1<br />

5 5 0 3<br />

63 63 0 2<br />

3 3 0 0<br />

JUMLAH 1,080 992 88 96<br />

Sumber : Jabatan <strong>Kerja</strong> <strong>Raya</strong> (JKR)<br />

9


RUJUKAN<br />

BELANJA/PERUNTUKAN<br />

(%)<br />

M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

1.5 SENARAI <strong>PROJEK</strong> DI BAWAH PAKEJ RANGSANGAN EKONOMI KKR (SEHINGGA 31 OGOS 2010)<br />

AGIHAN ALIRAN TUNAI TAHUNAN<br />

(RM) JUTA<br />

PROGRAM/<strong>PROJEK</strong><br />

PERUNTUKAN<br />

LULUS<br />

(RM)<br />

PERUNTUKAN<br />

SEMASA<br />

(RM)<br />

2009 2010<br />

BIL<br />

<strong>PROJEK</strong><br />

BIL<br />

<strong>PROJEK</strong><br />

SIAP<br />

JUMLAH<br />

BELANJA<br />

(RM)<br />

B<br />

PAKEJ<br />

RANGSANGAN<br />

EKONOMI - FASA<br />

2<br />

853,700,000.00 853,700,000.00 321,149,400.00 532,550,600.00 26 8 332,067,839 38.90%<br />

B1 Sabah 170,000,000.00 170,000,000.00 90,227,800.00 79,772,200.00 3 0 79,760,174 46.92%<br />

B2 Sarawak 344,700,000.00 344,700,000.00 75,615,500.00 269,084,500.00 10 4 53,022,377 15.38%<br />

B3 Pahang(Jerantut) 36,000,000.00 36,000,000.00 31,900,000.00 4,100,000.00 6 3 26,373,237.94 73.30%<br />

B4 Lain-Lain 303,000,000.00 303,000,000.00 125,406,100.00 177,593,900.00 7 1 174,720,051 57.66%<br />

Sumber : Bahagian Pembangunan dan Penswastaan<br />

10


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BAB 2: <strong>MAKLUMAT</strong> KONTRAKTOR<br />

2.1 STATISTIK KONTRAKTOR YANG BERDAFTAR DENGAN PUSAT KHIDMAT KONTRAKTOR (PKK) MENGIKUT<br />

NEGERI DAN KELAS (SEHINGGA 10 MAC 2011)<br />

Kategori<br />

Bilangan Kontraktor<br />

Bumiputra<br />

Bukan Bumiputera<br />

Jumlah<br />

Awam 38,604 2,524 41,128<br />

Elektrik 2,743 811 3,554<br />

Jumlah 41,347 3,335 44,682<br />

2.1.1 Kontraktor <strong>Kerja</strong> Awam<br />

Terdapat enam (6) Kelas pendaftaran bagi Kontraktor <strong>Kerja</strong> Awam dengan PKK yang dikategorikan mengikut had<br />

kewangan, modal berbayar, had kawasan operasi dan kelulusan pegawai teknikal syarikat. Kontraktor yang berdaftar<br />

hanya dibenarkan menyertai tender kerajaan yang dipelawa bagi kelas pendaftaran yang ianya didaftarkan sahaja.<br />

Had kewangan (iaitu kos kerja) dan modal berbayar bagi satu-satu kelas pendaftaran adalah seperti berikut :-<br />

KELAS HAD KEWANGAN (RM) MODAL BERBAYAR (RM)<br />

A > 10 juta 600,001<br />

B 5,000,001 – 10,000,000 400,001<br />

C 2,000,001 – 5,000,000 100,001<br />

D 500,001 – 2,000,000 35,001<br />

E 200,001 – 500,000 17,501<br />

F Sehingga 200,000 10,000<br />

Kepala dan sub-kepala yang wujud dalam pendaftaran Kontraktor <strong>Kerja</strong> Awam ialah :-<br />

Sumber : Pusat Khidmat Kontraktor<br />

11


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

Kepala I - <strong>Kerja</strong> kejuruteraan awam<br />

Kepala II - <strong>Kerja</strong> bangunan<br />

Kepala III - <strong>Kerja</strong> kejuruteraan mekanikal, kejuruteraan pembersihan dan kejuruteraan air<br />

Kepala IV - Lain-lain kerja pakar kejuruteraan awam<br />

Kepala V - <strong>Kerja</strong> kuari, membekal logam dan tanah, kerja angkut dan pengangkutan<br />

Kepala VI - <strong>Kerja</strong>-kerja perhutanan dan pembangunan tanah<br />

Kepala VIII - <strong>Kerja</strong> telekomunikasi<br />

2.1.2 Kontraktor <strong>Kerja</strong> Elektrik<br />

Terdapat empat (4) Kelas pendaftaran bagi Kontraktor <strong>Kerja</strong> Elektrik dengan PKK yang dikategorikan mengikut had<br />

kewangan, modal berbayar, had kawasan operasi dan kelulusan pegawai teknikal syarikat. Kontraktor yang berdaftar<br />

hanya dibenarkan menyertai tender kerajaan yang dipelawa bagi kelas pendaftaran yang ianya didaftarkan sahaja.<br />

Had kewangan (iaitu kos kerja) dan modal berbayar bagi satu-satu kelas pendaftaran adalah seperti berikut :-<br />

KELAS HAD KEWANGAN (RM) MODAL BERBAYAR (RM)<br />

I > 200,000 ribu 100,000<br />

II Sehingga 1,000,000 50,000<br />

III Sehingga 500,000 25,000<br />

IV Sehingga 200,000 7,501<br />

Kepala dan sub-kepala yang wujud dalam pendaftaran Kontraktor <strong>Kerja</strong> Elektrik ialah :-<br />

Kepala VII - <strong>Kerja</strong>-kerja kejuruteraan elektrik<br />

Sumber : Pusat Khidmat Kontraktor<br />

12


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

i) KONTRAKTOR KERJA AWAM<br />

Kelas A Kelas B Kelas C Kelas D Kelas E Kelas F<br />

Bil Negeri B BB B BB B BB B BB B BB B<br />

Jumlah<br />

Keseluruhan<br />

1 IBU PEJABAT PKK 1432 457 774 285 1607 337 0 0 0 0 0 4892<br />

2 JOHOR 0 0 0 0 0 0 350 45 257 33 2,588 3,273<br />

3 KEDAH 0 0 0 0 0 0 149 20 94 4 2,265 2,532<br />

4 KELANTAN 0 0 0 0 0 0 237 5 130 2 2,298 2,672<br />

5 MELAKA 0 0 0 0 0 0 159 25 104 19 1,129 1,436<br />

6 NEGERI SEMBILAN 0 0 0 0 0 0 256 35 171 18 2,103 2,583<br />

7 PAHANG 0 0 0 0 0 0 269 35 167 36 2,173 2,680<br />

8 PERAK 0 0 0 0 0 0 246 63 164 47 2,607 3,127<br />

9 PERLIS 0 0 0 0 0 0 55 10 7 5 1,033 1,110<br />

10 PULAU PINANG 0 0 0 0 0 0 147 64 77 22 1,282 1,592<br />

11 SABAH 116 62 50 37 40 31 266 112 177 71 2,480 3,442<br />

12 SARAWAK 114 43 37 37 37 21 73 51 171 87 920 1,591<br />

13 SELANGOR 0 0 0 0 0 0 669 171 271 70 4,143 5,324<br />

14 TERENGGANU 0 0 0 0 0 0 335 10 151 2 2,335 2,833<br />

15 W. PERSEKUTUAN 0 0 0 0 0 0 337 92 87 60 1,465 2,041<br />

Jumlah Keseluruhan 1,662 562 861 359 1,684 389 3,548 738 2,028 476 28,821 41,128<br />

Sumber : Pusat Khidmat Kontraktor (PKK)<br />

13


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

ii) KONTRAKTOR KERJA ELEKTRIK<br />

Kelas I Kelas II Kelas III Kelas IV Jumlah Jumlah<br />

Keseluruhan<br />

Bil Negeri B BB B BB B BB B BB B BB<br />

1<br />

IBU PEJABAT<br />

PKK<br />

271 146 498 152 1,214 282 0 0 1,983 580 2,563<br />

2 JOHOR 0 0 0 0 0 0 66 10 66 10 76<br />

3 KEDAH 0 0 0 0 0 0 56 3 56 3 59<br />

4 KELANTAN 0 0 0 0 0 0 55 5 55 5 60<br />

5 MELAKA 0 0 0 0 0 0 50 2 50 2 52<br />

6<br />

NEGERI<br />

SEMBILAN<br />

0 0 0 0 0 0 71 5 71 5 76<br />

7 PAHANG 0 0 0 0 0 0 49 6 49 6 55<br />

8 PERAK 0 0 0 0 0 0 80 11 80 11 91<br />

9 PERLIS 0 0 0 0 0 0 12 2 12 2 14<br />

10 PULAU PINANG 0 0 0 0 0 0 31 12 31 12 43<br />

11 SABAH 22 5 7 5 11 14 71 30 111 54 165<br />

12 SARAWAK 11 7 2 10 3 4 12 61 28 82 110<br />

13 SELANGOR 0 0 0 0 0 0 66 23 66 23 89<br />

14 TERENGGANU 0 0 0 0 0 0 56 0 56 0 56<br />

15<br />

W.<br />

PERSEKUTUAN<br />

0 0 0 0 0 0 29 16 29 16 45<br />

Jumlah Keseluruhan 304 158 507 167 1,228 300 704 186 2,743 811 3,554<br />

Sumber : Pusat Khidmat Kontraktor<br />

14


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

2.2 STATISTIK KONTRAKTOR YANG BERDAFTAR DENGAN CIDB MENGIKUT NEGERI DAN KELAS<br />

(SEHINGGA 28 FEB 2011)<br />

Gred<br />

Keupayaan Menender (RM)<br />

G1 Tidak Melebihi 100,000<br />

G2 Tidak Melebihi 500,000<br />

G3<br />

G4<br />

G5<br />

G6<br />

G7<br />

Tidak Melebihi 1 juta<br />

Tidak Melebihi 3 juta<br />

Tidak Melebihi 5 juta<br />

Tidak Melebihi 10 juta<br />

Tiada had<br />

15<br />

Sumber : CIDB


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

NEGERI<br />

GRED<br />

G1 G2 G3 G4 G5 G6 G7<br />

JUMLAH<br />

BESAR<br />

JOHOR 3,250 970 1,124 337 313 133 285 6,412<br />

KEDAH 2,105 497 352 117 140 63 170 3,444<br />

KELANTAN 2,281 291 303 82 141 47 131 3,276<br />

LABUAN 183 26 29 3 11 5 10 267<br />

MELAKA 1,093 336 360 112 123 39 103 2,166<br />

NEGERI SEMBILAN 2,209 391 424 92 125 43 79 3,363<br />

PAHANG 2,141 470 570 158 148 47 117 3,651<br />

PERAK 2,594 577 618 158 185 76 107 4,315<br />

PERLIS 960 85 71 22 25 3 22 1,188<br />

PULAU PINANG 1,356 553 610 130 199 94 245 3,187<br />

SABAH 4,449 854 887 148 207 80 336 6,961<br />

SARAWAK 1,220 517 458 140 185 89 329 2,938<br />

SELANGOR 4,324 1,125 2,031 543 784 264 931 10,002<br />

TERENGGANU 2,272 311 372 146 220 76 174 3,571<br />

WILAYAH<br />

PERSEKUTUAN<br />

1,690 785 1986 474 1,027 381 1,377 7,720<br />

JUMLAH 32,127 7,788 10,195 2,662 3,833 1,440 4,416 62,461<br />

16


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

JOHOR<br />

KEDAH<br />

i) KEJURUTERAAN AWAM<br />

NEGERI<br />

KELANTAN<br />

LABUAN<br />

MELAKA<br />

NEGERI SEMBILAN<br />

PAHANG<br />

PERAK<br />

PERLIS<br />

PULAU PINANG<br />

SABAH<br />

SARAWAK<br />

SELANGOR<br />

GRED<br />

G1 G2 G3 G4 G5 G6 G7<br />

2,928 621 885 296 280 115 260<br />

2,001 341 295 105 130 57 165<br />

2,191 195 283 79 138 44 127<br />

163 14 24 3 11 5 9<br />

1,021 233 294 104 118 37 93<br />

2,120 252 373 83 119 40 75<br />

2,033 334 503 151 140 45 112<br />

2,408 378 505 140 175 66 101<br />

939 38 62 21 25 3 21<br />

1,188 324 414 100 161 87 207<br />

3653 660 698 130 188 73 305<br />

1,117 443 376 114 159 82 318<br />

3,988 707 1,437 417 619 198 792<br />

TERENGGANU<br />

2,191 206 332 140 203 74 170<br />

WILAYAH<br />

PERSEKUTUAN 1,440 410 1,311 348 782 285 1,165<br />

JUMLAH<br />

JUMLAH<br />

BESAR<br />

5,385<br />

3,094<br />

3,057<br />

229<br />

1,900<br />

3,062<br />

3,318<br />

3,773<br />

1,109<br />

2,481<br />

5,707<br />

2,609<br />

8,158<br />

3,316<br />

5,741<br />

29,381 5,156 7,792 2,231 3,248 1,211 3,920 52,939<br />

Sumber : CIDB<br />

17


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

ii) PEMBINAAN BANGUNAN<br />

NEGERI<br />

GRED<br />

G1 G2 G3 G4 G5 G6 G7<br />

JUMLAH<br />

BESAR<br />

JOHOR 3,069 700 974 302 276 116 260 5,697<br />

KEDAH 2,001 345 302 105 131 58 166 3,108<br />

KELANTAN 2,176 194 282 82 138 45 126<br />

LABUAN 174 18 25 3 10 5 8 243<br />

MELAKA 1,048 246 305 106 114 38 92<br />

NEGERI SEMBILAN 2,145 266 384 87 120 39 74<br />

PAHANG 2,017 337 485 150 140 44 110<br />

PERAK 2,391 406 535 141 178 69 98 3,818<br />

PERLIS 938 41 62 21 25 3 21 1,111<br />

PULAU PINANG 1,258 372 489 104 166 84 211 2,684<br />

SABAH 3,963 703 807 139 195 72 306 6,185<br />

SARAWAK 1,133 447 374 114 157 79 312 2,616<br />

SELANGOR 4,065 773 1,580 436 627 192 785 8,458<br />

TERENGGANU 2,133 203 324 139 201 73 169 3,242<br />

WILAYAH<br />

PERSEKUTUAN<br />

1,543 468 1,463 370 799 285 1,136 6,064<br />

JUMLAH 30,054 5,519 8,391 2,299 3,277 1,202 3,874 54,616<br />

3,043<br />

1,949<br />

3,115<br />

3,283<br />

18<br />

Sumber : CIDB


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

iii) MEKANIKAL DAN ELEKTRIKAL<br />

NEGERI<br />

GRED<br />

G1 G2 G3 G4 G5 G6 G7<br />

JUMLAH<br />

BESAR<br />

JOHOR 210 326 213 59 78 37 79 1,002<br />

KEDAH 111 181 68 22 24 9 31 446<br />

KELANTAN 141 124 48 7 26 12 28 386<br />

LABUAN 11 10 9 1 5 1 4 41<br />

MELAKA 68 117 74 17 27 5 32 340<br />

NEGERI SEMBILAN 110 163 77 15 24 10 21 420<br />

PAHANG 124 155 113 19 25 14 36 486<br />

PERAK 148 180 83 23 23 24 28 509<br />

PERLIS 40 50 16 3 2 0 3 114<br />

PULAU PINANG 132 212 154 36 47 19 69 669<br />

SABAH 252 147 113 23 38 19 99 691<br />

SARAWAK 113 91 102 36 46 30 123 541<br />

SELANGOR 341 462 579 182 305 138 366 2,374<br />

TERENGGANU 133 119 106 24 53 21 39 495<br />

WILAYAH<br />

PERSEKUTUAN<br />

204 332 632 149 372 179 581 2,449<br />

JUMLAH 2,138 2,669 2,387 616 1,095 518 1,539 10,962<br />

Sumber : CIDB<br />

19


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

2.3 STATISTIK BILANGAN PENGELUAR/PEMBEKAL BAHAN BINAAN BUMIPUTERA MENGIKUT NEGERI<br />

(SEHINGGA 28 FEBRUARI 2011)<br />

BIL. NEGERI BILANGAN<br />

1 Johor 31<br />

2 Kedah 47<br />

3 Kelantan 26<br />

4 Melaka 27<br />

5 Negeri Sembilan 16<br />

6 Pahang 17<br />

7 Perak 56<br />

8 Perlis 8<br />

9 Pulau Pinang 23<br />

10 Selangor 90<br />

11 Terengganu 66<br />

12 W. Persekutuan 33<br />

13 Sabah 14<br />

14 Sarawak 13<br />

Jumlah Keseluruhan 467<br />

Sumber : Bahagian Pembangunan Bumiputera<br />

20


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

2.4 PINJAMAN SKIM WANG AMANAH KONTRAKTOR (SKWAK) 2009 – 28 Februari 2011<br />

2009 2010 2011<br />

BIL.<br />

NEGERI<br />

PERMOHONAN<br />

DILULUSKAN<br />

AMAUN<br />

(RM JUTA)<br />

PERMOHONAN<br />

DILULUSKAN<br />

AMAUN<br />

(RM JUTA)<br />

PERMOHONAN<br />

DILULUSKAN<br />

AMAUN<br />

(RM JUTA)<br />

1 Johor 6 1.780 - - - -<br />

2 Kedah 2 0.370 4 0.680 - -<br />

3 Kelantan 3 0.940 - - - -<br />

4 Melaka 2 0.460 5 0.909 - -<br />

5 Negeri Sembilan 0 0 - - - -<br />

6 Pahang 6 1.985 3 0.770 - -<br />

7 Perak 0 0 - - - -<br />

8 Perlis 3 0.880 - - - -<br />

9 Pulau Pinang 2 0.400 - - - -<br />

10 Sabah 0 0 - - - -<br />

11 Sarawak 0 0 - - - -<br />

12 Selangor / WP<br />

KL<br />

4 0.670 - - - -<br />

13 Terengganu 2 0.800 1 0.280 2 0.47<br />

JUMLAH 30 8.285 13 2.639 2 0.47<br />

Sumber : Bahagian Pembangunan Bumiputera<br />

21


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

B A B 3 : INDUSTRIALISED BUILDING SYSTEM (IBS)<br />

3.1 <strong>PROJEK</strong>-<strong>PROJEK</strong> RMK-9 MENGGUNAKAN KAEDAH IBS (31 DISEMBER 2011)<br />

Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />

22


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

3.2 ANALISIS STATUS AKTIVITI <strong>PROJEK</strong> MENGGUNAKAN KAEDAH IBS MENGIKUT AGENSI PELAKSANA<br />

PELANGGAN<br />

Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />

23


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

3.3 ANALISIS STATUS AKTIVITI <strong>PROJEK</strong> MENGGUNAKAN KAEDAH IBS MENGIKUT KEMENTERIAN<br />

Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />

24


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

(.....sambungan)<br />

Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />

25


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

3.4 TABURAN <strong>PROJEK</strong> MENGGUNAKAN KAEDAH IBS MENGIKUT NEGERI<br />

Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />

26


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

Sumber : Unit Penyelarasan Pelaksanaan (ICU), JPM<br />

27


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

3.5 BILANGAN PENGELUAR KOMPONEN IBS YANG BERDAFTAR DENGAN CIDB (30 SEPTEMBER 2010)<br />

Sumber : CIDB<br />

28


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

3.6 BILANGAN PENGELUAR DAN KOMPONEN IBS YANG BERDAFTAR DENGAN CIDB<br />

Sumber : CIDB<br />

29


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

3.7 TABURAN KONTRAKTOR DAN PENGELUAR IBS BERDAFTAR DENGAN CIDB MENGIKUT NEGERI<br />

Sumber : CIDB<br />

30


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

Sumber : CIDB<br />

31


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

B A B 4 : <strong>MAKLUMAT</strong> J A L A N P E R S E K U T U A N D A N<br />

J A M B A T A N<br />

4.1 STATISTIK JALAN PERSEKUTUAN (BUKAN BERTOL)<br />

Negeri<br />

PERSEKUTUAN<br />

JUMLAH<br />

Gravel<br />

Paved (KM)<br />

Earth (KM) (KM)<br />

(KM)<br />

Johor 2,343.87 0.00 0.00 2,343.87<br />

Melaka 246.05 0.00 0.00 246.05<br />

Negeri Sembilan 1,319.13 3.10 0.00 1,322.23<br />

Selangor 975.08 0.00 0.00 975.08<br />

Perak 1,461.74 0.00 0.00 1,461.74<br />

Pulau Pinang 190.04 0.00 0.00 190.04<br />

Kedah 968.00 0.00 0.00 968.00<br />

Perlis 211.30 0.00 0.00 211.30<br />

Pahang 3,753.67 7.30 0.00 3,760.97<br />

Terengganu 1,151.09 0.00 0.00 1,151.09<br />

Kelantan 1,189.09 0.00 0.00 1,189.09<br />

W.P. Putrajaya 80.34 0.00 0.00 80.34<br />

Semenanjung <strong>Malaysia</strong> (a) 13,889.39 10.40 0.00 13,889.86<br />

Sabah 1,501.84 0.00 0.00 1,501.84<br />

Sarawak 1,423.79 0.00 0.00 1,423.79<br />

W.P Labuan 98.20 0.00 0.00 98.20<br />

<strong>Malaysia</strong> Timur (b) 3,032.83 0.00 0.00 3,032.83<br />

JUMLAH (a+b) 16,922.22 10.40 0.00 16,932.66<br />

1. Data bagi Jalan Paved adalah<br />

berdasarkan maklumat pewartaan<br />

sehingga 31.12.2009.<br />

2. Data bagi Jalan Gravel & Earth<br />

adalah berdasarkan Statistik Jalan<br />

2009 JKR.<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

32


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

4.2 STATISTIK JALAN NEGERI (TAHUN 2009)<br />

Negeri<br />

JALAN NEGERI<br />

JUMLAH<br />

Gravel<br />

Paved (KM)<br />

Earth (KM) (KM)<br />

(KM)<br />

Johor 10,604.54 285.74 324.21 11,214.49<br />

Melaka 1,581.05 282.12 20.73 1,883.90<br />

Negeri Sembilan 5,965.81 300.89 586.00 6,852.70<br />

Selangor 12,132.59 677.88 772.21 13,582.68<br />

Perak 6,364.38 678.18 52.79 7,095.36<br />

Pulau Pinang 2,069.03 15.16 76.47 2,160.67<br />

Kedah 5,338.69 219.31 370.70 5,928.70<br />

Perlis 638.88 130.40 93.60 862.88<br />

Pahang 6,824.14 337.33 764.23 7,925.71<br />

Terengganu 4,912.23 236.09 429.18 5,577.49<br />

Kelantan 4,431.08 197.49 346.35 4,974.92<br />

WP K. Lumpur 1,138.18 19.08 0.00 1,157.26<br />

Jumlah kecil 62,000.60 3,379.67 3,836.47 69,216.76<br />

Sabah 6,482.26 10,618.68 1533.58 18,634.53<br />

Sarawak 12,873.05 2,328.88 2,906.06 18,108.00<br />

WP Labuan 76.20 35.53 4.12 115.85<br />

Jumlah kecil 19,431.51 12,983.09 4443.76 36,858.38<br />

JUMLAH 81,432.12 16,362.76 8,280.23 106,075.14<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

33


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

4.3 SENARAI JALAN PERSEKUTUAN<br />

Kategori Jalan Persekutuan<br />

Bilangan<br />

Utama 285<br />

Felda 390<br />

Industri 47<br />

Institusi Utama 106<br />

JUMLAH 828<br />

4.4 STATISTIK JAMBATAN PERSEKUTUAN MENGIKUT NEGERI<br />

NEGERI<br />

BILANGAN<br />

KEDAH 611<br />

PERLIS 44<br />

PULAU PINANG 353<br />

PERAK 2,353<br />

SELANGOR 390<br />

KELANTAN 464<br />

TERENGGANU 805<br />

PAHANG 1,512<br />

JOHOR 1,029<br />

WILAYAH PERSEKUTUAN (LABUAN) 3<br />

MELAKA 158<br />

NEGERI SEMBILAN 483<br />

JUMLAH 8,205<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

34


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

4.5 SKOP KERJA RUTIN PENYENGGARAAN JALAN PERSEKUTUAN<br />

ITEM PERKARA PUSINGAN KERJA<br />

R01<br />

R02<br />

R03<br />

R04<br />

Menampal pothole<br />

Meratakan bahu jalan<br />

Memotong rumput<br />

Mencuci perabot jalan<br />

Patching pothole siap sepenuhnya dalam masa satu hari.<br />

Perlu apabila perbezaan dengan aras jalan melebihi 50mm. (Tertakluk<br />

kepada syarat perjanjian, iaitu sebanyak maksima 10% setahun daripada<br />

keluasan keseluruhan bahu jalan yang disenggara)<br />

Semua Jalan Persekutuan<br />

- 12 kali/tahun<br />

i) Jalan Protokol -4 kali/tahun<br />

ii) Jalan ‘Primary’-2 kali/tahun<br />

iii) Jalan ‘Secondary’-2 kali/tahun<br />

R05<br />

R07<br />

B<br />

Mencuci pembetung dan<br />

jambatan<br />

Mencuci longkang<br />

Pemeriksaan berjadual<br />

i) Jalan Protokol -4 kali/tahun<br />

ii) Jalan ‘Primary’-2 kali/tahun<br />

iii) Jalan ‘Secondary’-2 kali/tahun<br />

i) Jalan Protokol- 4 kali/tahun<br />

ii) Jalan ‘Primary’-2 kali/tahun<br />

iii) Jalan ‘Secondary’-2 kali/tahun<br />

Semua Jalan Persekutuan<br />

- 2 kali/minggu<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

35


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

4.6 SENARAI KONSESI PENYENGGARAAN JALAN PERSEKUTUAN<br />

BIL<br />

SYARIKAT /<br />

KONSESI<br />

1 Roadcare(M) Sdn Bhd<br />

2<br />

3<br />

Selia Senggara<br />

Selatan Sdn Bhd<br />

Belati Wangsa (M)<br />

Sdn Bhd<br />

4 Gammerlite Sdn Bhd<br />

5<br />

Lintasan<br />

Sdn Bhd<br />

Resources<br />

ZON<br />

Tengah Dan<br />

Timur<br />

Selatan<br />

Utara<br />

Pantai Timur<br />

Sabah<br />

Pantai Barat<br />

Sabah Dan WP<br />

Labuan<br />

6 PPES Works Sdn Bhd Sarawak Zon 1<br />

7<br />

8<br />

HCM Engineering Sdn<br />

Bhd<br />

Endaya Construction<br />

Sdn Bhd<br />

NEGERI<br />

Selangor, Pahang,<br />

Terengganu, Kelantan<br />

Johor, Melaka, Negeri<br />

Sembilan<br />

Perak, Pulau Pinang,<br />

Kedah, Perlis<br />

Sandakan, Telupid,<br />

Lahad Datu, Kunak,<br />

Beluran, Tawau<br />

Kota Kinabalu, Tenom,<br />

Sipitang, Beaufort,<br />

Keningau, Kota Belud,<br />

Kudat dan WP Labuan<br />

Kuching, Samarahan,<br />

Sri Aman, Betong,<br />

Sarikei<br />

TEMPOH<br />

KONSESI<br />

(TAHUN)<br />

TEMPOH KONTRAK<br />

15 16/02/2001 – 15/2/2016<br />

15 16/02/2001 – 15/2/2016<br />

15 16/02/2001 – 15/2/2016<br />

15 1/9/2003 – 31/8/2018<br />

15 1/9/2003 – 31/8/2018<br />

15 1/9/2003 – 31/8/2018<br />

Sarawak Zon 2A Sibu, Bintulu 15 1/9/2003 – 31/8/2018<br />

Sarawak Zon 2B Miri, Limbang, Lawas 15 1/9/2003 – 31/8/2018<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

36


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

4.7 SENARAI JALAN BELUM DIWARTAKAN DI BAWAH AKTA JALAN PERSEKUTUAN 1959 (<br />

(SEHINGGA 28 FEBRUARI 2011)<br />

Bil<br />

NEGERI SEMBILAN<br />

Nama Jalan<br />

Kilometer<br />

(KM)<br />

1 Jalan Kampung Gedes 3.35<br />

2 Jalan Tampin Lama 1.98<br />

PAHANG<br />

3 Jalan Mentiga - Kertau 45.00<br />

4 Jalan Pos Slim-Loging 11.70<br />

5 Jalan Pintasan Gebeng 17.00<br />

PERAK<br />

6 Jalan Damar Laut Segari 5.70<br />

7 Jalan Ipoh – Kuala Kangsar (Jalan Tuanku Abdul Rahman) 6.60<br />

8 Jalan Gopeng – Siputeh 9.20<br />

KEDAH<br />

9 Jalan Lunas – Kupang, Baling 32.20<br />

10 Jalan Pintas Kuala Pegang 2.50<br />

11 (Jalan Baling-Kupang-Lunas) Jalan Kupang - Grik 61.78<br />

12 Jalan Kupang/Kg. Sedek/Kg. Pisang (K171) dan Kg.<br />

Hangus/Jerai/Tiak/Kuala Kuang (K173), Baling<br />

13 Jalan Masuk Kedua ke Kawasan Perindustrian Kulim 4.92<br />

14<br />

(Jalan Langgar) Jalan dari Simpang Hutan Kampong ke Pejabat Pos<br />

Lama Jalan Raja<br />

5.00<br />

5.63<br />

37


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

Bil<br />

Nama Jalan<br />

Kilometer<br />

(KM)<br />

15 (Jalan Lencongan Barat) Jalan Lencongan Barat Sungai Petani 12.00<br />

16<br />

(Jalan Ulu Melaka-Makam Mahsuri) Jalan Ulu Melaka ke Makam<br />

Mahsuri, Langkawi<br />

17 (Jalan Sultan Bahiyah) Lebuhraya Sultan Bahiyah 13.84<br />

KELANTAN<br />

6.03<br />

18<br />

Laluan D28 (Jalan Tanah Merah - Kampung Putat - Simpang 3 Batu<br />

Empat) ke Km 57.03 (Jalan Machang - Jeli)<br />

7.80<br />

19 Laluan D24/D22 (Jalan Pasir Mas - Pohon Tanjong - Rantau Panjang) 16.46<br />

20 Laluan D27 (Jalan Tanah Merah Bukit Gading - Alor Pasir - Lubok Jong) 14.00<br />

21 Jalan Tuju ke Jambatan Baru Bukit Bunga, Tanah Merah 1.65<br />

PERLIS<br />

22 Jalan Ulu Pauh Chuping Padang Besar 28.50<br />

JUMLAH 312.84<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

38


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

4.8 SENARAI 10 LOKASI BLACKSPOT<br />

10 lokasi Kawasan Tertinggi Kerap Berlaku Kemalangan (Mengikut Keutamaan KPI YB Menteri)<br />

Bil<br />

Lokasi<br />

No<br />

Laluan<br />

No<br />

Seksyen<br />

Negeri Daerah Skop <strong>Kerja</strong> Pembaikan<br />

1<br />

Jalan Muar - Melaka (Tanjung<br />

Gading), Johor<br />

2 Jalan Serting Tengah<br />

FT005 189 Johor Muar<br />

FT010 41.8 N.Sembilan<br />

Jempol<br />

3 Jalan Damar Laut - Pantai Remis FT060 35.2 Perak Manjung<br />

4<br />

Jalan Alor Setar - Kangar - Padang<br />

Besar<br />

FT007 km 33 Perlis -<br />

5 Jalan Butterworth - Alor Setar FT001 833.1 Kedah Yan<br />

6 Jalan Kuala Terengganu - Kuantan FT003 399 Terengganu Kemaman<br />

7 Jalan Kuantan - Segamat<br />

8<br />

9<br />

10<br />

FT012 39 Pahang Rompin<br />

Jalan Gua Musang - Kuala Krai FT008 259.5 Kelantan Gua Musang<br />

Jalan Batu Pahat - Kluang FT050 16 Johor Batu Pahat<br />

Kuala<br />

Jalan Klang - Teluk Intan FT005 468 Selangor Selangor<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

Pemasangan perabut dan<br />

garisan jalan<br />

39


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

4.9 <strong>MAKLUMAT</strong> PERUNTUKAN BAGI KERJA-KERJA MEMBAIKI CERUN DI JALAN PERSEKUTUAN (TAHUN 2010)<br />

Peruntukan Pembaikan Cerun B27<br />

RM30,300,000<br />

Peratus Perbelanjaan daripada peruntukan tahunan 0.88%<br />

Tarikh Kemaskini : 28/02/11<br />

Bil<br />

Negeri<br />

Jumlah<br />

peruntukan<br />

(RM)<br />

Peruntukan<br />

Pembaikan<br />

Cerun B27 (RM)<br />

Peruntukan Program<br />

Rangsangan B11-Fasa I<br />

(RM)<br />

Perbelanjaan (RM)<br />

1 Perak 1,090,000.00 0.00 0.00% 18<br />

2 Selangor 1,910,000.00 0.00 0.00% 11<br />

3 Pahang 0.00 0.00%<br />

4 Kelantan 0.00 0.00%<br />

5 Johor 2,200,000.00 0.00 0.00% 26<br />

6 Kedah 970,000.00 0.00 0.00% 16<br />

7 Labuan 750,000.00 0.00 0.00% 3<br />

8 Melaka 1,720,000.00 0.00 0.00% 14<br />

9 Negeri Sembilan 1,842,000.00 0.00 0.00% 14<br />

10 Pulau Pinang 1,340,000.00 0.00 0.00% 16<br />

11 Perlis 200,000.00 0.00 0.00% 1<br />

12 Terengganu 930,000.00 0.00 0.00% 16<br />

13 Sabah 4,500,000.00 0.00 0.00% 9<br />

14 Sarawak 3,320,000.00 0.00 0.00% 17<br />

15 Senggara Cerun 0.00 0.00%<br />

Jumlah 20,772,000.00 0.00 0.00% 161<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

40


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BAB 5 : <strong>MAKLUMAT</strong> BANGUNAN GUNASAMA PERSEKUTUAN<br />

5.1 SENARAI BANGUNAN GUNASAMA PERSEKUTUAN (SEHINGGA 28 FEBRUARI 2011)<br />

BIL ZON NEGERI NAMA BANGUNAN<br />

1<br />

TAHUN SIAP<br />

DIBINA<br />

USIA<br />

BANGUNAN<br />

KELUASAN<br />

(lettable area)<br />

ft2<br />

4<br />

Sabah<br />

Sabah Bangunan Persekutuan Tawau 1982 28 92,971.68 1<br />

5 Sabah Bangunan Persekutuan Kota Belud 2000 10 31,255.00 1<br />

BIL. BLOK<br />

Sabah Rumah Persekutuan Beaufort 1983 27 20,940.82 1<br />

2 Sabah Rumah Persekutuan Keningau 1989 21 15,522.12 1<br />

3 Sabah Bangunan Persekutuan Sandakan 1983 27 91,783.88 1<br />

6 Sabah Wisma Dang Bandang 1977 33 68,618.56 1<br />

7 Sabah Rumah Persekutuan Kota Kinabalu 1972 38 107,030.01 1<br />

8 Sabah<br />

Kompleks Pentadbiran Kerajaan<br />

Persekutuan Sabah<br />

2008 5 747,873.43 5<br />

Jumlah Kecil 1,175,995.5 12<br />

8<br />

Kedah Bangunan Persekutuan Alor Star 1963 47 25,714.12 2<br />

9 Kedah Wisma Persekutuan Alor Star 1973 37 109,629.73 1<br />

Utara<br />

10 Kedah<br />

11 Perlis<br />

Kompleks Pentadbiran Kerajaan Persekutuan<br />

Bandar Muadzam Shah, Alor Setar<br />

Bangunan Persekutuan Kangar (Jln.<br />

Persiaran Jubli Emas)<br />

2008 2 696,697.26 7<br />

1996 14 110,740.30 1<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

41


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BIL ZON NEGERI NAMA BANGUNAN<br />

12 Perlis<br />

Bangunan Persekutuan Kangar Tun Hj.<br />

Abdul Razak<br />

TAHUN SIAP<br />

DIBINA<br />

USIA<br />

BANGUNAN<br />

KELUASAN<br />

(lettable area)<br />

ft2<br />

BIL. BLOK<br />

1977 33 21,596.24 1<br />

13 Perlis<br />

14 Pulau Pinang<br />

Bangunan Persekutuan Kangar (Lama), Jln.<br />

Hospital<br />

Bangunan Pejabat Kerajaan Persekutuan<br />

KOMTAR (tkt. 36 - tkt. 42)<br />

1962 48 7,823.92 1<br />

1974 36 103,671.32 1<br />

15 Pulau Pinang Bangunan Tunku Syed Putra 1959 51 100,498.62 1<br />

16 Pulau Pinang<br />

Bangunan Persekutuan Pulau Pinang (Jalan<br />

Anson)<br />

2004 6 169,714.00 1<br />

17 Perak Wisma Persekutuan Taiping 1986 24 109,024.36 1<br />

18 Perak<br />

19 Perak<br />

Bangunan Persekutuan Ipoh<br />

(Jln. Pamglima Bukit Gantang Wahab)<br />

Bangunan Persekutuan Ipoh<br />

(Greentown)<br />

1962 48 33,150.43 2<br />

1996 14 179,716.39 1<br />

20 Perak Bangunan Persekutuan Sri Manjung 1996 14 43,297.22 1<br />

21 Perak Bangunan Persekutuan Teluk Intan 1973 37 30,399.26 2<br />

22 Perak Bangunan Persekutuan Gerik 1997 13 49,499.12 1<br />

23<br />

Selatan<br />

24 Johor<br />

Jumlah Kecil 1,094,475.03 24<br />

Johor Wisma Persekutuan Johor Bahru 1976 34 211,994.76 2<br />

Kompleks Sultan Abu Bakar (CIQ), Gelang<br />

Patah<br />

1996 14 196,732.92 23<br />

42


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BIL ZON NEGERI NAMA BANGUNAN<br />

TAHUN SIAP<br />

DIBINA<br />

USIA<br />

BANGUNAN<br />

KELUASAN<br />

(lettable area)<br />

ft2<br />

BIL. BLOK<br />

25 Johor Bangunan Gunasama Persekutuan Kluang 1997 13 47,674.00 1<br />

26 Johor<br />

27<br />

Negeri<br />

Sembilan<br />

Bangunan Gunasama Persekutuan Batu<br />

Pahat<br />

1997 13 46,323.95 1<br />

Wisma Persekutuan Seremban 1979 31 176,103.95 1<br />

28 Melaka<br />

Bangunan Pejabat-Pejabat Pelabuhan<br />

Melaka<br />

1964 46 9,157.66 1<br />

29 Melaka Wisma Persekutuan Melaka 1974 36 112,991.02 1<br />

Jumlah Kecil 800,978.26 30<br />

30<br />

Sarawak<br />

Wisma Persekutuan Sri Aman Blok 2, Blok 3<br />

& Blok 4<br />

1993 17<br />

16,255.85<br />

(Blok 2)<br />

30,688.00<br />

(Blok 3&4)<br />

3<br />

31 Sarawak Bangunan Sultan Iskandar, Kuching 1988 22 265,146.53 1<br />

32 Sarawak Wisma Persekutuan Sri Aman Blok 1 1975 35 11,434.50 1<br />

33 Sarawak Wisma Persekutuan Saratok 1992 18 14,015.13 1<br />

Sarawak<br />

34 Sarawak Wisma Persekutuan Sarikei Blok I & II 1978 32 31,471.48 2<br />

35 Sarawak Wisma Persekutuan Sibu Blok 1 & 2 1976 34 36,475.66 2<br />

36 Sarawak Wisma Persekutuan Kapit 1979 31 22,031.98 1<br />

37 Sarawak Wisma Persekutuan Miri Blok 1 & 2 1973 37 33,561.50 2<br />

38 Sarawak Wisma Persekutuan Miri Blok A & B 1996 14 28,036.72 2<br />

43


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BIL ZON NEGERI NAMA BANGUNAN<br />

TAHUN SIAP<br />

DIBINA<br />

USIA<br />

BANGUNAN<br />

KELUASAN<br />

(lettable area)<br />

ft2<br />

39 Sarawak Wisma Persekutuan Lawas 1978 32 12,554.47 1<br />

40 Sarawak Wisma Persekutuan Marudi 1996 14 9,428.74 1<br />

41 Sarawak<br />

Wisma Persekutuan Limbang II<br />

( Blok A & B )<br />

BIL. BLOK<br />

1974 36 15,125.42 2<br />

42 Sarawak Wisma Persekutuan Bintulu 1983 27 14,135.69 1<br />

43 Sarawak Wisma Persekutuan Limbang I 1972 38 8,882.15 1<br />

44 Sarawak<br />

Bangunan Tun Datuk Patinggi Tuanku Haji<br />

Bujang, Kuching<br />

1972 38 140,069.69 1<br />

45 Sarawak Wisma Persekutuan Sibu Blok 3 1992 18 74,780.33 1<br />

Jumlah Kecil 764,093.84 23<br />

46<br />

Kelantan Bangunan Persekutuan Kota Bharu 1963 47 38,484.86 3<br />

47 Kelantan Bangunan Persekutuan Kuala Krai 1982 28 20,312.52 1<br />

48 Kelantan Wisma Persekutuan Kota Bahru 1975 35 155,809.98 1<br />

49 Kelantan Bangunan Persekutuan Gua Musang 1989 21 59,659.47 1<br />

50<br />

Timur<br />

Pahang Bangunan Persekutuan Raub 1995 15 53,858.75 1<br />

51 Pahang Wisma Persekutuan Kuantan 1979 31 147,461.41 1<br />

52 Pahang Bangunan Persekutuan Maran 1995 15 52,394.74 1<br />

53 Pahang Bangunan Persekutuan Temerloh 2001 9 71,995.00 1<br />

54 Terengganu Wisma Persekutuan Kuala Terengganu 1975 35 145,398.17 1<br />

44


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BIL ZON NEGERI NAMA BANGUNAN<br />

TAHUN SIAP<br />

DIBINA<br />

USIA<br />

BANGUNAN<br />

KELUASAN<br />

(lettable area)<br />

ft2<br />

55 Terengganu Bangunan Persekutuan Kemaman 1994 16 51,334.81 1<br />

56 Terengganu Bangunan Persekutuan Besut 1995 15 50,698.22 1<br />

BIL. BLOK<br />

Jumlah Kecil 847,407.93 13<br />

57<br />

58<br />

59<br />

Tengah<br />

Kuala<br />

Lumpur<br />

Kuala<br />

Lumpur<br />

Kuala<br />

Lumpur<br />

Rumah Persekutuan Kuala Lumpur 1954 56 86,548.00 1<br />

Kompleks Kerajaan Bukit Perdana, Kuala Lumpur 1952 58 474,180.00 13<br />

Kompleks Kerajaan Jalan Duta, Kuala Lumpur 1978 32 998,360.00 5<br />

60 Selangor Bangunan Persekutuan Petaling Jaya, Selangor 1958 52 87,566.00 1<br />

Jumlah Kecil 1,646,654.00 20<br />

JUMLAH KESELURUHAN - 6,329,604.56 122<br />

Nota: Keluasan bagi Kompleks Pentadbiran Kerajaan Persekutuan Bandar Muadzam Shah, Alor Setar adalah anggaran sahaja kerana belum<br />

pengesahan daripada Jabatan Penilaian dan Perkhidmatan Harta, <strong>Kementerian</strong> Kewangan.<br />

menerima<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

45


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

5.2 SKOP PENYENGGARAAN BANGUNAN PERSEKUTUAN<br />

BIL KRITERIA ASPEK PENYELENGGARAAN<br />

1 PEMBERSIHAN DAN PENCUCIAN<br />

2 KERJA-KERJA SENGGARAAN ‘CIVIL’<br />

3 LIF<br />

4 KAWALAN KESELAMATAN<br />

i) Ruang Pejabat dan Kawasan Koridor<br />

ii) Tandas<br />

iii) Pest Control<br />

iv) Lanskap<br />

v) Longkang<br />

vi) Dinding luar<br />

i) Dinding<br />

ii) Lantai<br />

iii) Siling, pintu, tingkap dan jeriji<br />

iv) Gutter, Rain Water Down Pipe and Drain<br />

v) Bumbung<br />

vi) Dataran Kejat<br />

vii) Plumbing and Sanitary fitting<br />

viii) Cat<br />

ix) Papan Tanda<br />

x) Booster pump<br />

xi) Sewerage system<br />

i) Kebersihan lantai dan dinding lif<br />

ii) Kemasan lantai dan dinding<br />

iii) Fungsi ‘indicator lift’<br />

iv) Fungsi lampu dan ‘alarm bell’<br />

v) Sijil Perakuan Kelayakan Mesin Angkut<br />

vi) Kebersihan dalam ’Lift Motor Room’<br />

vii) Levelling lift car<br />

viii) Nombor PMA<br />

i) Rondaan keseluruhan kawasan<br />

ii) Kawalan pintu masuk dan keluar bangunan<br />

iii) Laporan<br />

46


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BIL KRITERIA ASPEK PENYELENGGARAAN<br />

5 KERJA-KERJA SENGGARAAN MEKANIKAL<br />

6 KERJA-KERJA SENGGARAAN ELEKTRIKAL<br />

7 PEMBAYARAN BIL-BIL UTILITI<br />

8<br />

COMPUTERISED MANAGEMENT<br />

INFORMATION SYSTEM<br />

iv) Keadaan pondok kawalan<br />

v) Kaunter pengawal di Lobby<br />

vi) Kekemasan pengawal bertugas<br />

vii) Keadaan pagar keselamatan<br />

i) Chiller<br />

ii) Cooling Tower<br />

iii) Air Handling Unit (AHU)<br />

iv) Ducting and Diffuser<br />

v) Split unit<br />

vi) Pump System<br />

vii) Water Tank<br />

viii) Break glass and alarm bell<br />

ix) Smoke/Heat Detector<br />

x) Water riser/Hose Reel<br />

xi) Portable Fire Extinguisher<br />

i) Generator set<br />

ii) Main Swicth Board<br />

iii) Lighting<br />

iv) Public Address System<br />

v) PA System<br />

vi) PABX System<br />

vii) Lighting Protection System<br />

viii) Luminaries<br />

i) Bil lektrik<br />

ii) Bil air<br />

iii) Bil pembentungan<br />

i) Development system<br />

ii) Monitoring system<br />

iii) Maintenance system<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

47


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

5.3 SENARAI KONSESI PENYENGGARAAN BANGUNAN PERSEKUTUAN<br />

BIL.<br />

PERKARA<br />

ZON<br />

SELATAN &<br />

SARAWAK<br />

UTARA & SABAH TIMUR TENGAH<br />

1 Syarikat Konsesi<br />

Ambang Wira Sdn.<br />

Bhd.<br />

Gemilang<br />

Maintenance Services<br />

Sdn. Bhd.<br />

Building Lindungan<br />

Sdn. Bhd.<br />

2 Tempoh Perjanjian Induk 10 Tahun + 5 Tahun 10 Tahun + 5 Tahun 10 Tahun + 5 Tahun<br />

3<br />

4<br />

Tarikh Perjanjian Induk untuk<br />

Tempoh 10 Tahun<br />

Tarikh Penyambungan<br />

Tempoh Konsesi Untuk<br />

Tempoh 5 Tahun<br />

01hb Jun 1998 - 31hb.<br />

Mei 2008<br />

01hb. Jun 2008 - 1hb.<br />

Mei 2013<br />

16hb. Mac 2001 -<br />

15hb. Mac 2011<br />

Dalam Proses<br />

Permohonan<br />

01hb. April 2001 -<br />

31hb. Mac 2011<br />

Dalam Proses<br />

Permohonan<br />

Belum<br />

diswastakan<br />

5 Yuran Tahunan (RM) 30,401,441.28 26,206,649.88 10,246,606.80<br />

6 Yuran Bulanan (RM) 2,533,453.44 2,183,887.49 853,883.90<br />

7 Bil. Lokasi Bangunan Selatan :7 Utara : 15<br />

Sarawak :16 Sabah : 7<br />

8 Bil. Blok Bangunan Selatan :30 Utara : 24<br />

Sarawak :23 Sabah : 7<br />

11 4<br />

13 20<br />

9<br />

Jumlah Keluasan Bangunan<br />

(ft2)<br />

1,565,072.13 2,679,672.98 847,407.94 1,646,654.00<br />

Nota : Jumlah keluasan bangunan bagi Zon Utara & Sabah adalah anggaran sahaja kerana keluasan bagi Kompleks Pentadbiran Kerajaan Persekutuan<br />

Bandar Muadzam Shah, Alor Setar belum menerima pengesahan daripada Jabatan Penilaian dan Perkhidmatan Harta, <strong>Kementerian</strong> Kewangan.<br />

Sumber: Bahagian Kawalselia Penyenggaraan<br />

48


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BAB 6 : <strong>MAKLUMAT</strong> LEBUHRAYA<br />

6.1 SENARAI LEBUHRAYA BERTOL YANG BEROPERASI (30 JANUARI 2011)<br />

BIL KOD NAMA LEBUHRAYA SINGKATAN PANJANG<br />

1. E1/E2 LEBUHRAYA UTARA SELATAN PLUS 823.3 km<br />

SISTEM<br />

TOL<br />

Terbuka<br />

dan<br />

Tertutup<br />

BILANGAN<br />

R&R<br />

22<br />

2. E3 LEBUHRAYA LALUAN KEDUA MALAYSIA-SINGAPURA LINKEDUA 44.7 km Terbuka 2<br />

3. E5 LEBUHRAYA SHAH ALAM KESAS 35.0 km Terbuka 2<br />

4. E6 LEBUHRAYA UTARA-SELATAN HUBUNGAN TENGAH ELITE 46.6 km Tertutup 3<br />

5. E7 LEBUHRAYA CHERAS-KAJANG<br />

GRAND<br />

SAGA<br />

11.5 km Terbuka 1<br />

6. E8 LEBUHRAYA KUALA LUMPUR-KARAK KLK 60.0 km Terbuka 1<br />

7. E8 LEBUHRAYA PANTAI TIMUR FASA 1 LPT 1 169.0 km Tertutup 4<br />

8. E9 LEBUHRAYA SUNGAI BESI BESRAYA 16.7 km Terbuka 3<br />

9. E10 LEBUHRAYA PANTAI BARU NPE 19.6 km Terbuka -<br />

10. E11 LEBUHRAYA DAMANSARA-PUCHONG LDP 40.0 km Terbuka -<br />

11. E12 LEBUHRAYA BERTINGKAT KUALA LUMPUR-AMPANG AKLEH 7.9 km Terbuka -<br />

12 E 13 LEBUHRAYA KEMUNING - SHAH ALAM LKSA 14.7 km Terbuka -<br />

13. E15 LEBUHRAYA BUTTERWORTH-KULIM KLBK 16.8 km Terbuka 1<br />

14. E16 LEBUHRAYA DUTA-ULU KLANG DUKE 18 km Terbuka -<br />

15. E17 LEBUHRAYA LINGKARAN LUAR BUTTERWORTH BORR 12.1 km Terbuka 1<br />

49


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

BIL KOD NAMA LEBUHRAYA SINGKATAN PANJANG<br />

SISTEM<br />

TOL<br />

BILANGAN<br />

R&R<br />

16. E18<br />

LEBUHRAYA PENYURAIAN TRAFIK LINGKARAN<br />

KAJANG<br />

SILK 37.0 km Terbuka -<br />

17. E20 LEBUHRAYA KUALA LUMPUR-PUTRAJAYA MEX 26.0 km Terbuka 2<br />

18. E21 LEBUHRAYA KAJANG SEREMBAN LEKAS 44.3 km Tertutup<br />

Terbuka<br />

2<br />

19. E22 LEBUHRAYA SENAI DESARU SDE<br />

50.0 KM<br />

(72.6 KM)<br />

Tertutup<br />

2 (Belum<br />

dibuka)<br />

20. E23 LEBUHRAYA SISTEM PENYURAIAN TRAFIK KUALA<br />

LUMPUR BARAT<br />

SPRINT 26.0 km Terbuka -<br />

21. E26 LEBUHRAYA LEMBAH KLANG SELATAN SKVE 19.7 km<br />

(51 km)<br />

Terbuka<br />

Tertutup<br />

2 (Belum<br />

dibuka)<br />

22. E29 LEBUHRAYA SEREMBAN-PORT DICKSON SPDH 22.7 km Terbuka 2<br />

23. E30 LEBUHRAYA PINTAS SELAT KLANG UTARA NKSB 8.0 km<br />

Telah<br />

Ditutup<br />

-<br />

24. E30 LEBUHRAYA PINTAS SELAT KLANG UTARA BARU NNKSB 17.5 KM Terbuka 1<br />

25. E35 LEBUHRAYA SHAH ALAM-KUANG<br />

GUTHRIE<br />

KORIDOR<br />

25.0 KM Terbuka 2<br />

26. E36 JAMBATAN PULAU PINANG JPP 13.5 KM Terbuka -<br />

27. E37 LEBUHRAYA HUBUNGAN TIMUR BARAT METRAMAC 17.0 KM Terbuka -<br />

28. E38 TEROWONG JALAN RAYA DAN PENGURUSAN AIR<br />

BANJIR<br />

SMART 3.06 KM Terbuka -<br />

Sumber: Bahagian Pembangunan dan Penswastaan<br />

50


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

6.2 SENARAI KADAR TOL<br />

Kelas Kenderaan untuk semua lebuhraya kecuali Jambatan Pulau Pinang:<br />

KELAS JENIS KETERANGAN<br />

Kelas 0<br />

Motorsikal, basikal atau kenderaan 2 tayar atau kurang<br />

Kelas 1<br />

Kelas 2<br />

Kelas 3<br />

Kelas 4<br />

Kelas 5<br />

Kenderaan 2 gandar dan 3 atau 4 tayar tidak termasuk teksi<br />

Kenderaan 2 gandar dan 5 atau 6 tayar tidak termasuk bas<br />

Kenderaan 3 gandar atau lebih<br />

Teksi<br />

Bas<br />

1) LEBUHRAYA UTARA –SELATAN (E1/E2)<br />

i) Sistem Tertutup (Lebuhraya Utara Selatan)<br />

Kelas<br />

Kelas 0<br />

Kelas 1<br />

Kelas 2<br />

Kelas 3<br />

Kelas 4<br />

Kelas 5<br />

Bayaran Tol<br />

[sen/km]<br />

Tidak dikenakan tol<br />

13.60 sen setiap 1 kilometer<br />

20.39 sen setiap 1 kilometer<br />

27.19 sen setiap 1 kilometer<br />

6.80 sen setiap 1 kilometer<br />

10.20 sen setiap 1 kilometer<br />

51


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

ii) Sistem Terbuka (Lebuhraya Utara Selatan)<br />

Kelas<br />

Plaza Tol Bukit<br />

Kayu Hitam<br />

Plaza Tol Jitra Plaza Tol Kempas Plaza Tol<br />

Tambak Johor<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 3.60 RM 1.60 RM 2.10 RM 2.90<br />

Kelas 2 RM 5.30 RM 2.30 RM 3.20 RM 4.50<br />

Kelas 3 RM 7.20 RM 3.10 RM 4.10 RM 6.10<br />

Kelas 4 RM 1.70 RM 0.80 RM 1.10 RM 1.40<br />

Kelas 5 RM 2.60 RM 1.20 RM 1.40 RM 2.30<br />

1a) Sistem tol terbuka (Lebuhraya Persekutuan II)<br />

Kelas Plaza Tol Batu Tiga Plaza Tol Sungai Rasau<br />

Kelas 0 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.10 RM 1.00<br />

Kelas 2 RM 1.50 RM 1.30<br />

Kelas 3 RM 2.20 RM 2.00<br />

Kelas 4 RM 0.40 RM 0.40<br />

Kelas 5 RM 0.90 RM 0.80<br />

52


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

b) LEBUHRAYA LALUAN KEDUA MALAYSIA-SINGAPURA (E3 - LINKEDUA)<br />

Kelas<br />

Plaza Tol<br />

Kompleks<br />

Sultan Abu<br />

Bakar<br />

Tanjung Kupang<br />

Komponen<br />

Lebuhraya<br />

Komponen<br />

Jambatan<br />

Laluan<br />

Terus<br />

Plaza Tol<br />

Lima<br />

Kedai<br />

Plaza Tol<br />

Perling<br />

Kelas 0 RM3.20 RM 0.00 RM 1.10 RM 1.10 RM 0.00 RM 0.00<br />

Kelas 1 RM15.20 RM 2.20 RM 5.30 RM 7.50 RM 3.90 RM 2.30<br />

Kelas 2 RM39.00 RM 3.40 RM13.70 RM17.10 RM 7.80 RM 4.60<br />

Kelas 3 RM78.20 RM 6.90 RM27.40 RM34.30 RM 9.80 RM 5.70<br />

Kelas 4 RM13.00 RM 1.10 RM 4.60 RM 5.70 RM 2.00 RM 1.10<br />

Kelas 5 RM20.80 RM 1.80 RM 7.30 RM9.10 RM 3.90 RM 2.30<br />

c) LEBUHRAYA SHAH ALAM (E5 – KESAS)<br />

Kelas<br />

Plaza Tol Awan Besar<br />

Plaza Tol<br />

Sunway<br />

Plaza Tol<br />

Kemuning<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 2.20 RM 2.20 RM 2.20<br />

Kelas2 RM 3.30 RM 3.30 RM 3.30<br />

Kelas3 RM 4.40 RM 4.40 RM 4.40<br />

Kelas 4 RM 1.10 RM 1.10 RM 1.10<br />

Kelas 5 RM 1.70 RM 1.70 RM 1.70<br />

53


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

d) LEBUHRAYA UTARA SELATAN HUBUNGAN TENGAH (E6 – ELITE)<br />

Kelas<br />

Kelas 0<br />

Kelas 1<br />

Kelas2<br />

Kelas3<br />

Kelas 4<br />

Kelas 5<br />

Bayaran Tol<br />

[sen/km]<br />

Tidak dikenakan tol<br />

14.96 sen setiap 1 kilometer<br />

22.43 sen setiap 1 kilometer<br />

29.91 sen setiap 1 kilometer<br />

7.48 sen setiap 1 kilometer<br />

11.22 sen setiap 1 kilometer<br />

e) LEBUHRAYA CHERAS-KAJANG (E7 – GRAND SAGA)<br />

Kelas<br />

Plaza Tol<br />

Batu 9, Cheras<br />

Plaza Tol<br />

Batu 11, Cheras<br />

Kelas 0 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.00 RM 0.90<br />

Kelas2 RM 2.00 RM 1.80<br />

Kelas3 RM 2.00 RM 1.80<br />

Kelas 4 RM 0.50 RM 0.50<br />

Kelas 5 RM 1.00 RM 0.90<br />

54


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

f) LEBUHRAYA KUALA LUMPUR-KARAK (E8 – KLK)<br />

Kelas Plaza Tol Gombak Plaza Tol Betong<br />

Kelas 0 RM 0.00 RM 0.00<br />

Kelas 1 RM 5.00 RM 3.00<br />

Kelas2 RM 10.00 RM 6.00<br />

Kelas3 RM 15.00 RM 9.00<br />

Kelas 4 RM 2.50 RM 1.50<br />

Kelas 5 RM 5.00 RM 3.00<br />

g) LEBUHRAYA PANTAI TIMUR FASA 1 (E8 – LPT1)<br />

Kelas<br />

Kelas 0<br />

Kelas 1<br />

Kelas2<br />

Kelas3<br />

Kelas 4<br />

Kelas 5<br />

Bayaran Tol<br />

[sen/km]<br />

Tidak dikenakan tol<br />

12.00 sen setiap 1 kilometer<br />

24.00 sen setiap 1 kilometer<br />

36.00 sen setiap 1 kilometer<br />

6.00 sen setiap 1 kilometer<br />

12.00 sen setiap 1 kilometer<br />

55


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

h) LEBUHRAYA SUNGAI BESI (E9 – BESRAYA)<br />

Kelas<br />

Plaza Tol Mines<br />

Kelas 0 RM 0.00<br />

Kelas 1 RM 1.30<br />

Kelas2 RM 2.60<br />

Kelas3 RM 2.60<br />

Kelas 4 RM 1.30<br />

Kelas 5 RM 1.30<br />

Nota : Plaza Tol Salak Jaya telah ditutup pada 24 Februari 2009<br />

i) LEBUHRAYA BARU PANTAI (E10 – NPE)<br />

Kelas<br />

Plaza Tol Pantai<br />

Dalam<br />

Plaza Tol<br />

PJS 2<br />

Plaza Tol<br />

PJS 5<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.60 RM 1.00 RM 1.60<br />

Kelas2 RM 3.20 RM 3.20 RM 3.20<br />

Kelas3 RM 4.80 RM 4.80 RM 4.80<br />

Kelas 4 RM 0.80 RM 0.80 RM 0.80<br />

Kelas 5 RM 1.60 RM 1.60 RM 1.60<br />

Nota : Mulai 18 Februari 2011 Kadar tol kelas 1 di Plaza Tol PJS 2 telah dikurangkan daripada RM1.60 kepada RM1.00.<br />

Plaza Tol PJS 2 arah Kuala Lumpur telah ditutup pada 13 Februari 2009.<br />

56


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

j) LEBUHRAYA DAMANSARA-PUCHONG (E11 – LDP)<br />

Kelas<br />

Plaza Tol<br />

Penchala<br />

Plaza Tol PJ<br />

Selatan<br />

Plaza Tol<br />

Puchong Barat<br />

Plaza Tol<br />

Puchong<br />

Selatan<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.60 RM 1.60 RM 1.60 RM 1.60<br />

Kelas 2 RM 3.20 RM 3.20 RM 3.20 RM 3.20<br />

Kelas 3 RM 4.80 RM 4.80 RM 4.80 RM 4.80<br />

Kelas 4 RM 0.80 RM 0.80 RM 0.80 RM 0.80<br />

Kelas 5 RM 1.60 RM 1.60 RM 1.60 RM 1.60<br />

k) LEBUHRAYA BERTINGKAT KUALA LUMPUR-AMPANG (E12 - AKLEH)<br />

Kelas<br />

Plaza Tol Dato’ Keramat<br />

Kelas 0 RM 0.00<br />

Kelas 1 RM 1.50<br />

Kelas 2 RM 3.00<br />

Kelas 3 RM 4.50<br />

Kelas 4 RM 0.80<br />

Kelas 5 RM 1.50<br />

57


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

l) LEBUHRAYA KEMUNING - SHAH ALAM (E13 - LKSA)<br />

Kelas<br />

Plaza Tol Taman<br />

Seri Muda<br />

Plaza Tol Alam<br />

Impian<br />

Kelas 0 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.20 RM 0.60<br />

Kelas 2 RM 2.40 RM 1.20<br />

Kelas 3 RM 3.60 RM 1.80<br />

Kelas 4 RM 0.60 RM 0.60<br />

Kelas 5 RM 1.20 RM 0.60<br />

Nota : Lebuh raya ini akan dibuka secara rasminya pada 18 Mei 2010 dan Kutipan tol pula dijadualkan akan bermula sebulan dari tarikh<br />

pembukaan LKSA iaitu pada 17 Jun 2010<br />

m) LEBUHRAYA BUTTERWORTH-KULIM (E15 – KLBK)<br />

Kelas<br />

Plaza Tol Kubang<br />

Semang<br />

Plaza Tol Lunas<br />

Kelas 0 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.60 RM 1.60<br />

Kelas 2 RM 3.20 RM 3.20<br />

Kelas 3 RM 4.80 RM 4.80<br />

Kelas 4 RM 0.80 RM 0.80<br />

Kelas 5 RM 1.60 RM 1.60<br />

58


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

n) LEBUHRAYA DUTA-ULU KLANG (E16 – DUKE)<br />

Kelas<br />

Plaza Tol Ayer<br />

Panas<br />

Plaza Tol Sentul<br />

Plaza Tol Batu<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 2.00 RM 2.00 RM 2.00<br />

Kelas2 RM 3.00 RM 3.00 RM 3.00<br />

Kelas3 RM 4.00 RM 4.00 RM 4.00<br />

Kelas 4 RM 1.00 RM 1.00 RM 1.00<br />

Kelas 5 RM 1.30 RM 1.30 RM 1.30<br />

o) LEBUHRAYA LINGKARAN LUAR BUTTERWORTH (E17 – BORR)<br />

Kelas<br />

Plaza Tol<br />

Jalan Prai<br />

Plaza Tol<br />

Bagan Ajam<br />

Plaza Tol<br />

Sungai Nyior<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.30 RM 1.20 RM 0.50<br />

Kelas 2 RM 2.60 RM 2.40 RM 1.00<br />

Kelas 3 RM 3.90 RM 3.60 RM 2.00<br />

Kelas 4 RM 0.70 RM 0.60 RM 0.50<br />

Kelas 5 RM 1.30 RM 1.20 RM 0.50<br />

59


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

p) LEBUHRAYA PENYURAIAN TRAFIK LINGKARAN KAJANG (E18 – SILK)<br />

Kelas<br />

Plaza Tol<br />

Sungai Ramal<br />

Plaza Tol<br />

Sungai Balak<br />

Plaza Tol<br />

Bukit Kajang<br />

Plaza Tol<br />

Sungai Long<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.00 RM 1.00 RM 1.00 RM 1.00<br />

Kelas 2 RM 2.00 RM 2.00 RM 2.00 RM 2.00<br />

Kelas 3 RM 3.00 RM 3.00 RM 3.00 RM 3.00<br />

Kelas 4 RM 0.50 RM 0.50 RM 0.50 RM 0.50<br />

Kelas 5 RM 1.00 RM 1.00 RM 1.00 RM 1.00<br />

q) LEBUHRAYA KUALA LUMPUR-PUTRAJAYA (E20 – MEX)<br />

Kelas Plaza Tol Putrajaya Plaza Tol Salak Selatan<br />

Kelas 0 RM 0.00 RM 0.00<br />

Kelas 1 RM 2.50 RM 1.50<br />

Kelas2 RM 5.00 RM 3.00<br />

Kelas3 RM 7.50 RM 4.50<br />

Kelas 4 RM 1.30 RM 0.80<br />

Kelas 5 RM 2.50 RM 1.50<br />

60


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

r) LEBUHRAYA KAJANG SEREMBAN (E21 – LEKAS)<br />

a) Sistem Tertutup<br />

Kelas<br />

Bayaran Tol<br />

[sen/km]<br />

Kelas 0<br />

Kelas 1<br />

Kelas 2<br />

Kelas 3<br />

Kelas 4<br />

Kelas 5<br />

Tidak dikenakan tol<br />

14.96 sen setiap 1 kilometer<br />

22.43 sen setiap 1 kilometer<br />

29.91 sen setiap 1 kilometer<br />

7.48 sen setiap 1 kilometer<br />

11.22 sen setiap 1 kilometer<br />

b) Sistem Terbuka (Plaza Tol Ampangan)<br />

Kelas<br />

Bayaran Tol<br />

[RM]<br />

Kelas 0<br />

Tidak dikenakan tol<br />

Kelas 1 RM 1.90<br />

Kelas 2 RM 2.90<br />

Kelas 3 RM 3.90<br />

Kelas 4 RM 1.00<br />

Kelas 5 RM 1.50<br />

Nota : Telah dibuka sepenuhnya sepanjang 44.3 km dan Plaza Tol Ampangan akan memulakan kutipan tol dijangka pada<br />

20 September 2010<br />

61


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

s) LEBUHRAYA SENAI – DESARU (E22 – SDE) (Sistem Tertutup)<br />

Kelas<br />

Kelas 0<br />

Kelas 1<br />

Kelas 2<br />

Kelas 3<br />

Kelas 4<br />

Kelas 5<br />

Bayaran Tol<br />

[sen/km]<br />

Tidak dikenakan tol<br />

14.96 sen setiap 1 kilometer<br />

22.43 sen setiap 1 kilometer<br />

29.91 sen setiap 1 kilometer<br />

7.48 sen setiap 1 kilometer<br />

11.22 sen setiap 1 kilometer<br />

*Nota : Bagi kenderaan kelas 5, pengurangan sebanyak 50% telah diberikan sehingga 14 September 2010. Kadar tol sepertimana<br />

Perjanjian Konsesi adalah 11.22 sen/km<br />

t) LEBUHRAYA PENYURAIAN TRAFIK KL BARAT (E23 – SPRINT)<br />

Kelas<br />

Plaza Tol Kerinchi<br />

Plaza Tol<br />

Damansara<br />

Plaza Tol<br />

Penchala<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.50 RM 1.00 RM 2.00<br />

Kelas2 RM 3.00 RM 2.00 RM 4.00<br />

Kelas3 RM 4.50 RM 3.00 RM 6.00<br />

Kelas 4 RM 0.80 RM 0.50 RM 1.00<br />

Kelas 5 RM 1.50 RM1.00 RM 2.00<br />

62


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

u) LEBUHRAYA LEMBAH KLANG SELATAN (E26 – SKVE)<br />

Kelas<br />

Kelas 0<br />

Kelas 1<br />

Kelas2<br />

Kelas3<br />

Kelas 4<br />

Kelas 5<br />

Bayaran Tol<br />

[sen/km]<br />

Tidak dikenakan tol<br />

0.1496 sen setiap 1 kilometer<br />

0.2244 sen setiap 1 kilometer<br />

0.2992 sen setiap 1 kilometer<br />

0.748 sen setiap 1 kilometer<br />

0.1122 sen setiap 1 kilometer<br />

*Nota : Lebuhraya ini telah dibuka pada 29 Jun 2010 dan kutipan tol bermula pada 28hb Julai 2010.<br />

v) LEBUHRAYA SEREMBAN-PORT DICKSON (E29 – SPDH)<br />

Kelas Plaza Tol Mambau Plaza Tol Lukut<br />

Kelas 0 RM 0.00 RM 0.00<br />

Kelas 1 RM 2.90 RM 0.70<br />

Kelas2 RM 6.30 RM 1.40<br />

Kelas3 RM 9.50 RM 2.20<br />

Kelas 4 RM 3.20 RM 0.80<br />

Kelas 5 RM 6.30 RM 1.40<br />

63


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

w) LEBUHRAYA PINTAS SELAT KLANG UTARA (E30 – NKSB)<br />

Kelas<br />

Plaza Tol<br />

Telok Kapas<br />

Kelas 0 RM 0.00<br />

Kelas 1 RM 0.50<br />

Kelas 2 RM 1.00<br />

*Nota : Lebuhraya ini telah tamat Perjanjian pada 29hb Disember 2009 dan Plaza Tol telah ditutup pada 21hb Disember 09.<br />

x) LEBUHRAYA PINTAS SELAT KLANG UTARA BARU (E30 – NNKSB)<br />

PLAZA TOL / KADAR TOL (RM)<br />

KAPAR LALUAN TIMUR<br />

KAPAR LALUAN BARAT<br />

BUKIT RAJA KAPAR<br />

KAPAR –<br />

BKT RAJA<br />

PEL.KLANG-<br />

KAPAR<br />

KAPAR -BKT<br />

RAJA<br />

PEL.KLANG-<br />

KAPAR<br />

1 0.60 2.70 1.40 1.60 1.40 1.60<br />

2 1.10 4.80 2.50 2.80 2.50 2.80<br />

3 1.60 6.80 3.50 4.00 3.50 4.00<br />

4 0.30 1.40 0.70 0.80 0.70 0.80<br />

5 0.60 2.40 1.30 1.40 1.30 1.40<br />

64


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

y) LEBUHRAYA SHAH ALAM-KUANG (E35 – GUTHRIE)<br />

Kelas<br />

Plaza Tol<br />

Bukit Jelutong<br />

Plaza Tol Lagong<br />

Plaza Tol Elmina<br />

Kelas 0 RM 0.00 RM 0.00 RM 0.00<br />

Kelas 1 RM 1.40 RM 1.40 RM 1.40<br />

Kelas 2 RM 2.80 RM 2.80 RM 2.80<br />

Kelas 3 RM 4.20 RM 4.20 RM 4.20<br />

Kelas 4 RM 0.70 RM 0.70 RM 0.70<br />

Kelas 5 RM 0.70 RM 0.70 RM 0.70<br />

65


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

z) JAMBATAN PULAU PINANG (E36 – JPP)<br />

Kelas Kenderaan yang menggunakan Jambatan Pulau Pinang:<br />

KELAS JENIS KETERANGAN<br />

kelas 1<br />

Motosikal<br />

kelas 2<br />

Motosikal dengan ruang tepi, kenderaan komersil 3 tayar serta<br />

kereta<br />

kelas 3 Lori dan van 2 gandar dengan 4 tayar /bas 2 gandar dengan 4<br />

tayar<br />

kelas 4<br />

kelas 5<br />

Lori dan van 2 gandar dengan 5 atau 6 tayar / bas 2 gandar<br />

dengan 5 atau 6 tayar<br />

Kenderaan 3 gandar / bas 3 gandar<br />

kelas 6<br />

kelas 7<br />

Kenderaan 4 gandar<br />

Kenderaan 5 gandar atau lebih<br />

Kelas<br />

Plaza Tol Pulau Pinang<br />

Kelas 1 RM 1.40<br />

Kelas 2 RM 7.00<br />

Kelas 3 RM 12.00 / RM 6.00<br />

Kelas 4 RM 25.00 / RM 12.50<br />

Kelas 5 RM 45.00 / RM 22.50<br />

Kelas 6 RM 60.00<br />

Kelas 7 RM 75.00<br />

66


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

aa) LEBUHRAYA METRAMAC (E37 – METRAMAC)<br />

Kelas<br />

Plaza Tol<br />

Lebuhraya Hubungan Timur Barat<br />

Kelas 0 RM 0.00<br />

Kelas 1 RM 0.50<br />

Kelas 2 dan 3 RM 1.00<br />

Kelas 4 RM 0.30<br />

Kelas 5 RM 0.30<br />

bb) LEBUHRAYA TEROWONG SMART (E38 – SMART)<br />

Kelas Plaza Tol Utara Plaza Tol Selatan<br />

Kelas 1 RM 2.00 RM 2.00<br />

Kelas 4 RM 2.00 RM 2.00<br />

Sumber: Bahagian Pembangunan dan Penswastaan<br />

67


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

B A B 7 : <strong>MAKLUMAT</strong> ADUAN AWAM<br />

7.1 STATISTIK ADUAN AWAM KKR DAN AGENSI JANUARI - FEBRUARI 2011<br />

BULAN<br />

TAHUN 2011<br />

JUMLAH ADUAN SELESAI PERATUS<br />

DALAM SIASATAN/<br />

TINDAKAN<br />

Januari 352 352 100% 0<br />

Februari 483 483 100% 0<br />

Mac<br />

April<br />

Mei<br />

Jun<br />

CATATAN<br />

JUMLAH (JAN-JUN) 835 835 100.0% 0<br />

Julai<br />

Ogos<br />

September<br />

Oktober<br />

November<br />

Disember<br />

JUMLAH (JUL-DIS)<br />

JUMLAH 352 352 100% 0<br />

Sumber: Unit Komunikasi Korporat<br />

68


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

7.2 STATISTIK MAKLUM BALAS AWAL ADUAN KKR DAN AGENSI JANUARI - FEBRUARI 2011<br />

MAKLUMBALAS AWAL KEPADA PENGADU<br />

(BILANGAN HARI)<br />

BULAN<br />

ADUAN DITERIMA<br />

3 hari -


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

7.3 STATISTIK PENYELESAIAN ADUAN KKR DAN AGENSI BAGI BULAN JANUARI - FEBRUARI 2011<br />

Jumlah<br />

Aduan<br />

Selesai<br />

ADUAN SELESAI MENGIKUT BILANGAN HARI<br />


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

7.4 STATISTIK KESELURUHAN ADUAN KKR DAN AGENSI BULAN JANUARI - FEBRUARI 2011<br />

BIL AGENSI/JABATAN BILANGAN ADUAN ADUAN SELESAI<br />

BAKI ADUAN BELUM<br />

SELESAI<br />

PERATUS<br />

SELESAI<br />

1 <strong>Kementerian</strong> <strong>Kerja</strong> <strong>Raya</strong> (KKR) 239 239 0 100%<br />

2 Jabatan <strong>Kerja</strong> <strong>Raya</strong> (JKR) 563 563 0 100%<br />

3 Lembaga Lebuhraya <strong>Malaysia</strong> (LLM) 33 33 0 100%<br />

4<br />

Lembaga Pembangunan Industri<br />

Pembinaan (CIDB)<br />

0 0 0 100%<br />

5 Lembaga Juruukur Bahan <strong>Malaysia</strong> (LJBM) 0 0 0 100%<br />

6 Lembaga Jurutera <strong>Malaysia</strong> (LJM) 0 0 0 100%<br />

7 Lembaga Arkitek <strong>Malaysia</strong> (LAM) 0 0 0 100%<br />

JUMLAH 835 835 0 100%<br />

Sumber: Unit Komunikasi Korporat<br />

71


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

7.5 STATISTIK ADUAN AWAM MENGIKUT LAIN-LAIN SALURAN BAGI BULAN JANUARI - FEBRUARI 2011<br />

BIL SALURAN KKR JKR LLM CIDB LJBM LJM LAM JUMLAH PERATUS<br />

1 Laman Web iSPAAA 48 280 15 0 0 0 0 343 41.08%<br />

2 Emel 87 4 0 0 0 0 0 91 10.90%<br />

3 SMS 0 61 6 0 0 0 0 67 8.02%<br />

4 Hari Bertemu Pelanggan 0 1 0 0 0 0 0 1 0.12%<br />

5 Borang 0 0 0 0 0 0 0 0 0.00%<br />

6 Surat/Faks 0 93 0 0 0 0 0 93 11.14%<br />

7 Telefon /Talian Bebas Tol 99 87 6 0 0 0 0 192 22.99%<br />

8<br />

Warkah Untuk PM/e-<br />

Maklumbalas/Laman Web PM<br />

2 2 5 0 0 0 0 9 1.08%<br />

9 Media Cetak 3 35 1 0 0 0 0 39 4.67%<br />

10 Biro Pengaduan Awam 0 0 0 0 0 0 0 0 0.00%<br />

11 PEMUDAH 0 0 0 0 0 0 0 0 0.00%<br />

12 Lain-Lain (HBP) 48 280 15 0 0 0 0 343 41.08%<br />

JUMLAH<br />

239 563 33 0 0 0 0 835 100.00%<br />

SELESAI 835 100.00<br />

BELUM SELESAI 0 0<br />

Sumber: Unit Komunikasi Korporat<br />

72


M A K L U M A T A S A S K E M E N T E R I A N K E R J A R A Y A<br />

7.6 STATISTIK ADUAN AWAM MENGIKUT KATEGORI BAGI BULAN JANUARI - FEBRUARI 2011<br />

BIL KATEGORI JAN FEB MAC APR MEI JUN JUL OGOS SEPT OKT NOV DIS JUMLAH PERATUS<br />

1 Jalan (Jalan Rosak/Berlubang/Tidak<br />

Rata/Tidak Siap)<br />

2 Perabot Jalan (pembahagi jalan,<br />

bonggol,papan tanda dan lain-lain)<br />

3 Lampu (Lampu Jalan/Lampu<br />

Isyarat/Lampu Trafik Rosak/Perlu<br />

Kajian Sistem)<br />

90 165 255 30.54%<br />

10 16 26 3.11%<br />

48 70 118 0.14%<br />

4 Jambatan & Bangunan 5 15 20 2.40%<br />

5 Kemudahan Awam (kawasan Rehat &<br />

Rawat/ flyover/penghadang bunyi/dll)<br />

& Naik Taraf<br />

6 Halangan Di Lebuh <strong>Raya</strong> (Kesesakan<br />

lalulintas/banjir/pokok-pokok besar<br />

menghalang dll)<br />

7 Bayaran Tol (perkhidmatan tn’g/smart<br />

tag/bayaran atau baki tol dll)<br />

8 Kesan Pembinaan (Mengakibatkan<br />

banjir/longkang tersumbat/kerosakan<br />

atau keretakan rumah)<br />

3 0 3 0.36%<br />

2 5 7 0.84%<br />

0 5 5 0.60%<br />

1 1 2 0.24%<br />

9 Polisi Kerajaan 0 0 0 0.00%<br />

10 Pendaftaran Lesen Kontraktor 90 75 165 19.76%<br />

11 Luar Bidang Kuasa/Tidak Berkaitan 64 77 141 16.89%<br />

12 Lain-lain 39 54 93 11.14%<br />

JUMLAH 352 483 835 100.00%<br />

Sumber: Unit Komunikasi Korporat<br />

73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!