12.07.2015 Views

Evaluasi Prospek Lapangan Mataloko Dengan Survie Mise-a-la ...

Evaluasi Prospek Lapangan Mataloko Dengan Survie Mise-a-la ...

Evaluasi Prospek Lapangan Mataloko Dengan Survie Mise-a-la ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Oleh:Edi Suhanto dan Syuhada ArsadipuraKelompok Kerja Panas BumiPusat Sumber Daya Geologi


LOKASIPu<strong>la</strong>u FloresUjelewungAtedai


MengerudaG. InelikaKotaBajawa<strong>Mataloko</strong>Wolo BoboG. InerieNage5 km


HASIL SURVEI SEBELUMNYA


Model Tahanan Jenis dari data MTMT-2Lempung PenudungBaratdayaTimur<strong>la</strong>ut01Air MeteorikKeda<strong>la</strong>man (m)2Zona Reservoir3Panas1 2 3km


SEBARAN TITIK UKUR MISE-A-LA-MASSE9024000Ke BajawaKe Ende9023500Wolo BeluNorthing (meter) UTM_WGS8490230009022500Ke <strong>Mataloko</strong>TodabeluMT 4MT 3MT 5MT 2MTL 1MT 6S. B e l iKe Were9022000285500 286000 286500 287000 287500 288000Easting (meter) UTM_WGS84


PETA SITUASI SUMUR MATALOKOPETA SITUASI PEMBORANLAPANGAN PANAS BUMI MATALOKOKABUPATEN NGADA, NTTMT40 m 25 m 50 m 75 m 100 mBANGUNAN PLNMT6KETERANGANJa<strong>la</strong>nMT3MT5Wall padPondasi borBak pembuangan gasSumur borSaluran pipaManifestasi baruMT2MT2: 16 t/h , TKS MT3=613 5.5 kscg mMT3: 6.5-7.7 t/h, MT5=378 TKS 4.5 mkscgMT4: 1.9-2.3 t/h, MT4=756 TKS 4 kscg mfraksi air: MT2=180 0.036 t/hm


MT5MT-3 dan MT5


0 50PETA TAHANAN JENIS SEMU MISE-A-LA-MASSE9024000Ke BajawaKe Ende6.84.76.18.49023500902300090225009022000Ke <strong>Mataloko</strong>Ke Were4.85.86.66.16.16.64.94.75.65.75.68.05.04.04.85.06.94.44.44.45.74.54.64.15.05.75.05.45.04.94.66.63.15.05.25.04.66.06.3 5.06.44.35.43.95.14.9 4.65.45.64.54.6MT 4.7 4 5.14.75.05.14.33.63.73.94.7 4.1 3.7 MT 4.2 62.93.84.13.23.7 4.4 3.8 2.8 3.4 4.0 3.4 3.63.13.43.5 3.3 3.12.9 3.6 2.9 3.1 3.6 4.4 4.5MT 3.0 3 2.9 4.2 5.33.06.13.2 2.97.03.53.17.2 9.2 8.5MT 53.13.93.8 3.6 3.63.53.13.43.93.64.03.03.6MT 2 4.63.33.9 2.65.12.13.93.05.24.23.13.65.4MTL3.34.11 3.13.34.0 S. B e l i 6.64.48.5 4.44.14.43.14.84.15.04.14.13.16.34.94.43.82.74.36.45.53.84.35.64.24.24.75.25.04.85.79.95.75.35.43.47.35.7Ohm-m987654324.10.5 km285500 286000 286500 287000 287500 288000


PETA KOMPILASI HASILKe BajawaKe Ende0 m 200 m 400 mWolo BeluKe <strong>Mataloko</strong>TodabeluMT 4MTMT35MT 2MTL 1MT 6Ke Were


Wolo RogeWolo PenaNWolo SasaDESA TODABELUWolo PoreWolo NawaWolo SogeWolo BeluMT 4MT 3MT 21Wolo Boba2 kmWolo HobolidaWolo PipihinaWolo KWolo TolorojoWolo Be<strong>la</strong>


UJI PRODUKSI MT5PETA SITUASI PEMBORANLAPANGAN PANAS BUMI MATALOKOKABUPATEN NGADA, NTTMT40 m 25 m 50 m 75 m 100 mBANGUNAN PLNMT6KETERANGANJa<strong>la</strong>nMT3MT5Wall padPondasi borBak pembuangan gasSumur borSaluran pipaManifestasi baruMT2MT2: 16 t/h , TKS MT3=613 5.5 kscg mMT3: 6.5-7.7 t/h, MT5=378 TKS 4.5 mkscgMT4: 1.9-2.3 t/h, MT4=756 TKS 4 kscg mfraksi air: MT2=180 0.036 t/hm


Casing design sumur MT-5 :Casing design Sumur Eksploitasi MT-5<strong>Lapangan</strong> Panas Bumi <strong>Mataloko</strong>, Kab. Ngada - Nusa Tenggara Timurlubang 17 ½” dari keda<strong>la</strong>man 0 – 56 m(sepatu selubung 13 3/8” diset dikeda<strong>la</strong>man 44.64 m)Chuck LineCel<strong>la</strong>r44.64 m56 mWell HeadKilling LineGround LevelHole 17 1/2"Casing 13 3/8"lubang 12 ¼” dari keda<strong>la</strong>man 56 - 155.48m (sepatu selubung 10 ¾” diset dikeda<strong>la</strong>man 101.95 m dan sepatuselubung 8 5/8” diset di keda<strong>la</strong>man135.54 m)96.33 m101.95 mBell Col<strong>la</strong>rCasing shoe 10 3/4 "119.76 mTop Slotted Linner 6 5/8"135.54 mCasing shoe 8 5/8"Hole 12 1/4"155.48 mZona loss (TLC)lubang 7 5/8“ dari keda<strong>la</strong>man 155.45 –345.84 m (sepatu slotted liner 6 5/8”diset di keda<strong>la</strong>man 345.84 m)282.97 mHole 7 5/8"Zona loss (TLC)Hole 7 5/8"lubang 5 5/8“ dari keda<strong>la</strong>man 345.84 –378.2 m (sepatu slotted liner dikeda<strong>la</strong>man 378 m)341 m345.84 m350.86 m378.00 m378.20 m (TD)Zona loss (TLC)Linner shoe 6 5/8"Zona loss (TLC)Slotted Liner 4"Bottom hole 5 5/8"


LAJU KURVA ALIR OUTPUT MASSA SUMUR FLUIDA EKSPLORSI VS TKS – MT-5 MT530LAJU ALIRAN [ton/jam ], ENTHALPY [100 kJ/kg252015105Fictitious Discharge Linem = - 6.11 ton/h/kscaQ1: 17.2, 18.3, 7.5, dan 9.6 ton/jamTKS 4.0, 6.0, 7.5, dan 7.0 kscgQ2: 19.3, 12.6 dan 17.4 ton/jamTKS 4.0, 6.0, dan 5.0 kscgH: 2746, 2755, 2763, 2768,dan 2771 kJ/kgTKS 4.0, 5.0, 6.0, 7.0, dan 7.500 1 2 3 4 5 6 7 8 9 10TEKANAN KEPALA SUMUR [ksca]


Hasil Analisa Kimia NCGS Sumur MT-5(Contoh PB 1 s/d PB 16 )120100Satuan dlm % mol806040200H2O2 +ArN2 CH4 CO2 SO2 H2S HCl NH3 H2OSeries1 0.006 0.006 0.069 0 0.489 0.023 0.018 0.017 0.015 99.6


Grafik Hasil Analisa Kimia SpW Sumur Eksplorasi MT-5<strong>Lapangan</strong> Panas Bumi <strong>Mataloko</strong> NTT10987Satuan (ppm)6543210Si O2 B Al 3+ Fe 3+ Ca 2+ Mg 2+ Na + K + Li + As 3+ NH4 + F - Cl - SO4 2- HCO3 - CO3 =Ser i es1 2.67 0.22 0 0.32 0.29 0.06 0.19 0.06 0 0 2.18 0 4.5 5 0 0Ser i es2 1.22 0.22 0 0.03 0.13 0.01 0.05 0.04 0 0 1.82 0 2 4 0 0Ser i es3 2.18 0 0 0.1 0.22 0.02 0.02 0.04 0 0 2 0 2 5 0 0Ser i es4 1 .45 0 0 0.14 0.18 0.02 0.05 0.09 0 0 2.55 0 4.5 5 0 0


BEBERAPA SIMPULAN• Hasil survei mise-a-<strong>la</strong>-masse memberi saran suatu zona potensialbagi target pengeboran, yang melingkupi manifestasi dan sumur-sumuryang ada dan meluas ke barat sampai sekitar 500 m dari sumur MT2-MT3-MT5.• MT-5 memproduksi uap jenuh sekitar 17 ton/jam pada TKS 5.5 kscgdengan <strong>la</strong>ju maksimum sekitar 20 ton/jam pada TKS 4.0 kscgdan entalpi tinggi sekitar 2750 kJ/kg.Total <strong>la</strong>ju alir empat sumur: 35 - 40 ton/jam pada TKS 5.5 - 4 kscg


Power HouseCooling TowerMT-4


MT-2


Grafik Hasil Analisa Kimia SCS Sumur Eksplorasi MT-5Lapanagan Panas Bumi <strong>Mataloko</strong> NTT807060Satuan (ppm)50403020100SiO2 B Al 3+ Fe 3+ Ca 2+ Mg 2+ Na + K + Li + As 3+ NH4 + F - Cl - SO4 2- HCO3 - CO3 =Ser i es 1 4.38 0.89 0 0.1 7 0.09 0.01 0.3 0.37 0 0 6.91 0.5 2 30 0 0Ser i es 2 8.62 5.06 0.09 0.41 0.08 0.01 0.72 0.25 0 0 7.27 0 1 25 0 0Ser i es 3 1 .45 4.63 0 3.68 0.41 0.06 0.09 0.08 0 0 1 3.09 0 7 75 0 0Ser i es 4 1 .09 0.78 0.09 3.61 0.89 0.25 0.27 0.09 0 0 9.82 0 2 60 0 0


Wolo RogeWolo PenaNWolo SasaDESA TODABELUWolo PoreWolo NawaWolo SogeWolo BeluMT 4MT 3MT 21Wolo Boba2 kmWolo HobolidaWolo PipihinaWolo KWolo TolorojoWolo Be<strong>la</strong>


SKEMA PENGUKURAN MISE-A-LA-MASSETransmitterArusRecorderBeda PotensialVI(C1)C2P1P2SumurdV=⎧⎜⎛ 2ρ ⎪ 1P2 C1λ + λ +⎝1⎨ ln2π⎪λ⎜⎛ 2PC1 1λ + λ +C2 1⎩ ⎝⎠2( PC ) ⎟⎞⎫1 1⎠ 1 ⎪− +2⎬( P C ) ⎟⎞PC1 2P22 ⎪ ⎭a =VKIUntuk C2 dan P2 tak terhingga:2 ln⎜λK = πλ⎜⎝⎛ 2+ +λP1C1( P1C1)2⎞⎟⎟⎠−1Kρ ⎧2P C ⎜ ⎛ λ + λ + ( PC )⎪ 1= 2πln⎝⎨⎪λPC1⎩ ⎝22 11 1 ⎟1 121⎜⎛ λ + λ +( P C )212⎞⎠−⎟⎞PC1⎠2+P C22⎫⎪⎬⎪⎭−1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!