Getting started
We’d have to live in the house while the work was going on. The back of the house had a side passage that wasn’t really doing anything, and it was crying out for a major change. We opted for a large extension across the back of the house and the passage, and another double-storey one at the side, which provided us with a proper fourth bedroom. With planning permission granted in June 2022, the builders started work. We set up a temporary kitchen in the hallway, and at one point the house had no ...