Views
1 week ago

Douibi Ylias Portfolio

Analysis : Water &

Analysis : Water & Vegetation Flood Topography Grid Water Law plan : 1:1000 Section : 1:250 Atelier Cabay - Semestre 7&8 Sitges, Catalonia, Spa Rain & Water movement Tree Vegetation area Tree density zone 1 zone 2 zone 3 zone 4 zone 5 zone 6 zone 7 zone 8 1 m line 5 m line Building Pool 2.5 m 5 m 25 m Axes x & y Aqueduct Public Space Living space Constructed wetland Flood Water low View Section 1 m 5 m Study of the site by the topography and also with a diagonal grid to coordinated the site. 13/06/14 Ostojic Victor, Yi Yunkwon, Ylias Douibi 300 m B9 B8 B11 B10 A7 A6 A5 A4 A3 A2 A1 0 A8 6.7 6.8 13.0 6.6 6.7 6.7 5.4 8.0 6.6 10.9 13.3 12.1 8.0 13.3 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 10.96 23.46 12.50 30 m 4.0 26.70 D7 D6 D5 D4 D3 D2 D1 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 C1 3.00 C2 C3 C4 3.3 18.00 15.00 15.00 7.50 7.50 C5 C6 C7 C8 0 0 B7 B6 B5 B4 B3 B2 B1 6.7 8.0 3.2 0.9 0.8 1.1 0.6 1.3 0.8 1.1 0.8 1.3 1.5 1.5 0.5 1.3 1.2 4.0 3.00 30.00 Flood S7.Atelier Mr cabbay Le temps est une notion qui ne se voit pas directement dans les documents que nous avons produit. Mais pourtant tous nos résultats sont liés à une temporalité. Nous avons étudiés l’inondation du site après des averses à l’aide de billes légères se déplaçant avec l’eau. La densité des billes est constatée à un instant T. 420 m Dans notre projet nous avons décidé de travailler sur la modification du paysage, à partir de structure telle que les murs de contentions, cela permettrait de récolter et de traiter de l’eau de pluie. Cette modification immédiate, altère la modification naturelle du site dans le temps. Les murs feront barrages à l’écoulement habituelle de l’eau et la capteront en la faisant passer dans un système de filtration naturel. Re- 17.00 4.00 Water Law Special Drawing

1 - 56% 2 - 85% 3 - 44% 4 - 1% 5 - 34% 6 - 4% 7 - 50% 8 - 10% 9 - 32% 10 - 16% 11 - 64% 12 - 75% 13 - 5% Abandoned Territories Atelier Cabay - Semestre 7&8 Sitges, Catalonia, Spa Constructed in 90’s Study of the site by the topography and also with a diagonal grid to coordinated the site. Drawing #04 20/03/14 This water park is located in Sitges, a few kilometers away from south Barcelona (Catalonia, Spain). It has been abandoned since the 90's. The park opened only for two seasons. The rumor says that a child died in the park, than the administration had to close it. Now the park is composed of five empty pools and slides without maintenance. Urban artists made many grafts on the pool's borders. There was a project by a real estate company from Barcelona to rebuild the park in 2008, but the project fell down, because of the economic crisis. Ostojic Victor, Yi Yunkwon, Ylias Douibi 1/ Beton 2/ Beton/Gravier 3/ Terre/Roche 4/ Terre 5/ Plastique 1 6/ Terre/Sable 7/ Plastique 2 8/ Herbe 9/ Terre/Plastique 10/ Herbe/Terre 11/ Piscine 12/ Dalle/Roche 13/ Gravier/Roche 1 - 56% 2 - 85% 3 - 44% 4 - 1% 5 - 34% 6 - 4% 7 - 50% 8 - 10% 9 - 32% 10 - 16% 11 - 64% 12 - 75% 13 - 5% Abandoned Territories Atelier Cabay - Semestre 7&8 Sitges, Catalonia, Spa Constructed in 90’s Study of the site by the topography and also with a diagonal grid to coordinated the site. Drawing #04 20/03/14 This water park is located in Sitges, a few kilometers away from south Barcelona (Catalonia, Spain). It has been abandoned since the 90's. The park opened only for two seasons. The rumor says that a child died in the park, than the administration had to close it. Now the park is composed of five empty pools and slides without maintenance. Urban artists made many grafts on the pool's borders. There was a project by a real estate company from Barcelona to rebuild the park in 2008, but the project fell down, because of the economic crisis. Ostojic Victor, Yi Yunkwon, Ylias Douibi 1/ Beton 2/ Beton/Gravier 3/ Terre/Roche 4/ Terre 5/ Plastique 1 6/ Terre/Sable 7/ Plastique 2 8/ Herbe 9/ Terre/Plastique 10/ Herbe/Terre 11/ Piscine 12/ Dalle/Roche 13/ Gravier/Roche Re- Water Park Site with levels’s curves Re- Water Park Site with levels’s curves

2º semestre - Año XV - aespat
Standarde internationale in domeniul Smart Grid ... - Cnr -cme
1er. semestre - Año XIII - aespat
CompliCațiile lui piCot - Diana-Florina Cosmin
SpiridonAnca_portofoliu
Atelier de instruire a Mediatorilor Sanitari Romi în ... - JSI.com
Workshop at the Danube I - 418 Gallery
Smart Grid in CFE - U.S. Commercial Service
1. INTRODUCTION From the advent of Modern Portfolio Theory (MPT)
Fuengirola Printable Streetmap as PDF
Proposal of a common Grid scheduling architecture - CoreGRID ...
治疗TKI 耐药性GIST 所面临的挑战 - Medscape
(HOR\301RIO - LAB 1 e 2 - 10 SEMESTRE DE 2008)
581.4 Design Interior - Universitatea Tehnică a Moldovei
Manual (model year: 10.0) - Opel
Departamentul Montaj de filmLector universitar poziția 5 - unatc