07.05.2016 Views

Sustainability Program

4n7ORz

4n7ORz

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Capital Projects and Campus Improvements<br />

In addition to the Lower School Solar Array, the completion of the Murray Athletic Center<br />

(LEED Gold rating) and the huge improvement in Lovett’s Diversion Rate, there were a<br />

number of other significant accomplishments which demonstrate Lovett’s commitment to<br />

operating our campus facilities in an efficient and environmentally responsible manner.<br />

Four electric vehicle charging stations were installed near the entrance to the parking deck.<br />

The charging stations can fully charge an EV battery (zero to full) in two hours. Cars in<br />

parking spaces on either side of the 4 EV chargers can reach them. In addition, four cars<br />

can be charged (though not as quickly) using regular electrical outlets in the parking deck.<br />

Faculty members who drive electric vehicles have developed a system for sharing the<br />

chargers and using them efficiently.<br />

Lovett purchased Renewable Energy Certificates from Sterling Planet to offset 25 percent<br />

(1,837,500 kWh) of the school’s electricity consumption in 2014. This is the second straight<br />

year that Lovett was the leading school in Georgia in the Green School Alliance’s<br />

Renewable Energy Purchasing Consortium.<br />

Lovett received proposals from Hannah Solar, Renevia Energy, Radiance Solar, and Inman<br />

Solar to install small scale solar power demonstration projects or larger solar arrays in<br />

a variety of locations, including the roofs of the Physical Plant, Middle School, and Glover<br />

Gymnasium. We are hoping to move ahead with more projects.<br />

Guidelines were developed which the <strong>Sustainability</strong> Advisory committee may use in<br />

expending funds that have been entrusted to it. The guidelines seek to measure the<br />

economic, environmental and education value of proposed capital projects. An updated<br />

project spreadsheet is being created and should be completed this summer.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!