FECHA Y<br />
HORA<br />
DEL<br />
EVENTO<br />
08.01.06<br />
16:29<br />
horas.<br />
SUMINISTROS<br />
AFECTADOS<br />
ELS – Alimentador<br />
O-261-Yarada.<br />
ELS – Alimentador<br />
O-262-Yarada.<br />
ELS – Alimentador<br />
O-361-Yarada.<br />
ELS – Alimentador<br />
O-362-Yarada<br />
ELS – Alimentador<br />
O-241- Tacna<br />
ELS – Alimentador<br />
O-243-Tacna<br />
ELS – Alimentador<br />
O-281-Tacna<br />
INTERRUPCIÓN<br />
POTENCIA<br />
(MW)<br />
HORA<br />
INICIO<br />
HORA<br />
FINAL<br />
<strong>INFORME</strong> <strong>TÉCNICO</strong><br />
COES-SINAC/DEV-004-2006<br />
23/01/2006<br />
TIEMPO<br />
DURACIÓN<br />
(MINUTOS)<br />
1.08 16:29 16:44 15<br />
0.92 16:29 16:43 14<br />
0.90 16:29 16:49 20<br />
0.68 16:29 16:52 23<br />
1.63 16:29 16:34 5<br />
1.90 16:29 16:36 7<br />
1.74 16:29 16:39 10<br />
IDENTIFICACIÓN<br />
TÉCNICA DE LAS<br />
EMPRESAS<br />
TRANSGRESORAS<br />
DE LA NTCSE (*)<br />
EGESUR<br />
(*) De acuerdo a lo dispuesto por el numeral 3.5 de la Norma Técnica de Calidad de los Servicios Eléctricos (NTCSE).<br />
9. RECOMENDACIONES:<br />
9.1 A EGESUR: En la C.T. Calana, analizar y corregir el problema presentado en el<br />
sistema de excitación de la unidad GD1 y la operación indebida del relé de<br />
sobrefrecuencia de la unidad GD4.<br />
San Isidro, 23 de enero de 2006.<br />
Página 6 de 6