INSTITUTO NACIONAL <strong>DE</strong> ENFERMEDA<strong>DE</strong>S RESPIRATORIAS<br />
ISMAEL COSÍO VILLEGAS<br />
Concurso de Licitacion Publica No. INER OP 12223003-001-07<br />
“Construccion de Neumopediatria 2ª Etapa”<br />
SEÑ-<br />
47<br />
PARA SU CORRECTA EJECUCION<br />
SUMINISTRO Y COLOCACION <strong>DE</strong> LETRAS A BASE <strong>DE</strong> BRONCE<br />
SEGUN MO<strong>DE</strong>LO <strong>DE</strong> DISEÑO <strong>DE</strong> 18CM <strong>DE</strong> ALTURA PARA<br />
I<strong>DE</strong>NTIFICACION <strong>DE</strong>L EDIFICIO <strong>DE</strong> ACUERDO AL TEXTO<br />
SIGUIENTE "DR. FERNANDO KATZ" INCLUYE FIJACION AL<br />
MURO <strong>DE</strong> TABIQUECON TORNILLOS Y TAQUETES EXPASIVOS, A<br />
CUALQUIER NIVEL Y DISTANCIA, EQUIPO Y HERRAMIENTA<br />
MENOR, ACARREOS Y TODO LO NECESARIO PARA SU CORRECTA<br />
EJECUCION<br />
Total <strong>DE</strong> SEÑALIZACION<br />
PZA 14.00<br />
SCI SISTEMA CONTRA INCENDIO<br />
SCI01 SUMINISTRO Y COLOCACION <strong>DE</strong> EXTINTORES, BASE PARA LOS M<br />
ISMOS , ANDAMIOS Y TODO LO NECESARIO OARA SU CORRECTA<br />
EJECUCION<br />
Total <strong>DE</strong> SISTEMA CONTRA INCENDIO<br />
IS INSTALACION SANITARIA<br />
SAN - ALBAÑAL CON TUBO <strong>DE</strong> CONCRETO <strong>DE</strong> 20 CMS. <strong>DE</strong> DIAMETRO,<br />
01 INCLUYE: EL SUMINISTRO <strong>DE</strong> LOS TUBOS <strong>DE</strong> CONCRETO, LAS<br />
PIEZAS ESPECIALES, CEMENTO, ARENA, AGUA, LA MANO <strong>DE</strong><br />
OBRA PARA EL ACARREO LIBRE HORIZONTAL Y VERTICAL, LA<br />
PREPARACION <strong>DE</strong>L FONDO PARA ASIENTO <strong>DE</strong>L TUBO EN SU<br />
ENCUADRE INFERIOR, ELABORACION Y COLOCACION <strong>DE</strong>L<br />
MORTERO EN LA UNION <strong>DE</strong> LOS TUBOS Y LAS PIEZAS<br />
ESPECIALES, ALINEACION Y NIVELACION, PRUEBAS, LA<br />
HERRAMIENTA Y EL EQUIPO NECESARIO PARA LA CORRECTA<br />
EJECUCION <strong>DE</strong> LOS TRABAJOS<br />
SAN - REGISTRO <strong>DE</strong> 1.30 X 1.20 X 2.50 M <strong>DE</strong> PROFUNDIDAD MEDIDAS<br />
02 INTERIORES, INCLUYE: SUMINISTRO <strong>DE</strong> TABIQUE, CEMENTO,<br />
GRAVA, ARENA, TUBO PARA LA MEDIA CAÑA, ACERO <strong>DE</strong><br />
REFUERZO, MARCO Y CONTRAMARCO <strong>DE</strong> 3.17 MM X 38 MM Y<br />
3.17 X 50 MM; LA MANO <strong>DE</strong> OBRA PARA EL ACARREO LIBRE<br />
HORIZONTAL Y VERTICAL, LA PREPARACION <strong>DE</strong> LA SUPERFICIE<br />
<strong>DE</strong> <strong>DE</strong>SPLANTE, ELABORACION <strong>DE</strong>L CONCRETO Y FORMACION<br />
<strong>DE</strong> LA MEDIA CAÑA, <strong>CONSTRUCCION</strong> <strong>DE</strong> LOS MUROS, APLANADO<br />
<strong>DE</strong> LAS PARE<strong>DE</strong>S INTERIORES CON MORTERO CEMENTO ARENA<br />
1:5, EMBOQUILLADO <strong>DE</strong> LAS CONEXIONES <strong>DE</strong>L TUBO <strong>DE</strong><br />
ALBAÑAL CON EL REGISTRO, COLOCACION <strong>DE</strong>L CONTRAMARCO<br />
Y LA TAPA <strong>DE</strong> 8 CMS <strong>DE</strong> ESPESOR, CON MORTERO R.N. F´C =<br />
200 KG/CM2, LIMPIEZA, LA HERRAMIENTA Y EL EQUIPO<br />
NECESARIO PARA LA CORRECTA EJECUCION <strong>DE</strong> LOS TRABAJOS<br />
SAN -<br />
03<br />
TUBERIA <strong>DE</strong> P.V.C. TIPO SANITARIO <strong>DE</strong> <strong>DE</strong> 50 MM. <strong>DE</strong><br />
DIAMETRO, INCLUYE: EL SUMINISTRO <strong>DE</strong> LOS TUBOS <strong>DE</strong> P.V.C.,<br />
LAS PIEZAS ESPECIALES, LIMPIADOR, LUBRICANTE, EMPAQUES O<br />
CEMENTO <strong>DE</strong> CONTACTO SEGÙN SEA EL CASO, AGUA PARA<br />
PRUEBAS; LA MANO <strong>DE</strong> OBRA PARA PRUEBAS, LA MANO <strong>DE</strong> OBRA<br />
PARA EL ACARREO LIBRE HORIZONTAL Y VERTICAL, LA<br />
PRESENTACION, LA UNION <strong>DE</strong> LOS TUBOS Y LAS PIEZAS<br />
ESPECIALES, PRUEBAS, LIMPIEZA, LA HERRAMIENTA Y EL<br />
PZA 15.00<br />
ML 15.00<br />
PZA 1.00<br />
ML 30.00<br />
122