INSTITUTO NACIONAL <strong>DE</strong> ENFERMEDA<strong>DE</strong>S RESPIRATORIAS<br />

ISMAEL COSÍO VILLEGAS<br />

Concurso de Licitacion Publica No. INER OP 12223003-001-07<br />

“Construccion de Neumopediatria 2ª Etapa”<br />

SEÑ-<br />

47<br />

PARA SU CORRECTA EJECUCION<br />

SUMINISTRO Y COLOCACION <strong>DE</strong> LETRAS A BASE <strong>DE</strong> BRONCE<br />

SEGUN MO<strong>DE</strong>LO <strong>DE</strong> DISEÑO <strong>DE</strong> 18CM <strong>DE</strong> ALTURA PARA<br />

I<strong>DE</strong>NTIFICACION <strong>DE</strong>L EDIFICIO <strong>DE</strong> ACUERDO AL TEXTO<br />

SIGUIENTE "DR. FERNANDO KATZ" INCLUYE FIJACION AL<br />

MURO <strong>DE</strong> TABIQUECON TORNILLOS Y TAQUETES EXPASIVOS, A<br />

CUALQUIER NIVEL Y DISTANCIA, EQUIPO Y HERRAMIENTA<br />

MENOR, ACARREOS Y TODO LO NECESARIO PARA SU CORRECTA<br />

EJECUCION<br />

Total <strong>DE</strong> SEÑALIZACION<br />

PZA 14.00<br />

SCI SISTEMA CONTRA INCENDIO<br />

SCI01 SUMINISTRO Y COLOCACION <strong>DE</strong> EXTINTORES, BASE PARA LOS M<br />

ISMOS , ANDAMIOS Y TODO LO NECESARIO OARA SU CORRECTA<br />

EJECUCION<br />

Total <strong>DE</strong> SISTEMA CONTRA INCENDIO<br />

IS INSTALACION SANITARIA<br />

SAN - ALBAÑAL CON TUBO <strong>DE</strong> CONCRETO <strong>DE</strong> 20 CMS. <strong>DE</strong> DIAMETRO,<br />

01 INCLUYE: EL SUMINISTRO <strong>DE</strong> LOS TUBOS <strong>DE</strong> CONCRETO, LAS<br />

PIEZAS ESPECIALES, CEMENTO, ARENA, AGUA, LA MANO <strong>DE</strong><br />

OBRA PARA EL ACARREO LIBRE HORIZONTAL Y VERTICAL, LA<br />

PREPARACION <strong>DE</strong>L FONDO PARA ASIENTO <strong>DE</strong>L TUBO EN SU<br />

ENCUADRE INFERIOR, ELABORACION Y COLOCACION <strong>DE</strong>L<br />

MORTERO EN LA UNION <strong>DE</strong> LOS TUBOS Y LAS PIEZAS<br />

ESPECIALES, ALINEACION Y NIVELACION, PRUEBAS, LA<br />

HERRAMIENTA Y EL EQUIPO NECESARIO PARA LA CORRECTA<br />

EJECUCION <strong>DE</strong> LOS TRABAJOS<br />

SAN - REGISTRO <strong>DE</strong> 1.30 X 1.20 X 2.50 M <strong>DE</strong> PROFUNDIDAD MEDIDAS<br />

02 INTERIORES, INCLUYE: SUMINISTRO <strong>DE</strong> TABIQUE, CEMENTO,<br />

GRAVA, ARENA, TUBO PARA LA MEDIA CAÑA, ACERO <strong>DE</strong><br />

REFUERZO, MARCO Y CONTRAMARCO <strong>DE</strong> 3.17 MM X 38 MM Y<br />

3.17 X 50 MM; LA MANO <strong>DE</strong> OBRA PARA EL ACARREO LIBRE<br />

HORIZONTAL Y VERTICAL, LA PREPARACION <strong>DE</strong> LA SUPERFICIE<br />

<strong>DE</strong> <strong>DE</strong>SPLANTE, ELABORACION <strong>DE</strong>L CONCRETO Y FORMACION<br />

<strong>DE</strong> LA MEDIA CAÑA, <strong>CONSTRUCCION</strong> <strong>DE</strong> LOS MUROS, APLANADO<br />

<strong>DE</strong> LAS PARE<strong>DE</strong>S INTERIORES CON MORTERO CEMENTO ARENA<br />

1:5, EMBOQUILLADO <strong>DE</strong> LAS CONEXIONES <strong>DE</strong>L TUBO <strong>DE</strong><br />

ALBAÑAL CON EL REGISTRO, COLOCACION <strong>DE</strong>L CONTRAMARCO<br />

Y LA TAPA <strong>DE</strong> 8 CMS <strong>DE</strong> ESPESOR, CON MORTERO R.N. F´C =<br />

200 KG/CM2, LIMPIEZA, LA HERRAMIENTA Y EL EQUIPO<br />

NECESARIO PARA LA CORRECTA EJECUCION <strong>DE</strong> LOS TRABAJOS<br />

SAN -<br />

03<br />

TUBERIA <strong>DE</strong> P.V.C. TIPO SANITARIO <strong>DE</strong> <strong>DE</strong> 50 MM. <strong>DE</strong><br />

DIAMETRO, INCLUYE: EL SUMINISTRO <strong>DE</strong> LOS TUBOS <strong>DE</strong> P.V.C.,<br />

LAS PIEZAS ESPECIALES, LIMPIADOR, LUBRICANTE, EMPAQUES O<br />

CEMENTO <strong>DE</strong> CONTACTO SEGÙN SEA EL CASO, AGUA PARA<br />

PRUEBAS; LA MANO <strong>DE</strong> OBRA PARA PRUEBAS, LA MANO <strong>DE</strong> OBRA<br />

PARA EL ACARREO LIBRE HORIZONTAL Y VERTICAL, LA<br />

PRESENTACION, LA UNION <strong>DE</strong> LOS TUBOS Y LAS PIEZAS<br />

ESPECIALES, PRUEBAS, LIMPIEZA, LA HERRAMIENTA Y EL<br />

PZA 15.00<br />

ML 15.00<br />

PZA 1.00<br />

ML 30.00<br />

122