02.01.2014 Views

GRAUPNER GmbH & Co. KG D-73230 KIRCHHEIM/TECK GERMANY

GRAUPNER GmbH & Co. KG D-73230 KIRCHHEIM/TECK GERMANY

GRAUPNER GmbH & Co. KG D-73230 KIRCHHEIM/TECK GERMANY

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• <strong>Co</strong>nnect the parallel battery lead, Order No. 3061,<br />

to the speed controller. Place the batteries in the<br />

model, connect them to the parallel lead and<br />

check the working systems. The batteries must be<br />

fixed securely, so that they cannot slip out of<br />

position when the boat is running. It is a good idea<br />

to attach a piece of Velcro tape to each of the<br />

batteries and the deck; this will prevent them<br />

shifting.<br />

• Replace the hatch cover and the superstructure<br />

on the model and carefully connect the funnel<br />

rigging again. NOTE: take care not to trap the<br />

rigging under the superstructure (see photo). TIP:<br />

it is easiest to fit the rigging using a pair of<br />

tweezers.<br />

• Suspend the ship’s boats in the davits, as shown<br />

in the photos. TIP: once the boats are in place,<br />

squeeze the hooks together gently so that they<br />

cannot fall off when the boat is running.<br />

<strong>GRAUPNER</strong> <strong>GmbH</strong> & <strong>Co</strong>. <strong>KG</strong> D-<strong>73230</strong> <strong>KIRCHHEIM</strong>/<strong>TECK</strong> <strong>GERMANY</strong><br />

16<br />

Keine Haftung für Druckfehler. Technische Änderungen vorbehalten! Liability for printing errors excluded. We reserve the right to introduce modifications. Sous réserve de<br />

modifications! Nous ne sommes pas responsables d’éventuelles erreurs d’impression! #0058124 12/2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!