03.06.2013 Views

Planificarea si dimensionarea unei instalatii de biogaz - Ziua Energiei

Planificarea si dimensionarea unei instalatii de biogaz - Ziua Energiei

Planificarea si dimensionarea unei instalatii de biogaz - Ziua Energiei

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Acoperire energie<br />

electrica<br />

1.600 MWh/an<br />

BGA 280 kW:<br />

• Deseuri abator: 800 to<br />

• Dejectii bovine: 2.500 to<br />

• Porumb <strong>si</strong>loz: 3.900 to<br />

• 1.900 MWh el / an<br />

• 2.100 MWh th / an<br />

<strong>Ziua</strong> <strong>Energiei</strong>, editia a II-a, Brasov, 09.06.2009 Gerrit Meiners<br />

Acoperire energie<br />

termica<br />

5.500 MWh/an<br />

BGA 624 kW:<br />

• Deseuri abator: 800 to<br />

• Dejectii bovine: 3.500 to<br />

• Porumb <strong>si</strong>loz: 9.700 to<br />

• 4.400 MWh el / an<br />

• 5.000 MWh th / an<br />

Mix energie electrica <strong>si</strong><br />

termica<br />

BGA 624 / 452 kW:<br />

• Deseuri abator: 800 to<br />

• Dejectii bovine: 3.500 to<br />

• Porumb <strong>si</strong>loz: 6.700 to<br />

• 3.200 MWh el / an<br />

• 3.300 MWh th / an<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!