REFURBISHMENT FOR HYDRO POWER PLANTS

Refurbisment projects can be comprise of, Turbine and Hydromechanics, generator

equipment, EBOP, regulator and unit control equipment.

When You Should consider Refurbishment?

• Increases in operational and maintenance costs,

• Depending on the usage/damage of the equipment decreases in efficiency and nominal

power value,

• Hardware deficiency, which leads to unexpected stanstills & production loses.

• Partial or permanent breakdowns

Since 1936 and now a days with our experience and knowledge with design, manufacturing

and field implementations that makes a big difference, also our company continuing its

powerful growed world wide with a competent, well experienced, flexible experienced team

from Germany as well as from Turkey. For refurbishment projects, we as Kochendörfer play

a leading role with our experienced team in the matters detailed below.