16.10.2013 Views

Gamesa comunica que consolida su presencia en Japón con la ...

Gamesa comunica que consolida su presencia en Japón con la ...

Gamesa comunica que consolida su presencia en Japón con la ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRESS RELEASE<br />

<strong>Gamesa</strong> Eólica is to <strong>su</strong>pply 31 <strong>Gamesa</strong> G80-2.0 MW model wind<br />

turbines<br />

GAMESA CONSOLIDATES ITS PRESENCE IN JAPAN<br />

WITH THE INSTALLATION OF A FURTHER 62 MW OF WIND<br />

POWER<br />

Vitoria – Gasteiz, Spain, 21 March 2005. <strong>Gamesa</strong> Eólica, ranking se<strong>con</strong>d in the<br />

world for the manufacture of wind turbines and leader in Spain in the sector of<br />

manufacture, sale and instal<strong>la</strong>tion of wind turbines, has <strong>su</strong>bscribed two new <strong>con</strong>tracts<br />

with the Japanese company EURUS ENERGY for <strong>su</strong>pplying Japan with 31 <strong>Gamesa</strong><br />

G80-2.0 MW model wind turbines, implying the instal<strong>la</strong>tion of a total output of 62 MW.<br />

Of the total number of wind turbines <strong>con</strong>tracted, 25 are to be located in the Noheji wind<br />

farm, in Kamikita-Gun, Aomori, whereas the remaining 6 will be s<strong>en</strong>t to the Shit<strong>su</strong>kari<br />

wind farm, in Shimokita-gun, Aomori. Work on the assembly of both wind farms is<br />

expected to start in the se<strong>con</strong>d quarter of 2006.<br />

These <strong>con</strong>tracts, worth nearly 43 million euro, include delivery of the wind turbines,<br />

their instal<strong>la</strong>tion and commissioning as well as work re<strong>la</strong>ted to operation and<br />

maint<strong>en</strong>ance.<br />

The signing of these <strong>con</strong>tracts signifies the <strong><strong>con</strong>solida</strong>tion of <strong>Gamesa</strong> Eólica in Japan,<br />

a country in which the company has to date be<strong>en</strong> awarded <strong>con</strong>tracts for the instal<strong>la</strong>tion<br />

of 82 MW and where prospects for the 2005-2009 period indicate a further 1,500 MW<br />

of wind <strong>en</strong>ergy.<br />

From the point of view of the <strong>en</strong>vironm<strong>en</strong>t, the wind turbines that <strong>Gamesa</strong> Eólica is to<br />

<strong>su</strong>pply for the Noheji and Shit<strong>su</strong>kari wind farms will help g<strong>en</strong>erate an <strong>en</strong>vironm<strong>en</strong>tfri<strong>en</strong>dly<br />

<strong>en</strong>ergy <strong>su</strong>pply as they will prev<strong>en</strong>t the emission of <strong>con</strong>taminating <strong>su</strong>bstances<br />

into the atmosphere. In fact, the annual production of the <strong>con</strong>tracted 62 MW will<br />

rep<strong>la</strong>ce 13,328 Tons of Oil Equival<strong>en</strong>t (TEP)/year and prev<strong>en</strong>t the emission of<br />

137,1682 tons of CO2/year into the atmosphere.<br />

21/03/05 Page 1 of 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!