04.07.2015 Views

plaza paver - Pavestone

plaza paver - Pavestone

plaza paver - Pavestone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Retaing Wall Installaton<br />

RETAINING WALLS<br />

PAREDES DE CONTENCIóN<br />

STEP 1: Site Preparation and<br />

Excavation.<br />

Stake out the area where the<br />

wall will be installed. Dig a<br />

trench 12" wide and 4" deep.<br />

STEP 2: Base Preparation.<br />

Tamp soil in trench to create a<br />

ridged surface. Add 1" of<br />

leveling sand to the bottom of<br />

the trench.<br />

STEP 3: Leveling and Laying<br />

Stones.<br />

Lay stones side by side and<br />

check for level. Stack additional<br />

courses with the bond staggered<br />

on the course below.<br />

STEP 4: Use a hammer and a<br />

mason’s chisel to score the<br />

stone on all sides except the<br />

face.<br />

Pound the chisel on the score<br />

line until it breaks.<br />

PASO 1: Preparación del sitio y<br />

excavación.<br />

Retira las estacas del área<br />

donde instalarás la pared. Cava<br />

una zanja de 12" de ancho y 4"<br />

de profundidad.<br />

PASO 2: Preparación de la base.<br />

Apisona el suelo en la zanja<br />

para formar surcos en la<br />

superficie. Coloca 1" de arena<br />

para nivelar en el área debajo de<br />

la zanja.<br />

PASO 3: Nivelación y colocación<br />

de piedras.<br />

Coloca las piedras una al<br />

lado de la otra y revisa que<br />

estén niveladas. Apila hileras<br />

adicionales con la unión escalonada<br />

sobre la hilera de abajo.<br />

PASO 4: Usa un martillo y un<br />

cincel de albañil para estriar<br />

la piedra en todos los lados,<br />

excepto el frente.<br />

Martilla el cincel sobre la línea<br />

de la estría hasta que se parta.<br />

Attention: The installation<br />

instructions shown are not<br />

comprehensive. Please consult<br />

your retailer for complete<br />

excavating, base preparation,<br />

and installation directions to<br />

meet your specific<br />

requirements. Be sure to use all<br />

safety equipment required.<br />

Detailed<br />

Instructions<br />

Available Online:<br />

www.pavestone.com<br />

Tools for Installing Retaining Walls<br />

RETAINING WALLS<br />

❑ Shovel & Spade<br />

❑ String Line<br />

❑ Paver Edge Restraint<br />

❑ Landscape Spikes<br />

❑ Gloves & Safety Glasses<br />

❑ Hand Tamper<br />

❑ Paver Sand<br />

❑ Carpenters Level<br />

❑ Tape Measure<br />

SCAN NOW FOR “HOW<br />

TO” VIDEOS ON WALLS<br />

INSTALLATION<br />

SCANEE PARA VER VIDEOS SOBRE<br />

COMO INSTALAR MUROS DE CON-<br />

TENCIóN<br />

Atención: Las instrucciones de<br />

instalación incluidas no son<br />

exhaustivas. Consulta a tu minorista<br />

sobre las instrucciones completas<br />

para excavación, preparación de la<br />

base e instalación, para satisfacer<br />

tus necesidades específicas.<br />

Asegúrate de usar todo el equipo<br />

de seguridad requerido.<br />

Instrucciones<br />

detalladas<br />

Disponible en Línea:<br />

www.pavestone.com<br />

Herramientas para la Instalación de Paredes<br />

P A R E D E S D E<br />

C O N T E N C I ó N<br />

❑ Pala y azadar<br />

❑ Cordel para marcar<br />

❑ Sujetadores para bordes de adoquines<br />

❑ Clavos para jardinería<br />

❑ Guantes y gafas de seguridad<br />

❑ Hand Tamper<br />

❑ Paver Sand<br />

❑ Apisonadora manual<br />

❑ Nivel de carpintero<br />

28 www.pavestone.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!