ESTIMATE

bill

La Grange park

PAYNE'S CONSTRUCTION INC

Po Box 555

Yorkville, Il 60560

Phone: (630) 608-9688

Email: paynesconstructioninc@gmail.com

Estimate # 001558

Date 06/13/2018

Description

Total

demo $775.00

demo kitchen, remove wall between kitchen and dining room.

Framing $425.00

frame half walls to separate kitchen from dining room.

plumbing $1,100.00

install new shutoffs for kitchen sink and dishwasher, new 1/2 horsepower disposal installed , new

2" drain brought up to code.

electrical $1,800.00

new kitchen pull, add outlets to bring kitchen up to code, 4 new can lights in kitchen area.

drywall $550.00

fix all drywall removed , new drywall on half walls patch and repair.

flooring $350.00

patch in floor where missing , stain to match floor color as close as possible

cabinets $5,919.00

New ALINE cabinet install, install and supply 30" kitchen cabs upper and lower, pulls and handles

will be supplied .SOFFIT WILL REMAIN AND CABINETS WILL BUTT TO SOFFIT.

granite $1,800.00

40sf grainte counter tops, with tile back splash .

paint $1,100.00

paint entire first floor and second floor hallway , 2tone , ceiling and walls x2 coats of paint ,

contractor will supply paint of owners color pick, paint will be sherwin Williams promar 200 grade.

Page 1 of 3


Subtotal $13,819.00

Total $13,819.00

Notes:

This contract is for work to be performed in a timely manner and will be done with permits and

city inspections, Paynes Inc will offer 2 Year on workmanship , All material listed above will be

supplied by contractor and color sample can be provided to homeowner to choose.This contract

will be billed in x4 payment , deposit is required for work to be started on home, those payments

will be $3,454.75 for start of job and demo, 2nd payment will be to purchase cabinets, 3rd

payment will be after drywall and cabinets are hung, final payment will be when work is

complete to satisfaction and signed off. (This payment agreement is for this contract and items

listed only all other work that is added is to be paid in full as an extra item ).

Page 2 of 3


By signing this document, the customer agrees to the services and conditions outlined in this

document.

Tyrell Payne

bill

Page 3 of 3