<strong>KATEGORI</strong> <strong>KONSTRUKSI</strong><br />
No. JENIS SPESIFIKASI SATUAN<br />
HARGA<br />
(RUPIAH)<br />
23 Peralatan Mobil Operasional Hari 325,033<br />
24 Peralatan Mobil Pick Up Hari 200,020<br />
25 Peralatan Mulsa Karung 10,390<br />
26 Peralatan Oli Liter 41,182<br />
27 Peralatan Pasir M3 74,657<br />
28 Peralatan pH Meter Hari 1,506<br />
29 Peralatan Selang Penyiraman Hari 2,510<br />
30 Peralatan Selang Penyiraman Hari 6,626<br />
31 Peralatan Top Soil M3 3,111<br />
32 Upah Kenek HOK 26,050<br />
33 Upah Mandor HOK 60,262<br />
34 Upah Pengawas HOK 60,053<br />
35 Upah Sopir HOK 29,771<br />
36 Upah Tukang Gali Lubang Tanam HOK 34,981<br />
37 Upah Tukang Gali Lubang Tanam HOK 26,050<br />
38 Upah Tukang Penyiapan Media Tanam HOK 26,050<br />
39 Upah Tukang Penyiraman HOK 26,050<br />
40 Upah Tukang Tanam HOK 37,214<br />
41 Upah Mandor HOK 55,240<br />
42 Upah Tukang Penyiraman HOK 26,050<br />
F. MATERIAL ALAT TAMAN<br />
No. JENIS SPESIFIKASI SATUAN<br />
HARGA<br />
(RUPIAH)<br />
1 Material Alat Taman Truk 4 ton hari 1,000,100<br />
2 Material Alat Taman Truk 6 ton hari 1,500,150<br />
3 Material Alat Taman Genset jam 20,286<br />
4 Material Alat Taman<br />
Mobil Tangki Air Kapasitas<br />
5000liter<br />
jam 62,506<br />
5 Material Alat Taman Mobil Pick Up jam 200,020<br />
6 Material Alat Taman Mobil Operasional jam 325,033<br />
7 Material Alat Taman Molen (Soil Mix) jam 31,375<br />
8 Material Alat Taman Mesin Potong Rumput jam 12,550<br />
9 Material Alat Taman Knapsack Sprayer jam 6,275<br />
10 Material Alat Taman Handsprayer jam 3,765<br />
11 Material Alat Taman Gelas Ukur hari 748<br />
12 Material Alat Taman Ember hari 753<br />
13 Material Alat Taman Toren Kapasitas 1000 liter hari 11,546<br />
14 Material Alat Taman pH Meter hari 1,495<br />
15 Material Alat Taman Gunting Pangkas/Stek hari 1,506<br />
16 Material Alat Taman Selang Penyiraman hari 6,626<br />
17 Material Alat Taman Mesin Pompa Air hari 11,044<br />
18 Material Alat Taman Cangkul hari 1,004<br />
19 Material Alat Taman Garpu hari 753<br />
20 Material Alat Taman Linggis/Blencong hari 1,004<br />
21 Material Alat Taman Tekel jam 8,032<br />
22 Material Alat Taman Mobil Cren jam 150,600<br />
Harga diatas adalah harga sebelum Kenaikan BBM. Jika BBM mengalami kenaikan 30%, maka harga diatas akan naik 6-8%<br />
336 Buku Standar Belanja Barang dan Jasa UNPAD Tahun 2012ii