01.03.2015 Views

KATEGORI KONSTRUKSI - Procurement

KATEGORI KONSTRUKSI - Procurement

KATEGORI KONSTRUKSI - Procurement

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6<br />

<strong>KATEGORI</strong> <strong>KONSTRUKSI</strong><br />

No. JENIS SPESIFIKASI SATUAN<br />

HARGA<br />

(RUPIAH)<br />

23 Peralatan Mobil Operasional Hari 325,033<br />

24 Peralatan Mobil Pick Up Hari 200,020<br />

25 Peralatan Mulsa Karung 10,390<br />

26 Peralatan Oli Liter 41,182<br />

27 Peralatan Pasir M3 74,657<br />

28 Peralatan pH Meter Hari 1,506<br />

29 Peralatan Selang Penyiraman Hari 2,510<br />

30 Peralatan Selang Penyiraman Hari 6,626<br />

31 Peralatan Top Soil M3 3,111<br />

32 Upah Kenek HOK 26,050<br />

33 Upah Mandor HOK 60,262<br />

34 Upah Pengawas HOK 60,053<br />

35 Upah Sopir HOK 29,771<br />

36 Upah Tukang Gali Lubang Tanam HOK 34,981<br />

37 Upah Tukang Gali Lubang Tanam HOK 26,050<br />

38 Upah Tukang Penyiapan Media Tanam HOK 26,050<br />

39 Upah Tukang Penyiraman HOK 26,050<br />

40 Upah Tukang Tanam HOK 37,214<br />

41 Upah Mandor HOK 55,240<br />

42 Upah Tukang Penyiraman HOK 26,050<br />

F. MATERIAL ALAT TAMAN<br />

No. JENIS SPESIFIKASI SATUAN<br />

HARGA<br />

(RUPIAH)<br />

1 Material Alat Taman Truk 4 ton hari 1,000,100<br />

2 Material Alat Taman Truk 6 ton hari 1,500,150<br />

3 Material Alat Taman Genset jam 20,286<br />

4 Material Alat Taman<br />

Mobil Tangki Air Kapasitas<br />

5000liter<br />

jam 62,506<br />

5 Material Alat Taman Mobil Pick Up jam 200,020<br />

6 Material Alat Taman Mobil Operasional jam 325,033<br />

7 Material Alat Taman Molen (Soil Mix) jam 31,375<br />

8 Material Alat Taman Mesin Potong Rumput jam 12,550<br />

9 Material Alat Taman Knapsack Sprayer jam 6,275<br />

10 Material Alat Taman Handsprayer jam 3,765<br />

11 Material Alat Taman Gelas Ukur hari 748<br />

12 Material Alat Taman Ember hari 753<br />

13 Material Alat Taman Toren Kapasitas 1000 liter hari 11,546<br />

14 Material Alat Taman pH Meter hari 1,495<br />

15 Material Alat Taman Gunting Pangkas/Stek hari 1,506<br />

16 Material Alat Taman Selang Penyiraman hari 6,626<br />

17 Material Alat Taman Mesin Pompa Air hari 11,044<br />

18 Material Alat Taman Cangkul hari 1,004<br />

19 Material Alat Taman Garpu hari 753<br />

20 Material Alat Taman Linggis/Blencong hari 1,004<br />

21 Material Alat Taman Tekel jam 8,032<br />

22 Material Alat Taman Mobil Cren jam 150,600<br />

Harga diatas adalah harga sebelum Kenaikan BBM. Jika BBM mengalami kenaikan 30%, maka harga diatas akan naik 6-8%<br />

336 Buku Standar Belanja Barang dan Jasa UNPAD Tahun 2012ii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!