ESDM untuk Kesejahteraan Rakyat
ESDM untuk Kesejahteraan Rakyat
ESDM untuk Kesejahteraan Rakyat
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Prakiraan Kondisi Sistem Kelistrikan 10 TahunKe Depan14.6%4,77776.5%4,6623.7%18,5969,6413.6%0.8%14.6%14.6%0.3%76.5%76.5%20,3320.5%3.7%14.6%3.7%19,7393.6%76.5%47,6811,1613.6%38,7421,1340.8%14.6%3.7%0.8%3,3550.3%76.5%3.6%2,7180.3%0.5%3.7%0.8%14.6%0.5%3323.6%0.3%76.5%3311,3400.8%0.5%2,0513.7%1,1567670.3%4,4633.6%14.6%2,9920.5%0.8%76.5%0.3%3.7%1330.5%3.6%1055910.8%2730.3%0.5%184156563533LEGEND:: Daya Mampu (MW): Beban Puncak (MW): Konsumsi Listrik2012 2020Sum JB Kal Sul Nusra Mal Pap2012 2020Sum JB Kal Sul Nusra Mal Pap2012 2020Sum JB Kal Sul Nusra Mal Pap2012 2020 2012 2020Sum JB Kal Sul Nusra Mal PapSum JB Kal Sul Nusra Mal Pap2012 2020Berdasarkan RUPTL PLN 2011-2020, pertumbuhan kebutuhan tenaga listrik diproyeksikansekitar 8.46% pertahun.Dalam rangka <strong>untuk</strong> memenuhi kebutuhan tenaga listrik dan mendukung MP3EI,direncanakan penambahan kapasitas pembangkit sebesar 55.795 MW hingga tahun 2020atau rata-rata 5.580 MW pertahun.<strong>ESDM</strong> <strong>untuk</strong> <strong>Kesejahteraan</strong> <strong>Rakyat</strong>2012 2020Sum JB Kal Sul Nusra Mal PapSum JB Kal Sul Nusra Mal PapSumber : RUPTL PLN 2011-2020 dan Statistik PLN 2011