12.07.2015 Views

ESDM untuk Kesejahteraan Rakyat

ESDM untuk Kesejahteraan Rakyat

ESDM untuk Kesejahteraan Rakyat

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PETA LOKASI PROGRAM PERCEPATAN 10.000 MW TAHAP ISUMATERA 10 PROYEK (1.431 MW)12INDONESIA BARAT(10 proyek: 1566 MW)TOTAL KAPASITAS:9.877 MW (33 Proyek)INDONESIA TIMUR(13 Proyek: 821 MW)1.PLTU NAD – Meulaboh (2x110 MW)2.PLTU SUMUT – Pangkalansusu (2x220 MW)3.PLTU SUMBAR – Teluk Sirih (2x112 MW)4.PLTU 1 RIAU - Bengkalis (2x10 MW) **)5.PLTU 2 RIAU – Selat Panjang (2x7 MW) *)6.PLTU KEP. RIAU -Tj. Balai Karimun (2x7 MW)7.PLTU RIAU - Tenayan (2x110 MW)8.PLTU 3 BANGKA – Bangka Baru (2x30 MW)9.PLTU 4 BANGKA – Belitung (2x16,5 MW10.PLTU LAMPUNG – Tj. Selaki (2x100 MW)JAWA-BALI 10 PROYEK (7.490 MW)11.PLTU 1 BANTEN – Suralaya (1x625 MW)12.PLTU 2 BANTEN - Labuan (2x300 MW)13.PLTU 3 BANTEN - Lontar (3x315 MW)14.PLTU 1 JABAR - Indramayu (3x330 MW)15.PLTU 2 JABAR – Pelabuhan Ratu (2x350 MW)16.PLTU 1 JATENG – Rembang (2x315 MW)17.PLTU 2 JATENG – Cilacap Baru (1x660 MW)18.PLTU 1JATIM – Pacitan (2x315 MW)19.PLTU 2 JATIM - Paiton (1x 660 MW)20. PLTU 3JATIM – Tj. Awar Awar (2x350 MW)34576252629313034NUSA TENGGARA 4 PROYEK (117 MW)21.PLTU 1 NTB – Bima (2x10 MW)22.PLTU 2 NTB – Lombok (2x25 MW)23.PLTU 1 NTT – Ende (2x7 MW)24.PLTU 2 NTT – Kupang (2x16,5 MW)KALIMANTAN 5 PROYEK (625 MW)811101391416202728333235363725.PLTU 1 KALBAR – Parit Baru (2x50 MW)26.PLTU 2 KALBAR – Bengkayan (2x27,5 MW)27.PLTU 1 KALTENG – Pulang Pisau (2x60 MW)28.PLTU 1 KALSEL – Asam Asam (2x65 MW)29.PLTU KALTIM – Tl. Balikpapan (2x110 MW)SULAWESI 4 PROYEK (220 MW)30.PLTU SULUT – Amurang (2x25 MW)31.PLTU GORONTALO – Anggrek (2x25 MW) *)32.PLTU SULTRA– Kendari (2x10 MW)33.PLTU SULSEL – Barru (2x50 MW)JAWA-BALI(10 Proyek:7490 MW)121517181922 212324Ket : *) Proyek diterminasi**)Dalam proses terminasiMALUKU 2 PROYEK (44 MW)34.PLTU MALUT - Tidore (2x7 MW)35.PLTU MALUKU – Ambon (2x15 MW)PAPUA 2 PROYEK (34 MW)36.PLTU 1 PAPUA - Timika (2x7 MW) **)37.PLTU 2 PAPUA – Jayapura (2x10 MW)<strong>ESDM</strong> <strong>untuk</strong> <strong>Kesejahteraan</strong> <strong>Rakyat</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!