Del No 42 Detailed engineering of energy ... - Concerto-staccato
Del No 42 Detailed engineering of energy ... - Concerto-staccato
Del No 42 Detailed engineering of energy ... - Concerto-staccato
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Integrated project<br />
<strong>Concerto</strong><br />
FP6-038441<br />
STACCATO<br />
Sustainable Technologies And Combined<br />
Community Approaches Take Off<br />
<strong>Del</strong>. <strong>No</strong>. <strong>42</strong> – <strong>Detailed</strong> <strong>engineering</strong> <strong>of</strong> <strong>energy</strong> supply and<br />
sustainable <strong>energy</strong> measures<br />
Due date <strong>of</strong> deliverable: December 2008<br />
Actual submission date: December 2008<br />
Start date <strong>of</strong> project: 8 <strong>No</strong>vember 2007 Duration: 60 Months<br />
Organisation name <strong>of</strong> lead contractor for this deliverable: Ymere<br />
Revision: Definitive<br />
Project co-funded by the European Commission within the Sixth Framework Programme (2002-<br />
2006)<br />
Dissemination Level<br />
PU Public<br />
PP Restricted to other programme participants (including the Commission Services) X<br />
RE Restricted to a group specified by the consortium (including the Commission Services)<br />
CO Confidential, only for members <strong>of</strong> the consortium (including the Commission Services)
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
1 vkz Model bankgarantie is niet in ons bezit.<br />
1 cie / Overzicht van bouwkundige werkzaamheden is niet in ons<br />
schreuder bezit.<br />
2 2.2 cie Leveren en aanbrengen dakbedekking, dit geldt toch alleen<br />
maar voor de nieuwe trappenhuizen?<br />
4 00.03.19 cie / Hier wordt omschreven dat de derden zelf sparingen maken en<br />
schreuder dichten ed.; Echter op blz.30 staat dat de aannemer gaten moet<br />
maken t.b.v. de installateurs.;Wat moet er nu aangehouden<br />
worden?. ;Indien wij sparingen moeten maken t.b.v. derden,<br />
dan graag volgens blz. 30 een opgave hiervan.<br />
8 01.02.06.98 cie Valt buiten bestek is niet van toepassing<br />
8 01.02.08.07 cie Niet van toepassing<br />
9 01.02.10 cie Valt buiten bestek is niet van toepassing<br />
11 01.02.22 cie Dienen wij ook garantie afgeven voor die onderdelen die door<br />
derden uitgevoerd worden?<br />
11 01.02.22 cie Garanties werkzaamheden derden uit het bestek halen<br />
14 cie Bovenste aandachtstreep granito is niet van toepassing<br />
14 cie 2e aandachtstreep ventilatie is niet van toepassing<br />
17 01.02.40 vkz Bankgarantie ter waarde van 10% van de aanneemsom<br />
opnemen, echter in H.01.02.43 staat € 1.5000.000,= opnemen.<br />
Wat aanhouden?<br />
17 01.03.10 vkz Car verzekering alleen voor werkzeemheden volgens bestek <strong>of</strong><br />
inclusief nevenaannemers, indien nevenaannemers ook mee<br />
verzekeren graag een raming van de kosten<br />
21 05 vkz Er staan geen keten omschreven houd dit in dat er geen keet<br />
voor de direktie hoeft te komen?<br />
23 05.<strong>42</strong>.91-a cie Tijdelijke noodverlichting moet de wij dit menemen <strong>of</strong> hoort dit<br />
bij het elektra bestek<br />
24 10 vkz Moet het asbest ook door de aannemer verwijderd worden?<br />
25 10.32 cie Wie verwijderd de bestaande vloerafwerking?<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 1 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
26 10.32.21-b cie Wat moet er nu gezaagd en <strong>of</strong> uitgehakt worden bij de arcade<br />
van de WIBO woningen?; Op tekening is hier niet van te zien?<br />
27 10 cie Wordt t.p.v. de kopgevel het gehele metselwerk en betonband<br />
gesloopt <strong>of</strong> alleen t.p.v. het nieuwe trappenhuis?<br />
27 10.32.22-a 01 cie Slopen binnenwand. Welke binnenwanden worden hier<br />
bedoeld?<br />
27 10.32.30.k cie Om hoeveel roosters per woning gaat dit? Dit is namelijk alleen<br />
op de doorsnedes te zien.<br />
27 10.32.30-b cie Worden bij het verwijderen van de plafonds het achterhout<br />
/plafondhangers ook verwijderd?<br />
28 10.32.30.k cie Er zijn een aantal gevels met suskasten. Hoeveel woningen<br />
krijgen deze suskasten?<br />
29 10.32.45-a cie Waar komt cementdekvloer herstel voor?<br />
29 10.39.10-a cie Bij het reinigen en stralen van het bestaande metselwerk, zal de<br />
voeg zeer waarschijnlijk zwaar aangetast worden. Is dit de<br />
bedoeling?<br />
29 10.39.10-a cie De bestaande galerijvloeren reinigen is mogelijk, maar tevens<br />
stralen is volgens de onderaannemers niet mogelijk. Wat<br />
aanhouden?<br />
29 10.39.10-a cie Waar bevinden zich de onder punt 3 vernoemde galerijvloeren<br />
binnen?<br />
29 10.39.10-a cie Reinigen en stralen voor zover de kopgevels niet gesloopt. De<br />
gehele kopgevel wordt toch gesloopt?<br />
30 10 Er wordt geen asbestsanering omschreven, dit staat nergens<br />
omschreven. Klopt dit?<br />
30 10 cie Wie verplaatst de bestaande bloembakken?<br />
30 10 cie Wie verwijderd de kolom met stootrubber tpv de liftdeuren?<br />
31 12.40.10-a cie “onder keldervoer” wat wordt hier bedoeld?<br />
31 12.40.10-a cie Voor afvoeren van grond rekenen op schone grond?<br />
37 20 cie Is er een sonderings rapport aanwezig?<br />
40 21.00.70.90 cie Kosten voor controleren wapenings tekeningen voor<br />
aannemer?<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 2 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
41 21.40.10-a cie Indien wapening niet verrekenbaar is krijgen wij dan ook nog<br />
wapenings tekeningen<br />
43 21.50.10-a cie U verwijst hier naar een lijst met bouwkundige voorzieningen<br />
ten behoeve van installaties, kunt u deze verstrekken?<br />
43 21.50.10-a01 cie “- wanden” Waar komt dit voor?<br />
43 21.51.10-a01 cie Graag meer duidelijkheid over deze verhogingen op de arcade.<br />
Tekening/vooraanzicht / detail / vloerdikte?<br />
44 21 cie Het behandelen van ingezaagd betonwerk en wapening staat<br />
nergens omschreven. Klopt dit?<br />
44 21.82.12 cie Waar komen er metselwerk ondersteunings elementen. De<br />
constructeur geeft dit niet duidelijk aan?<br />
46 22.31.12-a cie Is het type gevelsteen bekent ? evt. steenspecificatie?<br />
47 22.31.12-b01 cie “het gevelmetselwerk ten behoeve van de aan te helen gevel”<br />
Waar komt dit voor?<br />
47 22.60.20 cie De constructeur geeft geen dilataties aan?<br />
47 22.60.20-a0 cie Glijankers kan de constructeur afmetingen en de h.o.h. afstand<br />
opgeven<br />
47 22.60.20-a01 cie Dilataties t.p.v. zetvoegen volgens voorschriften CVK. Waar<br />
komt dit voor?<br />
47 22.60.20-a02 cie Binnenwanden er worden geen kalkzandstenen in het bestek<br />
genoemd<br />
47 22.60.30-a cie Geld dit allen voor nieuw metselwerk?<br />
48 22.82.10-a01 cie Waar komt deze betonlatei voor?<br />
48 22.82.10-b01 cie Metselwerk ondersteuning Halfen FK, is een in het werk gestort<br />
ophang rail systeem. Volgens mij komt bij de trappenhuizen<br />
een stalen muurdrager tegen de bestaande betonwanden. Wat<br />
aanhouden?<br />
49 22.82.10 cie De metselwerkondersteuningen staan niet op de tekeningen?<br />
49 22.82.10-c cie Is dit niet hetzelde als 22.82.10-b zo ja welke aan te houden<br />
49 22.82.10-c01 cie RVS Metselwerkondersteuning. Wat is dit en waar komt het<br />
voor?<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 3 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
49 22.83.13-b01 cie De muurkoppen ter plaatse van de kozijnen op de galerij en<br />
WIBO woningen, de spouw isoleren met pur platen. Klopt dit<br />
wel?, waar op tekening? Wat wordt hiermee bedoeld?<br />
50 22 cie De aan te brengen wand in het ketelhuis, staat niet in bestek.<br />
Wat aanhouden?<br />
50 22.84.30-a01 cie Hier is een kunstst<strong>of</strong> strook omschreven. In H.22.84.10 is deze<br />
van lood. Wat aanhouden?<br />
52 23.<strong>42</strong>.11 cie Det.05 geeft een gestorte betonvloer aan! Wat aanhouden?<br />
54 23.61.11-a cie Hier worden bordessen vermeld en 23.<strong>42</strong>.11-b ook welke aan<br />
te houden?<br />
54 23.70.21-b01 cie Wordt deze prefab betonband allen toegepast t.p.v. de<br />
verhogingen bij de WIBO woningen <strong>of</strong> over de gehele arcade?<br />
56 24.32.10-a cie Er wordt verwezen naar ho<strong>of</strong>dstuk 46.31.10-a ons bestek<br />
eindigd blz. 33 (ho<strong>of</strong>stuk 36. En is dus niet compleet)<br />
57 24.32.10-a01 cie “stijl en regelwerk t.b.v. dagkanten en zijwangen” Wat wordt<br />
hiermee bedoeld?<br />
57 24.32.10-a02 cie “omkokering en binnenaftimmeringen” Wat en waar<br />
aanhouden?<br />
58 24.41.51-a .02 cie Waar, hoeveel en wat zijn de afmetingen van de meterborden?<br />
58 24.41.51-a03 cie Waar komt achterhout voor bij de vliesgevel?<br />
61 24.31.10-a01 cie “Het staalskelet zoals op tekening aangegeven” Is dit alleen van<br />
de trappenhuis <strong>of</strong> ook de gehele voorziening t.b.v. de<br />
zonnecollectoren?<br />
61 25.31.10a cie Dikte vliesgevelkolommen niet opgegeven?<br />
61 25.31.10a cie Geen constuctie opgegeven tbv de vliesgevel met<br />
schuifdeuren? Gaarne uitwerking cq det.<br />
61 25.31.10-a .01 cie Welk staalskelet wordt hier bedoeld?<br />
64 30.19.10-a cie In deze paragraaf wordt er verwezen naar de kozijnstaat voor<br />
de binnenkozijnen, deze hebben wij echter niet ontvangen.<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 4 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
64 30.19.10-a cie “bij aangetaste kozijnen…..het gezonde hout verwijderen” Dit is<br />
niet in te schatten. Wat aanhouden?<br />
64 30.19.10-a 0 cie Wat dienen we aan te houden?<br />
64 30.19.10-a 0 cie Bestek; “vervangen van bestaande houten klepramen door<br />
sandwichelement met ventilatierooster.”<br />
64 30.19.10-a 0 cie Kozijnstaat; “enkelglas met ventilatierooster.”<br />
64 30.19.10-a 0 cie Op hoeveel m1 aangetaste kozijnen, ramen en deuren dienen<br />
we rekenen?<br />
64 30.19.10-a 0 cie Waar dienen we dubbele kierdichting toe te passen?<br />
64 30.19.10-a 0 cie Wij kunnen dit nergens terug vinden op de tekeningen en<br />
details.<br />
64 30.19.10-a 0 cie Waar staan de kozijnen van de wibo woningen uitgetekend?<br />
65 30.19.10-a02 cie Bestaande te renoveren binnenkozijnen volgens kozijnstaat.<br />
Hier staat geen binnenkozijnen op. Wat aanhouden?<br />
65 30.32.11-a cie U vraagt hier om meranti met FSC keurmerk, dit is niet<br />
mogelijk.<br />
65 30.32.11-a0 cie “De nieuwe hardhouten binnen glaspuien volgens kozijnstaat”<br />
Hier staan geen binnenkozijnen op. Wat aanhouden? ;Zover ik<br />
kan zien, komt er alleen een nieuw kozijn in het ketelhuis.<br />
66 30.32.11-b cie “dubbele aanslag, met kader tochtwering is niet mogelijk met<br />
deuren met 38mm” Wat aanhouden?<br />
66 30.32.11-b cie In welke kozijnen komen er draaival ramen?<br />
67 30.32.11-b01 cie Op tekening moduultekening van B3A staat kozijnmerk H17<br />
volgens mij niet aangegeven en moet hiet wel het kozijn<br />
vervangen worden. Wat aanhouden?<br />
68 30.32.12-a01 cie Wij bieden de aluminium gevelpuien aan boven de liftschacht,<br />
echter, wij hebben een kozijnstaat 31.02 ontvangen van alle<br />
aluminium kozijnen. Is deze ter informatie?<br />
68 30.32.12-b cie Hoe de aansluitdetails van deze schuifpui op omringende<br />
bouwdelen?<br />
69 30.33 cie Waarom geen standaard deur hoogten?<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 5 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
72 30.33.12-d01 cie “de draaideuren” zal schuifdeuren moet zijn?<br />
73 30.36.12-a cie U refereert hier aan een onderzoek van de adviseur akoestiek,<br />
deze opgave zit niet bij de stukken, kunt u dit nog verstrekken?<br />
73 30.36.12-a cie Kunt u aangeven wat de lengte (afmeting) is van de<br />
omschreven roosters.<br />
73 30.36.12-a 0 cie Welke kleur aanhouden voor de ventilatie rooster arcade?<br />
Bestek; “gem<strong>of</strong>feld in standaard kleur wit” Materiaal- en<br />
kleurenstaat; “metaal gem<strong>of</strong>feld lichtgrijs RAL 7035”<br />
73 30.36.12-a/b/c cie Volgens opgave adviseur akoestic. Heb ik niet ontvagen. wat<br />
aanhouden?<br />
76 30.80.31-a cie Houdt dit in dat de bestaande sloten vervangen moeten<br />
worden, er staan geen nieuwe deuren in het bestek vermeld.<br />
77 30.80.41-a cie Idem als 30.80.31-a<br />
79 31.31.20-a cie Gaarne aansluitdetails raamkozijnen lifschacht en rvs<br />
omkantpr<strong>of</strong>ielen?<br />
84 32.31.11-a01 cie Moeten de bestaande trappen in de technische ruimte<br />
vervangen worden?<br />
84 32.31.11-a01 cie Waar komt de trap in de lift kelder en hoe hoog is deze(staat<br />
niet op tekening).<br />
84 32.51.11-a cie Conform het bestek bestaan de traphekken uit een onder en<br />
een bovenregel. Echter de details van de architect geeft dit niet<br />
weer! Wat aanhouden? Gaarne wat meer details.<br />
85 32.51.11-a01 cie Nieuwe trapheken bordeshekwerken zijn volgens de<br />
hekkenleverancier, zeer moeilijk te maken. Een groot gedeelte<br />
zal in het werk gelast moeten worden. Dit komt door de aparte<br />
detaillering en smalle schalmgat. Is dit de bedoeling?<br />
87 33 cie Is het niet makkelijker om het gehele dakwerk bij 1 dakdekker<br />
onder te brengen Anders 2 dakdekkers op het werk en 2<br />
garanties<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 6 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
89 33.38.21-a cie Hoeveel tegels moeten we toepassen als ballast van het dak<br />
van de trappenhuizen?<br />
89 33.38.69-a cie Moet de omschreven valbeveiliging worden toegepast, uit<br />
recent onderzoek blijk dat het niet veilig is zie bijgaand PDF<br />
bestand Om een dak deugdelijk te beveiligen dient er een RI&E<br />
te worden gemaakt met daarin opgenomen welke<br />
voorzieningen noodzakelijk zijn om volgens de regelgeving het<br />
dak te beveiligen. (Kan de opdrachtgever geen stelpost<br />
opgeven voor dit onderdeel)<br />
93 34.33.10-a cie Waarom zijn de onderste ruiten van merk H11 niet van gelaad<br />
glas?<br />
93 34.33.10-a cie Waar bevinden zich de brandcompartimenten?<br />
93 34.33.10-a cie Dit staat niet aangeven op de tekeningen.<br />
93 34.33.10-a cie Brandoverslag t.p.v. brandcompartimentering….. Waar<br />
brandwerende voorzieningen.; Wat aanhouden?<br />
93 34.33.10-a 0 cie Is het akoestisch rapport verwerkt in de tekeningen?; blz 94<br />
34.33.10-a 0 wordt er verwezen naar het akoestisch rapport<br />
96 36.30 cie Voegvullingen en kitwerk alleen voor de nieuw aangebrachte<br />
onderdelen en voor de werkzaamheden in het bestek vermeld<br />
<strong>of</strong> echt alles wat omschreven staat?<br />
96 36.30.10-a cie Moeten alle kozijnen geheel buitenom worden afgekit?<br />
96 36.30.10-a cie Is deze omschreven kitvoeg alleen van toepassing bij nieuw<br />
aan te brengen detailleringen?; Gehele paragraaf erg<br />
onduidelijk.<br />
96 36.30.10-a08 cie Waar zitten cq komen vensterbanken, er worden geen nieuwe<br />
omschreven<br />
97 36.30.10-b cie Brandwerende kitvoegen. Dit is nergens terug te vinden op<br />
tekening. Wat aanhouden?<br />
100 37.30.19a cie Worden alle leidingen gesloopt? Zo niet hoe krijgen wij de<br />
isolatie er tussn?<br />
103 40.21.10-a cie “…zoals staat aangegeven op de afwerkstaat.” Dit staat niet<br />
aangegeven. Kunt u hiervan een opgave van de m² doen, dit is<br />
niet in te schatten.<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 7 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
103 40.21.10-a01 cie Er staat niets in de afwerkstaat hierover wat op te nemen<br />
104 40.40.90-a .02 cie Waar bevinden zich de gipsplatenplafonds?; Staat niet op<br />
tekening aangegeven.<br />
104 40.81.12-b .01 cie Waar bevinden zich de gestukadoord plafonds van de entree<br />
ho<strong>of</strong>dingang?; Staat niet aangegeven op tekening.<br />
105 41.32.11-a/b cie Dienen deze wandtegels gezet te worden? op betonwanden? <strong>of</strong><br />
gelijmd aanhouden?<br />
105 41.32.11-b cie “volgens afwerkstaat WIBO woningen). Gehele WIBO<br />
woningen staan niet op afwerkstaat. Wat aanhouden?<br />
105 41.32.11-b01 cie Het tegelwerk in de keuken over bestaand tegelwerk heen? Bij<br />
sloopwerk staat geen wandtegels keuken verwijderen vermeld<br />
106 41.<strong>42</strong>.11-a02 cie Tegelwerk in liftkooi dient volgens bestek opgenomen te<br />
worden, volgens afwerkstaat is dit derden? Wat aanhouden?<br />
106 41.<strong>42</strong>.11-b01 cie Vloertegels in WIBO woningen lijmen <strong>of</strong> zetten?<br />
108 <strong>42</strong> cie Hoe dienen we de vloer op te hogen?; Hypox epoxy is een<br />
afwerklaag van 2 á 3 mm.<br />
108 <strong>42</strong>.31.10-a cie “…de te repareren en plaatselijk te vernieuwen dekvloeren…”<br />
Kunt u hier m² opgeven? Dit is niet in te schatten.<br />
108 <strong>42</strong>.31.10-a01 cie Herstellen volgens afwerkstaat. Waar staat dit omschreven op<br />
de afwerkstaat?<br />
112 44 cie Voorzetwanden staan wel op tekening maar niet in het bestek<br />
113 44 cie Waar staan de geïsoleerde voorzetwanden in het bestek die in<br />
de bergingen/portieken komen?<br />
116 45.46.20-c .01 cie Wat wordt hiermee bedoeld?; Wij doen toch niks in de<br />
woningen op de 2e verdieping?<br />
116 45.46.20-c01 cie Wat wordt met deze paragraaf bedoeld?<br />
116 45.46.20-c01 cie Geldt dit voor alle woningen en rond om(in bewoonde<br />
woningen)<br />
118 46.21.10-b cie “…- aangetast hout verwijderen en repareren” Kunt u aangeven<br />
om hoeveel plekken dit gaat? Dit is niet in te schatten.<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 8 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
119 46.23.10-a cie Conform de afwerkstaat moeten wij de binnenzijde van de<br />
liftschacht schilderen . Echter de tekening geeft een isolatielaag<br />
aan! Wat gaan we hier nu aanhouden?<br />
algemeen vkz Kunnen na 7 oktober nog vragen gesteld worden?<br />
algemeen vkz Is het mogelijk voor de bouw te gebruiken stroom uit de<br />
woningen te betrekken?<br />
algemeen vkz Is na de aanwijzing het werk nog te bezichtigen door onze<br />
onderaannemers?<br />
algemeen vkz Waarvoor staat de term ‘wibo’?<br />
algemeen vkz Hoe vaak komt wibo woning ‘servicepunt’ voor in het gehele<br />
plan?<br />
algemeen vkz Is het acceptabel dat het gevraagde betalingsschema na<br />
gunning wordt verstrekt?<br />
algemeen vkz Kunt u het inschrijfbiljet aanpassen zodat er een prijs kan<br />
worden opgegeven voor kavel 1, kavel 2 en gecombineerd 1 en<br />
2?<br />
algemeen cie In het bouwkundig bestek staat omschreven dat de plafonds in<br />
de arcades, galarijen en aviobruggen worden gesloopt. In de<br />
lijst van bouwkundige voorzieningen welke in de<br />
werktuigkundige bestek is bijgevoegd wordt dit niet vermeld.<br />
algemeen vkz Vraag: sloop bouwkundig aannemer vooruitlopend op het<br />
vervangen van de transportleidingen de plafonds<br />
algemeen vkz Kan de aanbesteding uitgesteld worden met 14 dagen?<br />
algemeen vkz Mogen er nog vragen gesteld worden over de nota van<br />
inlichtingen als die geen duidelijk verschaft?<br />
algemeen vkz Is het werk precario belast?<br />
Algemeen vkz Is het de bedoeling dat de bouwkundige aannemer voor kavel 2<br />
apart een inschrijfbiljet inlevert?<br />
Algemeen vkz Dat betekent dan, dat de bouwkundige aannemer alleen<br />
opdracht zou kunnen krijgen voor het dakwerk?<br />
Algemeen vkz Of wordt er bedoeld dat de bouwkundige aannemer voor kavel<br />
1 in kan schrijven en voor kavel 1+2 samen kan inschrijven?<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 9 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
Algemeen vkz De toegevoegde planning geeft aan dat de definitieve bouwtijd<br />
op 592 dagen staat. Echter bouwstroom II heeft al 650 dagen.<br />
Klopt dit wel, en wat aanhouden?<br />
Algemeen vkz Gezien de hoeveelheid werk wil ik u graag vragen <strong>of</strong> het<br />
mogelijk is om in ieder geval 1 week later na 7 oktober nog<br />
vragen te kunnen indienen. Alle onderaannemers hebben net<br />
deze week de gegevens binnen gekregen en kunnen op dit<br />
korte termijn geen vragen stellen.<br />
Algemeen vkz Daarmee vraag ik ook gelijk uitstel voor het indienen van totale<br />
aanneemsom.<br />
Algemeen vkz In dit ho<strong>of</strong>dstuk worden geen keten, opslagruimte en toilet<br />
;genoemd, wordt dit gratis ter beschikking gesteld.<br />
Algemeen vkz Dient de dakdekker zich te conformeren aan de bouwstroom<br />
van bouwkundig aannemer, <strong>of</strong> kan onafhankelijk (sneller)<br />
worden gewerkt.<br />
Algemeen cie / schreuder Indien doorvoeren worden bijgeplaats, verplaatst <strong>of</strong> komen te<br />
vervallen, wie verzorgd het boren van de gaten in de dakvloer.<br />
Algemeen cie Dakafwerking nieuwe trappenhuizen wordt niet in het bestek<br />
vernoemd, valt dit buiten dit bestek?<br />
Algemeen vkz Blijven alle woningen bewoond?<br />
algemeen vkz Kunt u het inschrijfbiljet digitaal verstrekken?<br />
algemeen vkz Het asbest verwijderen valt ook binnen de opdracht van de<br />
bouwkundige kavel?<br />
algemeen CV schreuder Het beloop van de c.v. leidingen zijn op de tekeningen van de<br />
woninginstallatie anders getekend dan in de modelwoning zijn<br />
aangebracht. In de modelwoning is gebruik gemaakt van de<br />
bestaande doorvoeringen. Vraag: bestaande sparingen<br />
hergebruiken <strong>of</strong> leidingsysteem aanbrengen zoals op tekening<br />
en nieuwe sparingen boren<br />
leidingen aanbrengen conform tekening , leidingen<br />
strak aan het plafond aan brengen als een nette<br />
zichtinstallatie. Indien hierbij bestaande sparingen<br />
kunnen worden hergebruikt mag dit uiteraard, het is<br />
echter geen uitgangspunt.<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 10 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
algemeen E schreuder Voor de E-installaties worden gaten groter dan 25 mm door<br />
bouwkundig aannemer aangebracht. Vraag: de nieuwe<br />
sparingen voor b.v. de nieuwe wateraansluiting vanaf de<br />
arcades naar de woningen door wie te boren.<br />
Algemeen E schreuder Zijn er tekeningen van de bestaande elektrische installaties<br />
beschikbaar (woningen en algemene ruimten zoals galerijen,<br />
CVZ )<br />
Algemeen E schreuder Zijn er tekeningen van de bestaande regel installaties<br />
beschikbaar<br />
Algemeen E schreuder Door bewoners zelf aangebrachte voorzieningen dienen correct<br />
te worden aangesloten <strong>of</strong> verwijderd. Op welke omvang te<br />
rekenen <strong>of</strong> heeft er een inventarisatie plaatsgevonden<br />
Algemeen E schreuder Omschreven transparanten en noodverlichtingarmaturen<br />
volgens bouwaanvraag; Zo ja, de tekening bouwaanvraag<br />
graag verstrekken<br />
Algemeen E schreuder Moeten de armaturen naast de voordeuren begane grond ook<br />
worden vervangen<br />
Algemeen E schreuder omvang van de installatie in de ateliers, kantoorruimten,<br />
bergingen etc.<br />
Algemeen E schreuder Waar zitten de liftmachinekamers <strong>of</strong> besturingskasten voor de<br />
liften<br />
Asbest-rapporten vkz Hoe moeten wij deze asbestrapporten lezen?<br />
Asbest-rapporten vkz Alleen te gebruiken voor die onderdelen die voor de<br />
desbetreffende kavel van toepassing zijn. ;Bv. Weghalen<br />
plafondplaatjes bij de bouwkundige aannemer.;Kit afdichting alu<br />
kozijnen door Derden ;Kanaal badkamer door Derden ;Etc. etc.<br />
De water aansluitingen dienen geisoleer te worden<br />
doorgevoerd en zullen als zodanig een sparing<br />
groter dan 25 mm nodig hebben.Deze sparingen zijn<br />
dan ook opgeomen in de lijst bouwkundige<br />
voorzieningen<br />
Er zijn geen tekeningen beschikbaar, wel zijn er<br />
enkle foto's van de verdeelkastschema's welke<br />
worden bijgevoegd bij deze nota.<br />
Deze zijn niet beschikbaar.<br />
De voorzieningen dienen door de bewoner zelf te<br />
worden verwijderd<br />
De omschreven noodverlichting komt te vervallen.<br />
Dit is hier niet vereist.<br />
Ja, verlichting uitvoeren conform de galerij.<br />
Er worden geen elektotechnische aanpasingen<br />
gedaan in de woningen.<br />
Huidige liftmachinekamers vervallen (hoog naast de<br />
schacht), nieuwe liften zijn liftmachinekamerloos<br />
besturingskast komt in een kast in de liftput.<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 11 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
Asbest-rapporten vkz Er zijn alleen asbestrapportages genomen van de blokken A-E-<br />
F en ketelhuis 2!; Overige blokken zijn schoon <strong>of</strong> hoeven niet<br />
te worden opgenomen?<br />
kavel 3 51.11.10-a cie Bestek gedeelte is niet aanwezig i.m.v. levering plakplaten<br />
beluchtingen.Indien terbeschikking gesteld, dan dient de<br />
beluchting een dubbele plakplaat te hebben om stank en<br />
dampdicht aan te sluiten op de dampremmende laag en op de<br />
dakbedekking. (model omschreven in bestek kavel 3 is niet<br />
toepasbaar) Zijn de aantallen bekend.<br />
kavel 3 51.62.30-a cie Bestek gedeelte is niet aanwezig i.m.v. levering plakplaten<br />
beluchtingen.Indien terbeschikking gesteld, dan dient de<br />
beluchting een dubbele plakplaat te hebben om stank en<br />
dampdicht aan te sluiten op de dampremmende laag en op de<br />
dakbedekking. (model omschreven in bestek kavel 3 is niet<br />
toepasbaar) Zijn de aantallen bekend.<br />
kavel 3 61.11.10-a cie Bestek gedeelte is niet aanwezig i.m.v. levering plakplaten<br />
beluchtingen.Indien terbeschikking gesteld, dan dient de<br />
beluchting een dubbele plakplaat te hebben om stank en<br />
dampdicht aan te sluiten op de dampremmende laag en op de<br />
dakbedekking. (model omschreven in bestek kavel 3 is niet<br />
toepasbaar) Zijn de aantallen bekend.<br />
kavel 3 cie / Bouwkundige voorzieningen. E-installatie: Op hoeveel<br />
kavel 4 00.03.10<br />
schreuder sparingen groter dan 25 mm te rekenen? En in welke diameters<br />
en diepte/breedte?<br />
cie / schreuder In bestek kavel 4 wordt onder 00.03.10 gesproken over “lijst Deze text is niet juist en komt te vervallen.<br />
bouwkundige werkzaamheden door installateur” Vraag: Gaarne Bouwkundige werkzameden conform de in het<br />
deze lijst verstrekken.<br />
bestek omschreven werkzaamheden (exclusief de<br />
werkzaamden zoals opgenomen in de lijst<br />
bouwkundige werkzaamheden door de bouwkundig<br />
aannemer) .<br />
kavel 4 00.04.10 vkz "het aanbestedingsregelement dd 15-09-2005" hebben wij niet<br />
ontvangen.<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 12 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
kavel 4 10.31.09-a schreuder In bestek kavel 4 wordt onder 10.31.09-a verwezen naar Hiermee wordt bedoeld het "Bouwplaatsprotocol"<br />
“bijlage 8” Vraag: Deze bijlage 8 verstrekken.<br />
d.d. 15 -09-2005 aangeleverd door VKZ.<br />
kleur/materiaal<br />
cie In de kleur/materiaalstaat staan de kolommen, balkonschermen<br />
staat<br />
en betongevelbanden omschreven als keimwerk, deze staan<br />
niet in het bestek genoemd. Wat aan te houden? Het gaat om<br />
heel veel meters.<br />
protocol 2.3.b vkz Wij gaan er vanuit dat de voorzieningen t.b.v. de bewoners, die<br />
door de derden uitgevoerd moeten worden, door de derden zelf<br />
uitgevoerd worden.<br />
protocol 3.4. vkz Wij gaan er vanuit dat met het woord “aannemer” bedoeld<br />
wordt derden, voorzover de bouwkundige aannemer niets met<br />
dit onderdeel te maken heeft.<br />
protocol 3.4.g vkz Dit is door bouwkundige aannemer nu niet in te schatten. Dit is<br />
voor derden? Wat aanhouden?<br />
protocol 3.4.h vkz Moeten alle bergingsruimtes geheel laag gehaald worden? zo<br />
ja, wat aanhouden voor opslag mogelijkheden bewoner?<br />
protocol 3.6.a vkz Hulp bewoners. Wat aanhouden? Gemiddeld 1 uur per woning?<br />
5 vkz Moeten wij schaftruimte aanbieden aan alle derden? Zo ja,<br />
hoeveel mensen zijn dit per dag?<br />
14 cie /<br />
schreuder<br />
Wie sluit de hwa (koker)aan op het riool?<br />
14 cie /<br />
schreuder<br />
Waar bevindt zicht het aansluitpunt?<br />
14 cie /<br />
schreuder<br />
Hoe is de overgang van de koker naar het riool?<br />
14 cie /<br />
schreuder<br />
Wie levert de dakdoorvoeren van de hwa?<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 13 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
25 cie Waaruit bestaat de kolom die gebruikt wordt als HWA ? en hoe<br />
zijn de aansluit details?<br />
33 cie Wat is de huidige opbouw van de dakbedekking?<br />
33 cie Materialen maatvoering en bevestigingsmethode?<br />
33 cie Hoe zijn de bestaande dilataties gedetailleerd?<br />
33 cie En wordt het e.e.a. geïsoleerd? Zo ja hoe?<br />
33 cie Hoe zien de nieuwe dakopstand details t.p.v. ventilatoren eruit?<br />
35 cie Gaarne een omschrijving van het kunststeen? Of worden de<br />
dorpels door derden geleverd en geplaatst?<br />
41 cie Er worden geen vloertegelwerken beschreven?Echter de<br />
afwerkstaten geven wel nieuw vloertegelwerk aan! Wat is nu de<br />
bedoeling?<br />
41 cie Ook worden er op de afwerkstaat plinttegels omschreven! Waar<br />
worden deze toegepast en in welke afmeting?<br />
41 cie Betegeling liftkooi vloer door de leverancier van de liften?<br />
43 cie Gaarne een uitwerkingsdetail van de ventilatieroosters tpv de<br />
trappenhuizen? Ook ivm insektengaas?<br />
01.04.10 cie Wat is de peildatum indien de risicoregeling van toepassing is?<br />
50.11.10-a cie / schreuder Bestek gedeelte is niet aanwezig i.m.v. levering plakplaten<br />
hemelwaterafvoeren. Indien terbeschikking gesteld, dan dient<br />
de hemelwaterafvoer een dubbele plakplaat te hebben om<br />
water en dampdicht aan te sluiten op de dampremmende laag<br />
en op de dakbedekking. (model omschreven in bestek kavel 3<br />
is niet toepasbaar)<br />
24.01 cie Komt niet overeen met de slooptekening (liftmachinekamer)!;<br />
Welke aanhouden?<br />
24.11 cie Op de bgg komt een nieuwe prefab kolom! Wordt niet<br />
omschreven in het bestek? Hoe gaan we deze verankeren en<br />
plaatsen tussen de bestaande constructies in? Gaarne<br />
informatie van de contructeur?<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 14 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
24.11 cie Waarmee wordt de liftschacht wand aangeheeld tpv de<br />
voormalige machinekamer? De constr. Geeft hier niets voor<br />
aan?<br />
24.11 cie Het trapje tbv de liftkelder wordt niet weergegeven. Welke eisen<br />
stelt het liftinstituut?<br />
24.11 cie Welke afwerking krijgt het vloertje op op 11200+P tpv de lifthal?<br />
24.11 cie Hoe loopt de HWA? Wie sluit deze aan?<br />
B-01.30 cie Portiek; Tot waar de wanden spacken.; In bestek staat<br />
omschreven: “schilderen met muurverf”.<br />
B-01.30 cie Wat aanhouden voor het plafond in de portiek.; Er staat;<br />
“aanhelen en spuiten” en 2-laags Travertin Micro<br />
B-01.30 cie (P) Waarom tegelwerk tot aan plafond?; In de proef woning was<br />
dit niet zo.<br />
B-01.30 cie Waarom geen tegelwerk tpv gasfornuis.<br />
B-01.30 cie Waar komt de koelkast te staan?<br />
B-01.30 cie Badtoiletruimte:<br />
B-01.30 cie Wat te doen met granitovloer?<br />
B-01.30 cie Hoe draairichting van de deur wijzigen?<br />
B-01.30 cie Wat voor een sanitair komt er in de badkamer?<br />
B-01.30 cie Wie kit dit af?<br />
B-02 cie Dikte stalen kolommen?<br />
B-02.08 cie Kunt u op een plattegrondtekening aangeven waar precies<br />
kozijnmerk H48 en H49 komen?<br />
B-02.09 cie Gaarne ook details van de aansluiting met bestaande<br />
constructies?<br />
B-03 cie Constructie prefab wand. Tpv bgg?<br />
B-04 cie Geen gegevens bevestigingsconstructie glazen<br />
binnenvliesgevel?<br />
cie Bij een ronde doorvoer kan de dakbedekking niet worden<br />
B-04.02 15<br />
opgeplakt.<br />
B-04.02 15 cie Worden de collectorondersteunigen geisoleerd aangeleverd.<br />
B-04.02 15 cie Isoleren in het werk is niet mogelijk.<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 15 van 16
Vragen nav bestek en tekeningen Het Breed<br />
tek nr. blz par./ nr. Vraag / Opmerking Antwoord / reactie<br />
B-04.02 15 cie Wie leverend en monteerd de collectorondersteunigen.<br />
cie Actie 04: “eventuele tegels verwijderen”, zitten er tegels? ;Zo ja<br />
B-24.16<br />
hoeveel trappenhuizen?<br />
schreuder Op de elektratekening staan op de doorsnede van trappenhuis<br />
T1, 10 armaturen getekend. Op de bouwkundige tekening<br />
staan er echter 11 getekend. Welke tekening aan te houden<br />
tek E<br />
schreuder Op de E-tekening trappenhuis T1 staat vermeld:De plattegrond, De noodverlichting komt geheel te vervallen.<br />
armaturen type C+D, normale uitvoering; De doorsnede,<br />
armaturen type C+D, uitvoering met noodunit; Elk armatuur<br />
uitvoeren met noodunit lijkt mij niet de bedoeling<br />
Armaturen uitvoeren zonder noodunit<br />
tek E<br />
tek E<br />
schreuder Is de toevoeging A, B, C, D achter T1 van belang <strong>of</strong> is de<br />
uitvoering gelijk Dit is de bouwkundige benaming. Uitvoering is gelijk<br />
beantwoording vragen schouw SG Schriftelijke vragen<br />
geprint: 13-3-2008 16:34 VKZ BV blad 16 van 16
BESTEK KAVEL 4<br />
ten behoeve van het berekenen,leveren, monteren en<br />
bedrijfsvaardig opleveren van de Eco Energy installatie<br />
in de woonwijk Het Breed te Amsterdam, kavel 4<br />
Besteknummer : 54009Eco<br />
Datum : 15 september 2005<br />
Op dit bestek rust het STABU Keurmerk onder<br />
licentienummer 88.<strong>42</strong>.05.E<br />
Schreuder Groep Ingenieurs/Adviseurs<br />
Postbus 197<br />
3600 AD MAARSSEN<br />
Tel.: 0346 573 077<br />
Fax: 0346 575 664<br />
Email:maarssen@schreuder.nl<br />
Webside: www.schreuder.nl
Opdrachtgever: Eco Energy<br />
ENECO Energie Haarlem<br />
Postbus 818<br />
2003 RV Haarlem<br />
023 510 35 10<br />
Directie/projectmanagement:<br />
Eco Energy<br />
ENECO Energie Haarlem<br />
Postbus 818<br />
2003 RV Haarlem<br />
023 510 35 10<br />
Van Keulen & van Zutphen bv<br />
Rembrandtlaan 31<br />
3723 BG Bilthoven<br />
030 251 74 76<br />
Architect: De Architekten Cie<br />
Postbus 576<br />
1000AN Amsterdam<br />
020 530 93 00<br />
Constructeur: Pieters bouwtechniek bv<br />
Waalstraat 1<br />
1078 BV Amsterdam<br />
020 305 09 40<br />
Adviseur installaties: SchreuderGroep<br />
Postbus 197<br />
3600 AD Maarssen<br />
0346 57 30 77<br />
Adviseur bouwfysica: Lichtveld Buys & Partners bv<br />
Postbus 156<br />
3500AD Utrecht<br />
030 231 13 77<br />
Bestek ten behoeve van: Eco Energy installatie in de woonwijk Het Breed te Amsterdam<br />
Besteknummer: 54009Eco<br />
Datum: 15 september 2005<br />
Directie: de directievoering op de bouw geschiedt door de Van Keulen & van Zutphen bv die ten aanzien van<br />
de installaties wordt bijgestaan door de Schreuder Groep
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
INHOUDSOPGAVE<br />
00 ALGEMEEN 1<br />
00.01 ALGEMENE OMSCHRIJVING 1<br />
00.02 ALGEMENE PROJECTGEGEVENS 1<br />
00.03 WERKZAAMHEDEN DERDEN 2<br />
00.04 AANBESTEDING/INSCHRIJVING 3<br />
B. ADMINISTRATIEVE BEPALINGEN 4<br />
01 VOOR HET WERK GELDENDE VOORWAARDEN 4<br />
01.01 VAN TOEPASSING ZIJNDE VOORWAARDEN EN VOORSCHRIFTEN 4<br />
01.02 ADMINISTRATIEVE BEPALINGEN AANSLUITEND OP DE U.A.V. 4<br />
01.03 VERZEKERINGEN 10<br />
01.04 VERREKENING WIJZIGING KOSTEN EN PRIJZEN 11<br />
01.05 TEKENINGEN EN BEREKENINGEN 11<br />
01.06 ARBEIDSOMSTANDIGHEDEN 13<br />
E. TECHNISCHE BEPALINGEN EN WERKBESCHRIJVING 14<br />
05 BOUWPLAATSVOORZIENINGEN 14<br />
05.00 ALGEMEEN 14<br />
05.31 LOODSEN EN KETEN 14<br />
05.32 BESCHIKBAARSTELLING MATERIEEL 14<br />
05.34 SCHOONMAKEN EN PREVENTIEF ONDERHOUD NIEUW WERK 15<br />
10 STUT- EN SLOOPWERK 16<br />
10.31 TOTAAL SLOOPWERK 16<br />
51 BINNENRIOLERING 17<br />
51.00 ALGEMEEN 17<br />
51.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN 17<br />
51.12 TEKENINGEN EN BEREKENINGEN 17<br />
51.31 METALEN BUISLEIDINGEN 18<br />
51.32 KUNSTSTOF BUISLEIDINGEN 19<br />
52 WATERINSTALLATIES 20<br />
52.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN 20<br />
52.12 TEKENINGEN EN BEREKENINGEN 21<br />
52.13 BEPROEVEN, INREGELEN, IN BEDRIJF STELLEN EN CONTROLEREN 22<br />
52.31 METALEN BUISLEIDINGEN 23<br />
52.40 POMPEN EN APPARATEN 24<br />
52.51 VOORRAADTOESTELLEN 25<br />
52.52 DOORSTROOMTOESTELLEN 26<br />
52.61 APPENDAGES IN LEIDINGEN 27<br />
52.63 APPENDAGES OM LEIDINGEN 29<br />
52.81 ISOLATIE 30<br />
54 BRANDBESTRIJDINGSINSTALLATIES 32<br />
54.00 ALGEMEEN 32<br />
54.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN 32<br />
54.12 TEKENINGEN EN BEREKENINGEN 32<br />
54.40 BRANDBLUSTOESTELLEN 33<br />
55 GASINSTALLATIES 34<br />
55.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN 34<br />
55.12 TEKENINGEN EN BEREKENINGEN 34<br />
Projectnummer 54009 I
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
55.13 BEPROEVEN, INREGELEN, IN BEDRIJF STELLEN EN CONTROLEREN 35<br />
55.31 METALEN BUISLEIDINGEN 35<br />
55.51 APPENDAGES IN LEIDINGEN 36<br />
55.53 APPENDAGES OM LEIDINGEN 36<br />
60 VERWARMINGSINSTALLATIES 37<br />
60.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN 37<br />
60.12 TEKENINGEN EN BEREKENINGEN 37<br />
60.31 METALEN BUISLEIDINGEN 40<br />
60.34 METALEN KANALEN 41<br />
60.51 CENTRALE WARMTE-OPWEKKINGSAPPARATEN <strong>42</strong><br />
60.60 FLESSEN EN TANKS 43<br />
60.71 APPENDAGES IN LEIDINGEN EN KANALEN 44<br />
60.72 APPENDAGES AAN LEIDINGEN EN KANALEN 47<br />
60.81 ISOLATIE 48<br />
61 VENTILATIE- EN LUCHTBEHANDELINGSINSTALLATIES 49<br />
61.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN 49<br />
68 REGELINSTALLATIES 50<br />
68.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN 50<br />
70 ELEKTROTECHNISCHE INSTALLATIES 53<br />
70.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN 53<br />
EINDPAGINA 54<br />
Z. BIJLAGEN 55<br />
BIJLAGE 1, MODEL INSCHRIJFBILJET, SPECIFICATIEFORMULIEREN 56<br />
BIJLAGE 2, COORDINATIEOVEREENKOMST 57<br />
BIJLAGE 3, LIJST BOUWKUNDIGE VOORZIENINGEN BK-AANNEMER 58<br />
BIJLAGE 4, TEKENINGENLIJST 59<br />
BIJLAGE 5, PROJECTPLAN UITVOERING 60<br />
BIJLAGE 6, VEILIGHEIDS EN GEZONDHEIDSPLAN (V&G) 61<br />
BIJLAGE 7, LIJST BOUWKUNDIGE VOORZIENINGEN DAKDEKKER 62<br />
Projectnummer 54009 II
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
00 ALGEMEEN<br />
00.01 ALGEMENE OMSCHRIJVING<br />
00.01.10 ALGEMENE OMSCHRIJVING VAN HET WERK<br />
01. ALGEMENE OMSCHRIJVING<br />
Dit bestek omvat de omschrijving ten behoeve van het ontwerpen,berekenen, leveren,<br />
monteren en bedrijfsvaardig opleveren van de Eco-<strong>energy</strong>installatie met bijkomende<br />
voorzieningen, ten behoeve van de revitalisatie woningen Het Breed te Amsterdam.<br />
00.02 ALGEMENE PROJECTGEGEVENS<br />
00.02.11 OVERZICHTEN<br />
02. OVERZICHT STELPOSTEN<br />
De stelposten als bedoeld in paragraaf 37 lid 1 van de U.A.V. zijn de volgende:<br />
Het reviseren en <strong>of</strong> vervangen van onderdelen in de bestaande hydr<strong>of</strong>foorinstallaties<br />
stelpost € 2500,- per ketelhuis.<br />
Het vervangen en uitbreiden van schakelmateriaal en verlichtingsarmaturen in de<br />
ketelhuizen € 1500,- per ketelhuis.<br />
00.02.40 VERLEGGINGSREGELING OMZETBEL./KETENAANSPRAKELIJKHEID<br />
01. VERLEGGINGSREGELING OMZETBELASTING<br />
De aannemer moet op zijn declaratie vermelden dat de omzetbelasting wordt verlegd,<br />
tenzij de belastingdienst die ter zake bevoegd is, schriftelijk heeft medegedeeld dat<br />
ten aanzien van het werk de verleggingsregeling omzetbelasting niet van toepassing is.<br />
De aannemer moet deze besteksbepaling in eventueel door hem af te sluiten<br />
onderaannemingsovereenkomsten opnemen en de onderaannemer verplichten deze<br />
bepaling in eventueel door hem af te sluiten onderaannemingsovereenkomsten op te<br />
nemen.<br />
02. VERKLARINGEN BETALINGSGEDRAG AANNEMER<br />
Desgevraagd moet de aannemer na het verstrijken van elk kalenderkwartaal aan de<br />
opdrachtgever de meest recente verklaringen van de bevoegde belastingdienst en van<br />
de desbetreffende bedrijfsvereniging verstrekken omtrent zijn betalingsgedrag inzake<br />
de afdracht van loonbelasting en sociale verzekeringspremies. De aannemer moet deze<br />
besteksbepaling in eventueel door hem af te sluiten onderaannemingsovereenkomsten<br />
opnemen en de onderaannemer verplichten deze bepaling in eventueel door hem af te<br />
sluiten onderaannemingsovereenkomsten op te nemen.<br />
03. ONDERAANNEMERS/PERSONEEL VAN DERDEN<br />
De aannemer mag bij de uitvoering van het werk slechts gebruik maken van:<br />
- onderaannemers, indien hij daarvoor schriftelijke goedkeuring van de<br />
"opdrachtgever" in plaats van de "directie" heeft gekregen, zulks in afwijking van<br />
paragraaf 6, lid 26 van de U.A.V.<br />
Alle voor het werk in te schakelen onderaannemers moeten een geblokkeerde rekening<br />
hebben geopend als bedoeld in het G-rekeningenbesluit 1991. De aannemer moet deze<br />
bestekbepaling in eventueel door hem af te sluiten onderaannemingsovereenkomsten<br />
opnemen en de onderaannemer verplichten deze bepaling in eventueel door hem af te<br />
sluiten onderaannemingsovereenkomsten op te nemen.<br />
Projectnummer 54009 1
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
00.02.40 VERLEGGINGSREGELING OMZETBEL./KETENAANSPRAKELIJKHEID (vervolg)<br />
04. STORTING OP G-REKENING<br />
De aannemer verschaft zo spoedig mogelijk na de opdracht van het werk de gegevens<br />
als bedoeld in artikel 3 lid 2 van het G-rekeningenbesluit 1991 en nadien de gegevens<br />
van artikel 4 van dit besluit alsmede de gegevens bedoeld in artikel 3 sub c van het<br />
Besluit administratievoorschriften bij onderaanneming (Besluit van 26 mei 1982, Stcrt.<br />
109).<br />
Het percentage van elke door de aannemer in te dienen declaratie dat door de<br />
opdrachtgever in verband met de door de aannemer voor zijn werknemers<br />
verschuldigde loonbelasting en sociale premies op de geblokkeerde rekening zal<br />
worden gestort bedraagt: 40%<br />
De aannemer moet op elke declaratie uitdrukkelijk het loonkostenbestanddeel van het<br />
gedeclareerde bedrag vermelden.<br />
Niettemin is de opdrachtgever gerechtigd in bijzondere omstandigheden het gedeelte<br />
van de aannemingssom dat betrekking heeft op de door de aannemer voor zijn<br />
werknemers verschuldigde loonbelasting en sociale premies rechtstreeks aan de<br />
bevoegde belastingdienst en de desbetreffende bedrijfsvereniging over te maken. De<br />
opdrachtgever zal deze stortingen in mindering brengen op de door hem verschuldigde<br />
termijnen van de aannemingssom.<br />
Voordat de opdrachtgever daartoe overgaat, zal hij de aannemer daarover schriftelijk<br />
inlichten.<br />
De aannemer moet deze besteksbepaling in eventueel door hem af te sluiten<br />
onderaannemingsovereenkomsten opnemen en de onderaannemer verplichten deze<br />
bepaling in eventueel door hem af te sluiten onderaannemingsovereenkomsten op te<br />
nemen.<br />
05. VRIJWARING<br />
De aannemer vrijwaart de opdrachtgever tegen alle eventuele aanspraken die door de<br />
belastingdienst <strong>of</strong> de bedrijfsvereniging in het kader van de Wet<br />
Ketenaansprakelijkheid (Wet van 4 juni 1981 Stb.370) worden gemaakt, alsmede tegen<br />
eventuele op die wet gebaseerde verhaalsaanspraken van onderaannemers die met (een<br />
deel van) het werk zullen worden belast.<br />
De aannemer moet deze besteksbepaling in eventueel door hem af te sluiten<br />
onderaannemingsovereenkomsten opnemen en de onderaannemer verplichten deze<br />
bepaling in eventueel door hem af te sluiten onderaannemingsovereenkomsten op te<br />
nemen.<br />
00.03 WERKZAAMHEDEN DERDEN<br />
00.03.10 WERKZAAMHEDEN DOOR DERDEN<br />
01. WERKZAAMHEDEN DOOR DERDEN<br />
Door derden worden uitgevoerd:<br />
-<br />
- de bouwkundige werkzaamheden aan de gevelpuien, de gallerijplafonds en de<br />
trappenhuizen.<br />
- de bouwkundige werkzaamheden zoals zij globaal zijn omschreven in de lijst<br />
bouwkundige werkzaamheden door de bouwkundig aannemer<br />
- de installatiewerkzaamheden in de woningen welek niet in dit bestek zijn<br />
omschreven<br />
(alle werkzaamheden die ten behoeve van de installatiewerkzaamheden<br />
noodzakelijk zijn, dienen door de aannemer van dit bestek te worden opgenomen in<br />
zijn prijs, zie voor globale omschrijving de lijst bouwkundige werkzaamheden door<br />
installateur.)<br />
Projectnummer 54009 2
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
00.03.10 WERKZAAMHEDEN DOOR DERDEN (vervolg)<br />
00.04 AANBESTEDING/INSCHRIJVING<br />
00.04.01 AANBESTEDING/INSCHRIJVING<br />
90. INRICHTING BEGROTING<br />
De aannemer geeft ten behoeve van het werk een open begroting af aan de<br />
opdrachtgever. In de begroting dient duidelijk te zijn aangegeven de<br />
aantallen/fabrikaten, montage uren, kortingpercentages, opslagen en end-fatoren.<br />
Deze begroting zal tevens de bassis zijn voor de verrekening van wijzigingen en<br />
eventueel meer- en minderwerk<br />
91. AFSTANDSVERKLARING<br />
Indien aannemer en opdrachtgere in redelijkheid niet tot prijsovereenstemming komen,<br />
zal de aannemer schriftelijk afzien van zijn recht werk uit te mogen voeren.<br />
Gemaakte kosten zullen aan de aannemer vergoed worden<br />
Projectnummer 54009 3
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
B. ADMINISTRATIEVE BEPALINGEN<br />
01 VOOR HET WERK GELDENDE VOORWAARDEN<br />
01.01 VAN TOEPASSING ZIJNDE VOORWAARDEN EN VOORSCHRIFTEN<br />
01.01.10 VAN TOEPASSING ZIJNDE VOORWAARDEN<br />
01. VAN TOEPASSING ZIJNDE VOORWAARDEN<br />
Van toepassing zijn de standaardbepalingen, zoals deze zijn opgenomen in de STABU<br />
Standaard 2001, uitgegeven door de Stichting STABU te Ede.<br />
01.02 ADMINISTRATIEVE BEPALINGEN AANSLUITEND OP DE U.A.V.<br />
01.02.01 AANDUIDINGEN, BEGRIPSBEPALINGEN<br />
03. INSTALLATIES<br />
In paragraaf 1, lid 1 van de U.A.V. dient met betrekking tot "bouwst<strong>of</strong>fen" in plaats<br />
van "installaties" gelezen te worden "installaties <strong>of</strong> onderdelen daarvan".<br />
Daar waar in de U.A.V. sprake is van "onderhoudstermijn" dient gelezen te worden<br />
"onderhouds- <strong>of</strong> servicetermijn".<br />
01.02.02 VAN TOEPASSING ZIJNDE VOORSCHRIFTEN<br />
01. GELDIGHEID<br />
Daar waar een publicatie zonder datum is vermeld, is deze publicatie van toepassing<br />
zoals deze drie maanden voor de dag van aanbesteding luidt.<br />
90. TOEVOEGEN AAN<br />
Toevoegen aan par. 2 U.A.V. toveoegen aan lid 4:<br />
Van toepassing zijn alle voorschriften,verodeningen,bepalingen en aanwijzingen van<br />
Rijk, Provincie, Gemeente e.d. die op het werk van toepassing <strong>of</strong> invloed zijn.<br />
De op het werk van toepassing zijnde normbladen , uitgegevn door Stichting Nedeland<br />
<strong>No</strong>rmalisatie Instituut, zoals deze luiden een maand voor de dag van de aanbesteding.<br />
Waar voorschriften voorwarden bepalingen e.e. in strijd zijn met de bepalingen van<br />
dit bestek bestaat vooran in de anvolgende volgorde:<br />
Europese richtlijnen;<br />
voorschriften e.d. van Rijk Provincie <strong>of</strong> Gemeente<br />
<strong>No</strong>ta's van inlichtingen<br />
Staat van aanvullingen<br />
Bestek<br />
UAVTI<br />
Onder andere zijn de volgende normen van toepassing<br />
Tapwaterinstallaties<br />
NEN: 1006/2200<br />
NPR: 5075<br />
Vewin werkbladen<br />
Verwarmingsinstallaties<br />
NEN 2078 /3028 /2757 /1087<br />
een brandveilig gebouw installeren<br />
Projectnummer 54009 4
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.02.02 VAN TOEPASSING ZIJNDE VOORSCHRIFTEN (vervolg)<br />
NEN 1087<br />
NPR 3378<br />
Elektrotechnische installaties<br />
NEN 1010<br />
Algemeen<br />
Isso publikaties<br />
normen en richtlijnen van ed diverse fabrikanten<br />
01.02.06 VERPLICHTINGEN VAN DE AANNEMER<br />
01. CESSIE VORDERING OP LEVERANCIER<br />
Indien de opdrachtgever krachtens paragraaf 5, lid 5 van de U.A.V. voor niet <strong>of</strong> niet<br />
tijdige levering aansprakelijk is, zal de aannemer zijn vordering op de leverancier op<br />
eerste verzoek van de opdrachtgever aan deze cederen tot aan het door de<br />
opdrachtgever aan hem vergoede bedrag.<br />
02. ONGEVALLEN<br />
De aannemer moet de directie terstond op de hoogte stellen van alle ongevallen op het<br />
werkterrein, met verstrekking van alle ter zake doende inlichtingen.<br />
04. WERKZAAMHEDEN BUITEN OVEREENGEKOMEN WERKTIJDEN<br />
Indien de aannemer voornemens is werkzaamheden op het werkterrein te verrichten<br />
buiten de werktijden zoals deze zijn overeengekomen met de directie<br />
dient hij bij de directie hiertoe tijdig een verzoek in.<br />
90. INSTRUCTIE PERSONEEL<br />
Het door de opdrachtgever aangewezen personeel van de gebruiker van het object zal<br />
binnen een maand na de oplevering geïnstrueerd worden in de bediening en het<br />
onderhoud van de installaties. Indien niet anders is aangegeven zal de tijdsduur van<br />
deze instructie ten hoogste een werkdag bedragen.<br />
91. NUTSBEDRIJVEN EN ARBEIDSINSPECTIE<br />
Bij de aanvang van het werk contact opnemen met de betrokken nutsbedrijven en de<br />
arbeidsinspectie en het overleg zodanig regelen dat de voortgang van het werk niet<br />
wordt geschaad.<br />
De door genoemde instellingen gevraagde nadere gegevens betreffende de installatie<br />
tijdig aan deze instellingen overleggen.<br />
De directie over alle afspraken met de nutsbedrijven en de arbeidsinspectie informeren<br />
01.02.07 DATUM VAN AANVANG<br />
01. AANVANG WERKZAAMHEDEN<br />
Het is de aannemer niet toegestaan met het werk aan te vangen voor de datum van<br />
aanvang, als bedoeld in paragraaf 7, lid 1 van de U.A.V.<br />
02. DATUM VAN AANVANG<br />
De datum van aanvang zal tijdens de eerste bouwvergadering in de notulen worden<br />
vastgesteld.<br />
01.02.08 UITVOERINGSDUUR, UITSTEL VAN OPLEVERING<br />
01. OPLEVERINGSTERMIJN<br />
De termijn waarbinnen het werk moet worden opgeleverd bedraagt in werkbare<br />
werkdagen: als aangegeven in de contractplanning<br />
01.02.09 OPNEMING EN GOEDKEURING<br />
02. BEPROEVING<br />
De beproeving geschiedt door de aannemer in aanwezigheid van de directie en dient<br />
om vast te stellen <strong>of</strong> het werk, <strong>of</strong> het desbetreffende onderdeel daarvan, op het gebied<br />
bestreken door de beproeving, voldoet aan hetgeen is overeengekomen, voor zover dit<br />
op het tijdstip van de beproeving mogelijk is.<br />
Projectnummer 54009 5
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.02.09 OPNEMING EN GOEDKEURING (vervolg)<br />
Aannemer en directie stellen in onderling overleg het tijdstip van de beproeving vast.<br />
Indien aannemer en directie niet komen tot gemeenschappelijke vaststelling van het<br />
tijdstip van de beproeving stelt de aannemer dit tijdstip vast en geeft van dit tijdstip<br />
ten minste acht dagen tevoren schriftelijk kennis aan de directie.<br />
Ten behoeve van de beproeving stelt de aannemer voor zijn rekening het nodige<br />
materieel en het personeel voor de bediening daarvan beschikbaar.<br />
De kosten van de voor de beproeving benodigde hoeveelheid water en energie zijn voor<br />
rekening van de aannemer.<br />
Door de ondertekening door de aannemer en de directie van het rapport waarin het<br />
beproevingsresultaat is opgenomen staan de resultaten van de beproeving vast.<br />
Indien de directie tijdens de beproeving niet aanwezig is geweest, staan de resultaten<br />
van de beproeving vast door de enkele vermelding daarvan in het rapport waarin het<br />
beproevingsresultaat is opgenomen.<br />
Indien op grond van de beproeving is vastgesteld dat het werk, op het gebied bestreken<br />
door de beproeving, niet voldoet aan hetgeen is overeengekomen, zal, nadat de<br />
aannemer de nodige verbeteringen heeft aangebracht, de beproeving worden herhaald.<br />
Op deze herhaalde beproeving is het hierboven vermelde van overeenkomstige<br />
toepassing, met dien verstande dat in dit geval de kosten van water en energie,<br />
benodigd voor de beproeving, voor rekening van de aannemer zijn.<br />
Indien op grond van de beproeving is vastgesteld dat het werk, op het gebied bestreken<br />
door de beproeving, voldoet aan hetgeen is overeengekomen en het werk ook overigens<br />
is voltooid, vindt opneming van het werk plaats.<br />
90. AANVULLENDE BEPROEVING<br />
- Tenzij het bestek anders bepaalt, geldt de beproeving niet voor onderdelen die,<br />
blijkens keuringen door <strong>of</strong> vanwege overheid, nutsbedrijven en/<strong>of</strong> andere instanties,<br />
naar het oordeel van de directie reeds aan de bestekseisen voldoen.<br />
- In geval van herhaalde beproeving zijn alle, door de directie hiervoor te maken,<br />
kosten voor rekening van de aannemer<br />
01.02.10 OPLEVERING<br />
01. OPLEVERING<br />
Het werk komt voor (deel)oplevering in aanmerking als:<br />
De werkzaamheden volgens dit bestek zijn opgenomen en goedgekeurd door de<br />
directie.<br />
Opleveringen zullen plaatsvinden per woningblok, waarbij de oplevertermijn op de<br />
opgeleverde ondelen in gaat.<br />
Tevens dienen alle in het bestek verlangde bescheiden, waaronder concept<br />
revisietekeningen, certificaten, logboeken, en financiële overzichten bij de directie<br />
zijn ingeleverd.<br />
De aannemer levert het werk, het werkterrein en de door hem gebruikte ruimten<br />
grondig schoongemaakt en opgeruimd op. Als, tengevolge van de uitvoering van zijn<br />
werkzaamheden, eigendommen en werken van opdrachtgever en/<strong>of</strong> derden zijn<br />
verontreinigd, dienen deze eveneens door de aannemer gereinigd te worden.<br />
90. ONDERHOUDSCONTRACTEN<br />
Bij de oplevering dient een voorstel voor een onderhoudscontract te worden overlegd<br />
voor het onderhoud van de aangebrachte installaties.Het betreft hier inspectie,<br />
perventief onderhoud en verhelpen van storingen.<br />
Inde <strong>of</strong>ferte dient teven te woren meegenomen het leveren en plaatsen van een<br />
eenvoudig kastje ten behoeve van het onderhoudslogboek, voorzien van de text<br />
"onderhoudslogboek Eco Energyinstallatie".<br />
Projectnummer 54009 6
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.02.11 ONDERHOUDSTERMIJN<br />
01. ONDERHOUDSTERMIJN<br />
De onderhoudstermijn bedraagt in maanden:<br />
12 maanden na eerste oplevering<br />
01.02.16 AFSLUITING, RECLAME<br />
01. FOTOGRAFEREN EN FILMEN<br />
Voor het maken van foto's, films <strong>of</strong> video-opnamen en dergelijke van het werk, het<br />
verlenen van medewerking daaraan en het geven van publiciteit inzake het werk, is<br />
toestemming van de opdrachtgever noodzakelijk.<br />
02. AFSLUITING, RECLAME<br />
Reclame mag uitsluitend geschieden op een bouwbord, in overleg met en na<br />
goedkeuring van de directie.<br />
01.02.18 KEURING VAN BOUWSTOFFEN<br />
90. KEURINGSBEWIJS<br />
Van alle bouwst<strong>of</strong>fen die met een keurmerk van een erkend instituut geleverd kunnen<br />
worden moet een geldig keuringsbewijs <strong>of</strong> een geldige kwaliteitsgarantie aan de<br />
directie worden overlegd.<br />
01.02.20 ZORG VOOR BOUWSTOFFEN<br />
01. ZORG VOOR BOUWSTOFFEN<br />
De aannemer draagt er zorg voor dat:<br />
- de te transporteren, op te slaan en te verwerken bouwst<strong>of</strong>fen volgens de<br />
voorschriften en adviezen van de fabrikant <strong>of</strong> leverancier worden uitgevoerd.<br />
01.02.22 GARANTIE VOOR EEN ONDERDEEL<br />
01. TE GARANDEREN ONDERDELEN<br />
Voor de volgende onderdelen wordt een garantie verlangd die moet gelden vanaf het<br />
gereedkomen van het onderdeel tot aan de oplevering van het werk en in aansluiting<br />
daarop gedurende de vermelde periode.<br />
Onderdeel: alle<br />
- te garanderen door: de aannemer<br />
- periode: 2 jaar voor de gehele installatie<br />
Indien voor bepaalde onderdelen een fabrieksgarantie geldt die langer duurt dan de<br />
genoemde periode geldt de duur van de fabrieksgarantie.<br />
Aanpassingen binnen deze 2 jaar welke noodzakelijk zijn voor een goede werking van<br />
de installatie zijn voor rekening van de aannemer.<br />
01.02.23 LOODSEN EN ANDERE HULPMIDDELEN<br />
01. LOODSEN EN ANDERE HULPMIDDELEN<br />
Ontpl<strong>of</strong>bare gasesen en voor de mens en dier giftige st<strong>of</strong>fen opslaan in aparte voor<br />
opslag geschikte ruimten, die slechts toegankelijk zijn voor de voor verwerking<br />
aangewezen personen<br />
01.02.26 ALGEMEEN TIJDSCHEMA, WERKPLAN<br />
01. ALGEMEEN TIJDSCHEMA<br />
Het in paragraaf 26, lid 1 van de U.A.V. genoemde algemeen tijdschema wordt<br />
verlangd.<br />
De indeling van de tijdsduur op het algemeen tijdschema moet worden aangegeven in<br />
kalenderweken.<br />
04. GEDETAILLEERD WERKPLAN<br />
Een gedetailleerd werkplan zoals bedoeld in paragraaf 26 lid 6 van de U.A.V wordt<br />
verlangd<br />
voor:<br />
Eisen werkplan:<br />
De indeling van de tijdsduur op het gedetailleerd werkplan moet worden aangegeven in<br />
Projectnummer 54009 7
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.02.26 ALGEMEEN TIJDSCHEMA, WERKPLAN (vervolg)<br />
werkbare werkdagen.<br />
Het gedetaileerde werkplan dient gebaseerd te zijn op de planningen het<br />
bouwplaatsprotocol<br />
Tijdstip waarop het werkplan moet worden ingediend: twee weken voor aanvang van<br />
de werkzaamheden.<br />
Zonodig aan te leveren aan coordinerend aannemer om op tenemen in de oevrall<br />
planning<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring: 3 stuks<br />
- goedgekeurde: 3 stuks<br />
01.02.31 VERBAND MET ANDERE WERKEN<br />
01. GEGEVENS VOOR DOOR DERDEN TE TREFFEN VOORZIENINGEN<br />
De aannemer verstrekt tijdig aan de directie de gegevens van de door derden ten<br />
behoeve van hem te treffen voorzieningen.<br />
02. COÖRDINATIE-OVEREENKOMST<br />
Zo spoedig mogelijk nadat de opdracht voor het werk aan de aannemer is verstrekt,<br />
wordt tussen de opdrachtgever, de aannemer en de derden een<br />
coördinatie-overeenkomst gesloten overeenkomstig het bij dit bestek gevoegde model.<br />
De aannemer is verplicht deze overeenkomst zonder voorbehoud te ondertekenen en<br />
aan de naleving daarvan zijn volle medewerking te verlenen. Deze overeenkomst<br />
wordt opgemaakt in enkelvoud en door alle partijen ondertekend. Het origineel (het<br />
door alle partijen ondertekende exemplaar) verblijft aan de opdrachtgever, de partijen<br />
ontvangen hiervan een door de opdrachtgever gewaarmerkte kopie.<br />
03. COÖRDINATIE<br />
Dit bestek betreft een onderdeel van een project.<br />
De coördinatie van het project zal worden verzorgd door de bouwkundig aannemer<br />
07. VANWEGE DE OPDRACHTGEVER GETROFFEN VOORZIENINGEN<br />
De aannemer moet de voorzieningen die vanwege de opdrachtgever zijn uitgevoerd zo<br />
spoedig mogelijk controleren, nadat hij door <strong>of</strong> namens de opdrachtgever van de<br />
voltooiing van die voorziening in kennis is gesteld. Van eventuele tekortkomingen stelt<br />
hij de directie terstond in kennis. De hogere kosten die een gevolg kunnen zijn van het<br />
niet ter kennis brengen van vorenbedoelde tekortkomingen, komen voor rekening van<br />
de aannemer, indien en voor zover hij deze tekortkomingen redelijkerwijze had<br />
behoren op te merken.<br />
01.02.35 VERREKENING VAN MEER EN MINDER WERK<br />
01. VERREKENING VAN MEER EN MINDER WERK<br />
- Het verrekenen van meer- en minder werk geschiedt volgens de rekenmethodiek,<br />
prijzen, opslagpercentages en uurlonen, zoals genoemd in de open begroting.<br />
- Materiaalprijzen en bewerkingstijden welke niet in de open begroting zijn vermeld<br />
behoeven de goedkeuring van de directie.<br />
- Prijsopgaven voor meer- en minderwerk dienen vooraf bij de directie te worden<br />
ingediend.<br />
- De aannemer heeft geen recht op verrekening van meerwerk, waarvan de<br />
uitvoering niet schriftelijk is opgedragen <strong>of</strong> in de notulen van de bouwvergadering<br />
is vastgelegd.<br />
- Meer- en minderwerk opgaven dienen volledig te worden gespecificeerd.<br />
90. MELDINGEN VAN MEER- EN MINDERWERK<br />
Indien de aannemer een mondelinge <strong>of</strong> schriftelijke opdracht, waaronder ook te<br />
verstaan tekeningen en opgaven van maten <strong>of</strong> hoeveelheden , geheel <strong>of</strong> gedeeltelijk als<br />
meer <strong>of</strong> minder werk beschouwt, zal hij, zonder de opdracht uit te voeren, dit uiterlijk<br />
binnen vijf werkdagen na ontvangst van deze opdracht schriftelijk bekend maken aan<br />
de directie.<br />
Indien de voortgang van het werk dit verlangt zal de melding voorlopig mondeling<br />
Projectnummer 54009 8
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.02.35 VERREKENING VAN MEER EN MINDER WERK (vervolg)<br />
geschieden.<br />
01.02.37 STELPOSTEN<br />
01. STELPOSTEN<br />
- De opdrachtgever behoudt zich het recht voor ten volle te beschikken over de in het<br />
bestek "in geld" uitgedrukte stelposten om daaruit aankopen te kunnen verrichten<br />
en te betalen.<br />
- Indien een stelpost niet <strong>of</strong> slechts gedeeltelijk wordt verwerkt zal het niet<br />
verwerkte gedeelte ten volle op de aanneemsom in mindering gebracht.<br />
- In afwijking van par. 37, lid 3 en 10 van de UAV zal verrekening van de stelposten<br />
plaats vinden zoals in 01.02.35.01 is bepaald.<br />
01.02.40 BETALING<br />
01. BETALING IN TERMIJNEN<br />
De termijnen, gebaseerd op de stand van het werk, zijn in procenten van de<br />
aannemingssom conform het onderstaande<br />
het aantal en de grootte van de termijnen wordt in onderling overleg tussen aannemer<br />
en opdrachtgever bepaald met een minimum van 18 termijnen, alsmede:<br />
opleveringstermijn 5%<br />
garantietermijn 5%<br />
De termijnen vervallen naarmate het werk vordert.<br />
De aannemer stelt een betalingsschema in de vorm van een puntenschema op en dient<br />
dit ter goedkeuring in bij de directie. In dit schema wordt de waarde van het<br />
uitgevoerde werk gerelateerd aan het werkschema.<br />
De opleveringstermijn vervalt nadat het werk is opgeleverd.<br />
De garantietermijn vervalt aan het einde van de onderhoud/servicetermijn, nadat de<br />
aannemer aan al zijn verplichtingen heeft voldaan.<br />
04. DECLARATIES<br />
De betaling zal geschieden nadat de aannemer een declaratie heeft ingediend.<br />
De aannemer moet de declaratie op naam van de opdrachtgever indienen bij de<br />
directie.<br />
Aantal: 2-voud<br />
01.02.<strong>42</strong> KORTINGEN<br />
01. KORTINGSBEDRAG<br />
De korting, bedoeld in paragraaf <strong>42</strong> van de U.A.V., bedraagt per dag:<br />
2 (twee) promille van de aanneemsom met een maximum van 10 (tien) procent<br />
01.02.43 VERPANDING OF CESSIE/ZEKERHEIDSSTELLING/VERZEKERING<br />
01. BANKGARANTIE<br />
De aannemer moet zo spoedig mogelijk nadat het werk aan hem is opgedragen, doch<br />
uiterlijk voor het verschijnen van de eerste termijn, een door een bank <strong>of</strong><br />
verzekeringsmaatschappij afgegeven bankgarantie ten behoeve van de opdrachtgever<br />
stellen.<br />
De bankgarantie moet worden opgesteld volgens het model dat als bijlage bij dit<br />
bestek is opgenomen.<br />
Projectnummer 54009 9
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.03 VERZEKERINGEN<br />
01.03.40 VERZEKERING DOOR DE OPDRACHTGEVER<br />
01. VERZEKERING DOOR DE OPDRACHTGEVER<br />
Door de opdrachtgever afgesloten verzekering:<br />
- CAR-verzekering<br />
De werkzaamheden vallen onder de doorlopenden CAR-verzekering van ENECO.<br />
OP deze verzekering is een eigen-risico voor de aannmer van toepassing van € 2267,-<br />
per schadegeval.<br />
Op aanvraag wordt een copy van de polis ter beschikking gesteld.<br />
01.03.90 ALGEMENE AANSPRAKELIJKHEIDSVERZEKERING<br />
01. ALGEMENE AANSPRAKELIJKHEIDSVERZEKERING<br />
De aannemer verzekerd de met het werk verband houdende aansprakelijheid van de<br />
verzekerden tegenover derden alsook onderling voor lichamelijk letsel alsmede<br />
overlijden en schade aan eigendommen en daaruit voortvloeiende vermogensschade tot<br />
minimaal € 2.270.000,- per gebeurtenis.<br />
Het eigen risico mag ten hoogste € 9.800,- per gebeurtenis <strong>of</strong> meerdere gebeurtenissen<br />
voortvloeiend uit een en de zelfde oorzaak.<br />
Het bedrag voor eigen risico mag niet gelden voor lichamelijk letsel <strong>of</strong> aantasting van<br />
de gezondheid, al dan niet de dood tot gevolge hebbende.<br />
Het eigen risico komt ten laste van de partij voor wiens risico de schade is op grond<br />
van de overeenkomst.<br />
De posis vermeld de aannemer als verzekeringnemer.<br />
Als verzekerden moeten nadrukkelijk vermeld worden:<br />
- de aannemer<br />
- de directie<br />
- de opdrachtgever<br />
- de adviseur<br />
- de nevenaannemers<br />
- de onderaannemers<br />
- de werknemers van bovengenoemde partijen<br />
In de polis moet een bepaleing worden opgenomen, waaruit blijkt dat de<br />
verzekerdenen hun werknemers, ondergeschiktenen personen voor wie de verzekerden<br />
aansprakelijk zijn, onderling en tenopzichte van elkaar als derden worden beschouwd .<br />
Een enventuele uitsluiting voor schade door mechanisch voortbewogen voertuigen mag<br />
niet gelden op <strong>of</strong> nabij het bouwterrein, doch de dekking voor de schade mag secundair<br />
zijn ten opzichte van elders lopende verzekeringen<br />
De aannmer geeft het bewijsstuk, waaruit het sluiten van de bvereiste verzekering<br />
blijkt, binnen veertien dagen na aanvang van het werk aan de opdrachtgever.<br />
Schadepenningen zullen door de verzekeraars worden uitgekeerd aan de partij die de<br />
schade geleden heeft.<br />
Projectnummer 54009 10
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.04 VERREKENING WIJZIGING KOSTEN EN PRIJZEN<br />
01.04.10 VERREKENING WIJZIGING KOSTEN EN PRIJZEN<br />
01. WIJZIGING KOSTEN EN PRIJZEN NIET VERREKENBAAR<br />
Niet verrekenbaar zijn wijzigingen van:<br />
- loonkosten.<br />
- materiaalprijzen.<br />
- brandst<strong>of</strong>prijzen.<br />
- huren.<br />
- vrachten.<br />
- en alle verdere kosten op het werk en uitvoering drukkende.<br />
- afkoopsom prijsvast einde werk aangeven op het specificatieformulier<br />
01.05 TEKENINGEN EN BEREKENINGEN<br />
01.05.10 TEKENINGEN EN BEREKENINGEN<br />
01. AANTALLEN<br />
Van de tekeningen en andere gegevens benodigd voor de uitvoering van het werk<br />
worden aan de aannemer kosteloos kopieën verstrekt.<br />
Aantal: 1<br />
Indien de aannemer meer exemplaren wenst, komen de kosten hiervan voor zijn<br />
rekening.<br />
02. VERANTWOORDELIJKHEID VOOR TEKENINGEN<br />
De aannemer blijft, ook na goedkeuring door de directie, verantwoordelijk voor de<br />
door hem gemaakte tekeningen betreffende de constructies, werkwijze, maatvoering en<br />
dergelijke.<br />
03. WIJZIGINGEN IN TEKENINGEN<br />
Wanneer door de aannemer wijzigingen in de door hem gemaakte tekeningen worden<br />
aangebracht wordt dit op het origineel bij het onderschrift aangegeven door middel van<br />
een nummer- en datumwijziging. De aannemer registreert en distribueert deze<br />
tekeningen.<br />
Oudere versies van tekeningen komen daardoor te vervallen.<br />
04. VERANTWOORDELIJKHEID VOOR BEREKENINGEN<br />
De aannemer blijft, ook na goedkeuring door de directie, verantwoordelijk voor de<br />
door hem gemaakte berekeningen.<br />
90. SPARINGSTEKENINGEN<br />
De aannemer vervaardigt de voor het werk benodigde sparingstekeningen en verstrekt<br />
deze, na goedkeuring door de constructeur, tijdig aan de aannemer van de bouwkundige<br />
werken.<br />
Op deze tekeningen moeten tevens de te verwachten gewichtsbelastingen zijn<br />
aangegeven.<br />
De procedure van vervaardiging en distributie van de sparingstekeningen behoeft de<br />
goedkeuring van de directie.<br />
Aantal te verstrekken exemplaren: 4 stuks.<br />
91. BESTEKTEKENINGEN<br />
De directie verstrekt aan de aannemer het bestek en de bijbehorende bestektekeningen<br />
in enkelvoud.<br />
De bestektekeningen kunnen niet als werktekening worden beschouwd.<br />
Indien beschikbaar kunnen ook, tegen betaling, de bestektekeningen in digitale vorm<br />
(Autocad 14/200iLT, dan wel op dxf-format ) worden verstrekt. De kosten hiervan<br />
bedragen EURO 12,-- (per file/bestektekening. De bestanden worden na ontvangst<br />
van de betaling afgegeven.<br />
Projectnummer 54009 11
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.05.10 TEKENINGEN EN BEREKENINGEN (vervolg)<br />
92. WERKTEKENINGEN, SCHEMA'S, BEREKENINGEN<br />
De aannemer maakt werktekeningen op een minimale schaal van 1:50, op basis van de<br />
laatste bouwkundige onderleggers.Detailtekeningen en indelingstekeningen van<br />
technische ruimten op een schaal van 1:20.<br />
Verschillen tussen de laatste bouwkundige onderleggers en de onderleggers die voor de<br />
bestekstekeningen zijn gebruikt, bespreekt de aannemer met de directie.<br />
Eventuele wijzigingen op de bestektekeningen, die gevraagd worden door nutsbedrijven<br />
<strong>of</strong> andere instanties, <strong>of</strong> wijzigingen die ontstaan door coördinatie met andere<br />
disciplines worden door de aannemer op de werktekeningen verwerkt.<br />
- Indien de directie dit verlangt, zorgt de aannemer voor de opstellings-,<br />
samenstellings-, constructie en detailtekeningen, alsmede tekeningen van de ten<br />
behoeve van het werk noodzakelijke bouwkundige voorzieningen en overlegt deze<br />
tekeningen tijdig ter goedkeuring aan de directie.<br />
Bevestigingen en verankeringen moeten duidelijk zijn aangegeven.<br />
Op deze tekeningen moeten tevens de te verwachten belastingen zijn aangegeven.<br />
Eventueel vereiste bijbehorende berekeningen moeten worden bijgevoegd.<br />
- Zo spoedig mogelijk, doch uiterlijk binnen twee weken na de datum van het<br />
indienen van de werktekeningen, schema's en berekeningen, stelt de directie de<br />
aannemer schriftelijk in kennis van haar beslissing inzake deze documenten.<br />
- Voordat de directie de werktekeningen, schema's en berekeningen heeft<br />
beoordeeld, mag niet met de vervaardiging <strong>of</strong> uitvoering worden gestart. De<br />
goedkeuring door de directie ontheft de aannemer niet van enige verplichting <strong>of</strong><br />
verantwoordelijkheid.<br />
- De aannemer vervaardigt de volledige werkings-, bedradings- en leiding-schema's<br />
van de in de regel-, schakelkasten en bedieningspanelen aan te brengen inrichtingen.<br />
93. REVISIEBESCHEIDEN<br />
De aannemer vervaardigt revisietekeningen en revisie schema's met bijbehorende<br />
omschrijving van de installaties alsmede de onderhouds- en bedieningsvoorschriften.<br />
Het bedieningsvoorschrift dient tenminste te bevatten:<br />
a. omschrijving van de werking van de installaties;<br />
b. omschrijving van de bediening van de installaties;<br />
c. aanwijzingen voor periodiek onderhoud;<br />
d. instelgegevens van (in)regelende apparatuur;<br />
e. meetgegevens;<br />
f. documentatie;<br />
g. garantie certificaten;<br />
h. overzicht van geïnstalleerde materialen;<br />
i. lijst van fabrikaten en leveranciers;<br />
j. de voor het werk gemaakte berekeningen, de dor derden verstrekte<br />
goedkeuringsbescheiden, inregel- en meetrapporten, brandwerendheidscertificaten,<br />
rapportage volgens NEN 3140 e.d.<br />
De revisiebescheiden dienen als volgt te worden ingediend:<br />
a. revisietekeningen en onderhouds- en bedieningsvoorschrift in 4-voud op te nemen in<br />
4 ringsordners;<br />
b. digitale bestanden, op CD-rom, van de revisietekeningen in 4-voud.<br />
Alle stukken dienen in de Nederlandse taal te zijn gesteld.<br />
De aannemer levert de revisiebescheiden in concept (enkelvoud) in bij de oplevering.<br />
Projectnummer 54009 12
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
01.05.10 TEKENINGEN EN BEREKENINGEN (vervolg)<br />
De definitieve revisiebescheiden dienen te worden aangeleverd binnen 4 weken na de<br />
oplevering.<br />
01.06 ARBEIDSOMSTANDIGHEDEN<br />
01.06.10 ARBEIDSOMSTANDIGHEDEN<br />
01. VEILIGHEIDS- EN GEZONDHEIDSPLAN<br />
Het veiligheids- en gezondheidsplan (V&G-plan) als bedoeld in artikel 2.27 van het<br />
Arbeidsomstandighedenbesluit (Stb 1999.451) maakt deel uit van dit bestek.<br />
03. V&G-COÖRDINATIE UITVOERINGSFASE DOOR DERDEN<br />
Ingevolge het bepaalde in artikel 2.37 van het Arbeidsomstandighedenbesluit (Stb<br />
1999.451) worden één <strong>of</strong> meer coördinatoren (V&G-coördinatoren) voor de<br />
uitvoeringsfase aangesteld die uitvoering geven aan de coördinatietaken genoemd in<br />
artikel 2.34 van het Arbeidsomstandighedenbesluit door de:<br />
- bouwkundig aannemer.<br />
Projectnummer 54009 13
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
E. TECHNISCHE BEPALINGEN EN WERKBESCHRIJVING<br />
05 BOUWPLAATSVOORZIENINGEN<br />
05.00 ALGEMEEN<br />
05.00.24 EISEN EN UITVOERING: BOUWPLAATSINRICHTING<br />
01. INDELING EN GEBRUIK WERKTERREIN<br />
Ten aanzien van de indeling en het gebruik van het werkterrein gelden de volgende<br />
beperkingen:<br />
De plaats van keten, opslagruimtes, afvalcontainers etc. dient met de aannemer van de<br />
bouwkundige werken te worden afgestemd.<br />
02. AFVOER VAN AFVAL<br />
Afval moet dagelijks van het werkterrein worden verwijderd en in de daartoe<br />
bestemde containers worden gedeponeerd (bouwplaats opruimen).<br />
De aannmer dient zelf te voorzien in de noodzakelijke maatregelen voor het afvoeren<br />
van het afval conform de eisen van de van de gemeentelijke overheid.<br />
Een en ander voor rekening van de aannemer<br />
03. VERBRANDEN VUIL EN ANDERE MATERIALEN<br />
Het verbranden van vuil en andere materialen op het werkterrein is niet toegestaan.<br />
05.31 LOODSEN EN KETEN<br />
05.31.10-a BOUWKEET<br />
0. BOUWKEET<br />
Ruimte(n):<br />
De aannemer verzorgt voor eigen gebruik:<br />
- de nodige keten, afsluitbare ruimten, schaft- en toiletruimten, inclusief de eventuele<br />
aansluiting daarvan op de nutsvoorzieningen;<br />
.01 TIJDELIJKE VOORZIENINGEN<br />
()<br />
05.32 BESCHIKBAARSTELLING MATERIEEL<br />
05.32.10-a WERKTUIG<br />
0. WERKTUIG, BESCHIKBAARSTELLING<br />
De aannemer verzorgt voor eigen gebruik:<br />
- steigerwerk en de daarbij eventueel noodzakelijke tijdelijke voorzieningen aan de<br />
ondergrond;<br />
- alle noodzakelijke hulpmiddelen en tijdelijke voorzieningen die voor een goede en<br />
veilige werksituatie nodig zijn.<br />
- het voor zijn werkzaamheden noodzakelijke horizontale en vertikale transport.<br />
Projectnummer 54009 14
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
05.32.10-a WERKTUIG (vervolg)<br />
.01 TIJDELIJKE VOORZIENINGEN<br />
()<br />
05.34 SCHOONMAKEN EN PREVENTIEF ONDERHOUD NIEUW WERK<br />
05.34.10-a VERWIJDEREN VERONTREINIGINGEN NIEUW WERK<br />
0. VERWIJDEREN STICKERS/MERKTEKENS<br />
Het werk bezemschoon opleveren.<br />
Stickers, merktekens, graffiti, verfresten, bouwvuil e.d. verwijderen.<br />
Schakelkasten, verlichtingsarmaturen, laskasten, e.d. geheel st<strong>of</strong>vrij opleveren.<br />
Ketels, luchtbehandelingskasten, e.d. dienen schoon te worden opgeleverd.<br />
.01 ALGEMEEN<br />
()<br />
Projectnummer 54009 15
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
10 STUT- EN SLOOPWERK<br />
10.31 TOTAAL SLOOPWERK<br />
10.31.09-a SLOOPWERK<br />
0. SLOOPWERK<br />
Uitgangspunt bij het slopen van de installaties zal zijn dat de woningen in gebruik<br />
blijven waarbij de installaties (warmte water electra ) slechts voor korte periodes<br />
buiten gebruik mogen zijn.<br />
Hiervoor wordt tevens verwezen naar het projectplan uitvoering (bijlage 8)<br />
Het slopen van de bestaande installaties dient daarom in goede coordinatie met de<br />
aanleg van de nieuwe installatie te worden uitgevoerd. Hierbij te denken aan het in<br />
fases vervangen van installatieonderdelen, waarbij het buitengebruik zijn van<br />
installatieonderdelen vooraf aan de bewoners kenbaar gemaakt wordt.<br />
Een en ander om de overlast voor de bewoners tot een minimum te beperken.<br />
Te slopen installaties:<br />
Ketelhuis,<br />
- de bestaande cv-ketels slopen en opdelen in verwijderbare delen (let op minimale<br />
doorvoer openingen in de gevel).<br />
- gasleiding vanaf de invoer in het ketelhuis tot op de ketels<br />
- rookagsafvoeren vanaf de ketels tot op de bouwkundige schacht<br />
- regeltechniek geheel vervangen<br />
- CV-leidingen, verdeler en appendages tot in het gallerijplafond<br />
- de warmwateropwekking (boiler en TSA) inclusief regeltechniek en<br />
warmwaterleidingen tot in het galerijplafond.<br />
- de koudwaterleidingen vanaf de hydr<strong>of</strong>oor tot in het galerijplafond<br />
Gallerij plafond<br />
- CV-transportleidingen met appendages<br />
- koudwater en warmwaterleidingen (toevoer en recirculatie) met appendages tot in<br />
de galerijwoningen<br />
Woningen deel Eneco<br />
- de verdeelstrangen in de woningkasten voor CV, koudwater en warmwater(toevoer<br />
en recirculatie) naar de boven en ondergelegen woningen.<br />
Projectnummer 54009 16
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
51 BINNENRIOLERING<br />
51.00 ALGEMEEN<br />
51.00.50 BIJBEHORENDE VERPLICHTINGEN: ALGEMEEN<br />
90. BOUWKUNDIGE WERKZAAMHEDEN<br />
De voor de installatie benodigde werkzaamheden dienen door de installateur in zijn<br />
aanbieding te worden opgenomen.<br />
Tot de werkzaamheden van de installateur van dit bestek behoren mede<br />
het afwerken van de leidingdoorvoeren door bouwkundige constructies, overeenkomstig<br />
de eisen welke gesteld worden aan de constructie t.a.v. brandwerendheid,<br />
geluiddemping, water- en gasdichtheid.<br />
91. BEMONSTERING<br />
Op verzoek van de directie kan bemonstering van alle voorkomende<br />
installatieonderdelen verlangd worden.<br />
51.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN<br />
51.11.10-a BINNENRIOLERING<br />
0. BINNENRIOLERING<br />
In het ketelhuis dient een condensafvoersysteem te worden aangelegd vanaf de ketels<br />
boilers en inlaadcombinaties tot op een bestaand afvoerpunt.<br />
Een en ander uit te voeren in PVC, en voorzien van de noodzakelijke watersloten .<br />
Afvoeren van de overdrukventielen op de ketels uitvoeren in koper over de eerste 2<br />
meter en aansluiten op het afvoersysteem.<br />
.01 BINNENRIOLERING<br />
()<br />
51.12 TEKENINGEN EN BEREKENINGEN<br />
51.12.10-a TEKENINGEN<br />
0. VERANTWOORDELIJKHEID VOOR TEKENINGEN<br />
De aannemer blijft, ook na goedkeuring door de directie, verantwoordelijk voor de<br />
door hem gemaakte tekeningen betreffende de constructies, werkwijze maatvoering en<br />
dergelijke.<br />
.01 BINNENRIOLERING<br />
()<br />
T.b.v. de binnenriolering<br />
51.12.10-b TEKENINGEN<br />
0. TEKENING BINNENRIOLERING<br />
Door de aannemer te vervaardigen tekening(en) op de tekening(en) moet zijn aangegeven:<br />
- het leidingbeloop met leidingdiameters.<br />
- het materiaal van de leiding.<br />
- de plaats van appendages.<br />
- de plaats van vuilwaterpompunits.<br />
- plaats, type en capaciteit van putten en afscheiders.<br />
Projectnummer 54009 17
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
51.12.10-b TEKENINGEN (vervolg)<br />
- maatvoering.<br />
- te isoleren delen.<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring: in 2-voud<br />
- goedgekeurde: in 3-voud<br />
.01 BINNENRIOLERING<br />
()<br />
51.12.20-a INSTALLATIE-BEREKENING<br />
0. BINNENRIOLERINGSINSTALLATIE<br />
Door de aannemer te vervaardigen berekening.<br />
Van de nieuw aan te leggen rioleringleidingen<br />
Berekeningsmethode overeenkomstig NEN 3215-97:<br />
Berekeningsmethode overeenkomstig NTR 3216-97:<br />
Uitgangspunten:<br />
- leidingafschot 5 mm/m<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring (st.): 2 maal<br />
- goedgekeurde (st.): 3 maal<br />
- verstrekkingsvorm: papier<br />
.01 BINNENRIOLERING<br />
()<br />
51.31 METALEN BUISLEIDINGEN<br />
51.31.40-a AANLEG METALEN BUISLEIDING, KOPEREN BUIS<br />
0. AANLEG METALEN BUISLEIDING<br />
1. KOPEREN BUIS, NAADLOOS (NEN-EN 1057-96)<br />
Fabrikaat: Viega Pr<strong>of</strong>ipress<br />
Materiaal: half hard.<br />
<strong>No</strong>minale buitendiameter (mm): te bepalen<br />
Wanddikte (mm): behorend bij diameter<br />
Bijbehorende Pr<strong>of</strong>ipress<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
.01 BINNENRIOLERING<br />
()<br />
koperen afvoerleidingen , over de eerste 2 meter van de afvoeren op de<br />
overdrukventielen van de CV-ketels.<br />
51.32 KUNSTSTOF BUISLEIDINGEN<br />
51.32.10-a AANLEG KUNSTSTOF BUISLEIDING, KUNSTSTOF BUIS<br />
0. AANLEG KUNSTSTOF BINNENRIOLERINGSLEIDING<br />
Aanlegwijze:<br />
- peil:<br />
- ligging in het ketelhuis.<br />
- overeenkomstig NEN 3215-97<br />
- overeenkomstig NTR 3216-97<br />
Projectnummer 54009 18
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
51.32.10-a AANLEG KUNSTSTOF BUISLEIDING, KUNSTSTOF BUIS (vervolg)<br />
- overeenkomstig NEN 3213-81<br />
Verbindingswijze:<br />
- lijmverbinding<br />
- manchetverbinding<br />
Bevestigingswijze:<br />
- gebeugeld<br />
- beugelafstand verticale leidingen: veelvoud van buitenmiddellijn<br />
- beugelafstand liggende leidingen: veelvoud van buitenmiddellijn<br />
Beschermingswijze:<br />
- beschermbuis bij doorvoer bouwkundige constructie:<br />
lengte ten minste dikte afgewerkte constructie.<br />
Aansluitingen:<br />
- aansluitpunten zoals op bestektekening is aangegeven<br />
- afvoerpunten voor sanitaire toestellen: montagehoogte t.o.v. afgewerkte vloer (m):<br />
1. KUNSTSTOF BUIS, ONGEPLASTICEERD PVC (BRL 2001/01)<br />
Fabrikaat: Dyka, volledig recyclebaar PVC<br />
<strong>No</strong>minale buitenmiddellijn (mm): volgens nadere berekeningen<br />
Wanddikte:<br />
Kleur (RAL): 7037.<br />
Toebehoren:<br />
Gegalvaniseerde beugels met rubberinlage<br />
Kunstst<strong>of</strong> buizen en hulpstukken leveren onder KOMO certificaat met<br />
KOMO-keurmerk.<br />
.01 BINNENRIOLERING<br />
()<br />
Alle nieuw aan te leggen rioleringsleidingen en aansluitingen op de te handhaven<br />
leidingdelen.<br />
Projectnummer 54009 19
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52 WATERINSTALLATIES<br />
52.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN<br />
52.11.10-a KOUD-WATERTAPINSTALLATIE<br />
0. KOUD-WATERTAPINSTALLATIE<br />
Het koudwaterdistributienet geheel nieuw aanleggen vanaf de bestaande hydr<strong>of</strong>oor in<br />
de ketelhuizen tot in meterkasten in de portiek van de woning.<br />
In de meterkast een aftakking aanbrengen ten behoeve van de woning voorzien van<br />
verzegelbare kogelkranen, een doorstroombegrenzer een controleerbare keerklep en<br />
een watermeter (watermeter levering nutsbedrijf).<br />
De bestaande koudwateraansluiting vanaf de nutsinvoer tot op de hydr<strong>of</strong>oor handhaven,<br />
de bestaande hydr<strong>of</strong>oor in overleg met de leverancier opknappen.<br />
Eventuele lekkages verhelpen en verroeste onderdelen vervangen.<br />
Na de hydr<strong>of</strong>oor het koudwater verdelen in 3 groepen te weten<br />
- 2x koudwatervoeding woningen<br />
- 1x koudwatervoeding warmwaterbereiding te vorzien van een watermeter (levering<br />
nutsbedrijf).<br />
.01 WATERLEIDINGNET<br />
()<br />
52.11.20-a WARM-WATERTAPINSTALLATIE<br />
0. WARM-WATERTAPINSTALLATIE<br />
De warmwateropwekking en het distributienet geheel nieuw aanleggen vanuit de<br />
ketelhuizen tot in kast in de hal van de woning. In de kast een aftakking aanbrengen<br />
ten behoeve van de woning voorzien van verzegelbare kogelkranen, een<br />
doorstroombegrenzer een controleerbare keerklep en een watermeter.<br />
De warmwateropwekking bestaat uit een zonneboilersysteem (buffervaten en een<br />
voorverwarmingsboiler) met een boileroplaadssysteem als naverwarmingsboiler.<br />
Globale systeemomschrijving:<br />
Op het dak zonnepanelen plaasten voorzien van een watercirculatieleiding met<br />
buffervaten. Afhankelijk van het gemeten temperatuurverschil tussen de zonnepanelen<br />
en het water wordt pomp in de leiding aangeschakeld en het water door de panelen<br />
gepompt. Om bevriezing van het water te voorkomen zal het water bij stilstand van de<br />
pomp onder afschot weglopen in de buffervaten.<br />
Middels de circulatieleiding wordt het warme water vanuit de collectoren opgeslagen<br />
in de buffertvaten, zodat onafhankelijk van de afname optimaal gebruik gemaakt kan<br />
worden van de geleverde zonnewarmte.<br />
Vanuit de buffervaten wordt het warmewater gebruikt voor het opladen van de<br />
voorverwarmingsboiler (TSA met boilervaten).<br />
Deze boiler wordt bij afname van warmwater gevuld met koud drinkwater via de<br />
hydr<strong>of</strong>oor. Afhankelijk van de watertemperatuur in de boilervaten en de aanwezige<br />
warmte in de buffervaten wordt warmte overdragen via de TSA op het koude<br />
drinkwater.<br />
Voor het geval er geen <strong>of</strong> onvoldoende "zonne" warmte aanwezig is om het afgenomen<br />
warmwater op temperatuur te houden wordt het warme drinkwater middels een<br />
boileroplaadsysteem naverwarmd door de cv-ketels.<br />
Projectnummer 54009 20
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.11.20-a WARM-WATERTAPINSTALLATIE (vervolg)<br />
Het warmwaterdistribitienet aanbrengen middels een verdeler gescheiden in 2 groepen<br />
ten behoeve van de woningen. De groepen verdelen over de beide zijden van het<br />
ketelhuis. De distubtienetten circulerend uitvoeren en middels een verzamelaar<br />
terugvoeren naar de boiler.<br />
Beide circulatienetten uitvoeren als dubbel gevoed systeem.<br />
Dit systeem is zodanig opgezet dat bij grote afname ook de recirculatieleiding dienst<br />
doet als voedingsleiding (stromingsrichting draait om).<br />
Hiervoor dienen een aantal bypass leidingen te worden aangebracht rondom de<br />
recirculatiepompen en worden de pompen in de aanvoer geplaatst.<br />
Zonodig zal ook over de inregelventielen op de woningstrangens een bypass met<br />
terugslagklep moeten worden aangebracht, tenzij berekening aantoond dat dit niet<br />
nodig is (volgt uit het verschil in cappaciteit tussen recirculeren en voeden).<br />
In elke aftakking naar een woningstrang dient zowel in de warmwater als in de<br />
recirculatieleiding een veiligheidsklep te woren ingebouwd welke sluit bij het<br />
wegvallen van de koudwaterdruk<br />
Na de oplaadboiler een veiligheidsklep opnemen welke de warmwatertoevoer sluit bij<br />
een uitrede temperatuur onder de 55 C° en weer opend boven de 55 °.<br />
.01 WATERLEIDINGNET<br />
()<br />
52.12 TEKENINGEN EN BEREKENINGEN<br />
52.12.10-a TEKENINGEN<br />
0. VERANTWOORDELIJKHEID VOOR TEKENINGEN<br />
De aannemer blijft, ook na goedkeuring door de directie, verantwoordelijk voor de<br />
door hem gemaakte tekeningen betreffende de constructies, werkwijze maatvoering en<br />
dergelijke.<br />
.01 WATERLEIDINGNET<br />
()<br />
52.12.10-b TEKENINGEN<br />
0. TEKENINGEN WATERINSTALLATIE<br />
door de aannemer te vervaardigen tekening(en) op de tekening(en) moet zijn<br />
aangegeven:<br />
- het leidingbeloop met diameters:<br />
nieuwe leidingloop: door installateur te bepalen; leidingloop is indicatief op de<br />
bestekstekening aangegeven.<br />
diameter: door de aannemer te bepalen en middels berekening aantonen.<br />
- het materiaal:<br />
- de plaats van appendages:<br />
- de maatvoering:<br />
de maatvoering door de installateur te bepalen.<br />
- de te isoleren, respectievelijk geïsoleerde installatiedelen:<br />
aantal te verstrekken exemplaren:<br />
- ter goedkeuring: 2<br />
- goedgekeurde: 3<br />
Tijdstip van levering: voor aanvang van de werkzaamheden.<br />
Projectnummer 54009 21
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.12.10-b TEKENINGEN (vervolg)<br />
.01 WATERLEIDINGNET<br />
()<br />
52.12.20-a INSTALLATIE-BEREKENING<br />
0. WATERINSTALLATIE<br />
Door de aannemer te vervaardigen berekening:<br />
Van de koud- en warmwaterleidingen<br />
Berekeningsmethode volgens Q wortel (n)<br />
Uitgangspunten:<br />
- koudwaterleidingen max. snelheid 1 m/s.; max dP 1 kPa<br />
- warmwater(circulatie)leidingen max. snelheid 0.7 m/s.; max dP 1 kPa<br />
- maximale opbrengst warmwater per wonig 12 l/min.<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring: 2<br />
- goedgekeurde: 3<br />
.01 WATERLEIDINGNET<br />
()<br />
52.13 BEPROEVEN, INREGELEN, IN BEDRIJF STELLEN EN CONTROLEREN<br />
52.13.10-a BEPROEVEN/INREGELEN<br />
0. WATERINSTALLATIE<br />
Beproeven.<br />
Onderdelen:<br />
- koud- warm- en de warmtapwatercirculatie-installatie.<br />
Methode: volgens NEN 1006+c90<br />
Uitgangspunten:<br />
NEN 1006 en wensen directie.<br />
voordruk van 100 kPa ter plaatse van de douche in de woningen<br />
capaciteit warmtapwater 12 l/min (CW6) .<br />
Uitvoering door:<br />
aannemer<br />
Tijdstip:<br />
voor de ingebruikname<br />
4. MEETRAPPORT<br />
Door de aannemer te verstrekken meetrapporten:<br />
meting van de tapwatertemperatuur van het meest afgelegen tappunt<br />
meting van de wachttijd van het warmwater<br />
aantal te verstrekken exemplaren: 2-voud<br />
tijdstip van verstrekking: voor de oplevering van de gehele installatie<br />
5. BEPROEVINGS-/TESTRAPPORT<br />
het rapport omvat de beproeving van<br />
- het koud- en warmtapwaternet<br />
- ingebruikname rapport hydr<strong>of</strong>oor<br />
in het beproevingsrapport moeten ten minste zijn vermeld de controle van de<br />
genoemde uitgangspunten.<br />
bij het rapport moeten tenminste de schema's bijgevoegd zijn van de complete<br />
waterinstallatie<br />
tijdstip van verstrekking voor de ingebruikname<br />
Projectnummer 54009 22
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.13.10-a BEPROEVEN/INREGELEN (vervolg)<br />
.01 WATERLEIDINGNET<br />
()<br />
52.31 METALEN BUISLEIDINGEN<br />
52.31.10-a AANLEG METALEN BUISLEIDING, KOPEREN BUIS<br />
0. AANLEG METALEN WATERLEIDING<br />
Aanlegwijze:<br />
- voor montage van leidingen en hulpstukken deze ontdoen van verontreinigingen,<br />
scherpe kanten en bramen.<br />
- ligging<br />
leidingen naar en van de collectoren onder afschot aanbrengen 1:100.<br />
- leidingdoorvoeren in het zicht afdekken met rozetten<br />
- volgens VEWIN Werkblad<br />
Verbindingswijze:<br />
- klemverbinding Viega Pr<strong>of</strong>ipress<br />
Bevestigingswijze:<br />
- gebeugeld, beugels van messing met rubber inlage<br />
leidingen naar en van de collectoren onder afschot aanbrengen 1:100, gebeugeld aan de<br />
collectorframes (niet boren,lassen <strong>of</strong> slijpen) <strong>of</strong> afgesteund op betontegels op het dak .<br />
Beschermingswijze:<br />
- beschermbuis<br />
geribde mantelbuis<br />
leidingen welke in vloeren en wanden worden weggewerkt dienen te worden voorzien<br />
van flexibele geribde P.E. beschermmantel.<br />
- beschermbuis bij doorvoer bouwkundige constructie:<br />
lengte ten minste dikte afgewerkte constructie.<br />
- beschermbuis bij doorvoer steenachtige vloer:<br />
bovenkant ten minste 50 mm boven afgewerkte vloer.<br />
1. KOPEREN BUIS, NAADLOOS (KIWA KE 57-67)<br />
Buitenmiddellijn (mm): door aannemer te bepalen<br />
Leveringstoestand: halfhard.<br />
Hulpstukken:<br />
de benodigde pr<strong>of</strong>ipress hulpstukken.<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
beugels ( NEN 2286) met rubber inlage<br />
benodigde hulp en bevestigingsmateriaal<br />
leidngen voorzien van de benodigde expansie voorzieningen<br />
.01 KOUD-WATERTAPINSTALLATIE<br />
()<br />
alle nieuw aan te leggen koudwaterleidingen zoals globaal op de bestekstekeningen is<br />
aangegeven.<br />
.02 WARM-WATERTAPINSTALLATIE<br />
()<br />
alle nieuw aan te leggen warm-, recirculatie - en zonneboilerleidingen zoals globaal<br />
op de bestekstekeningen is aangegeven.<br />
Projectnummer 54009 23
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.31.10-b AANLEG METALEN BUISLEIDING, KOPEREN BUIS<br />
0. AANLEG METALEN BUISLEIDING<br />
1. KOPEREN BUIS, GEÏSOLEERD, MANTEL<br />
Fabrikaat: Weijers Waalwijk<br />
Type Calcopper Duo<br />
Materiaal koper<br />
Isolatie:<br />
- materiaal PUR<br />
Mantel:<br />
- materiaal LDPE<br />
Toebehoren:<br />
- bevestigingsmiddelen beugels<br />
- koppelingen Viega Pr<strong>of</strong>ipress, separaat te isoleren<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
Voorgeïsoleerde distributie leidingen warm-en recirculatiewater boven het<br />
galerijplafond.<br />
52.40 POMPEN EN APPARATEN<br />
52.40.10-a TAPWATERPOMP<br />
0. TAPWATERPOMP<br />
Fabrikaat: Grundfos.<br />
Pakkingbusloze tapwaterpomp.<br />
Type: UPS-B<br />
Medium temperatuur (°C): max 130<br />
Debiet (m3/h): te bepalen, uitgangspunt is 0,5 l/min per m² collectoroppervlak<br />
Druktrap (PN):<br />
Materiaal huis: brons.<br />
Aansluitingen:<br />
- diameter:<br />
Elektromotor:<br />
- aansluitspanning (V):<br />
Toebehoren:<br />
- tegenflenzen<br />
- koppelingen<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
Circulatiepompen zonneboilerinstallatie P1 , P2<br />
52.40.10-b TAPWATERPOMP<br />
0. TAPWATERPOMP<br />
Fabrikaat: Grundfos.<br />
Pakkingbusloze tapwaterpomp.<br />
Type: UPS-B<br />
Medium temperatuur (°C): max 80<br />
Debiet (m3/h): te bepalen<br />
Druktrap (PN):<br />
Materiaal huis: brons.<br />
Aansluitingen:<br />
- diameter:<br />
Elektromotor:<br />
- aansluitspanning (V):<br />
Toebehoren:<br />
Projectnummer 54009 24
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.40.10-b TAPWATERPOMP (vervolg)<br />
- tegenflenzen<br />
- koppelingen<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
Circulatiepomp zonneboilerinstallatie P3<br />
Recirculatiepompen warmwatergroepen P5, P6<br />
Oplaadpomp voor- en naverwarmingsboiler P4<br />
52.40.20-a DRUKVERHOGINGSPOMP<br />
0. DRUKVERHOGINGSPOMP<br />
Fabrikaat: DAB bestaand<br />
Medium: tapwater;<br />
Debiet (m3/h):<br />
Opvoerhoogte (kPa):<br />
Druk (kPa):<br />
Toebehoren:<br />
In overleg met leverancier pompen reviceren <strong>of</strong> vervangen.<br />
.01 WATERLEIDINGNET<br />
()<br />
Bestaande drukverhogingsunits in de ketelhuizen, op te nemen als stelpost € 2500,- per<br />
ketelhuis.<br />
52.51 VOORRAADTOESTELLEN<br />
52.51.30-a INDIRECT VERWARMDE BOILER<br />
0. ZONNE-ENERGIE OPSLAGVAT<br />
Fabrikaat: Rebac Alkmaar (tel 072 5405858)<br />
Inhoud (dm3):<br />
Inhoud opslagvaten:<br />
Ketelhuis 1: 4x 2500 liter<br />
Ketelhuis 2: 2x 2400 liter en 2x 3700 liter<br />
Ketelhuis 3: 2x 3200 en 3x 2800 liter<br />
Ketelhuis 4: 5x 3200 liter<br />
Vanwege de transportruimte is de maximale diameter 1050 mm<br />
Materiaal RVS 316L, 3mm<br />
Toebehoren:<br />
voorzien van RVS sproeibuizen, verdeelplaten door de leverancier van het vat<br />
een mangat, hijsoog<br />
aansluiting voor ontluchting en aftap<br />
alle aansluitingen op het vat minimaal 200 mm lang uitvoeren ten behoeve van het<br />
isoleren.<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
Zonnebuffervaten op te stellen in de techniekruimtes, tevens te gebruiken als<br />
leegloopvaten.<br />
Projectnummer 54009 25
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.52 DOORSTROOMTOESTELLEN<br />
52.52.30-a ZONNECOLLECTOR, VLOEISTOFMEDIUM<br />
0. ZONNECOLLECTOR, VLOEISTOFMEDIUM<br />
Fabrikaat: Heliomax zonnecolectormodule<br />
Tel nr 0341 278 378<br />
Uitvoering modules van 6,81 m², te koppelen tot op de tekening aangegeven<br />
collectorvelden.<br />
Modules conform tekening op te stellen op het dak van de woningen nabij het ketelhuis<br />
Orientatie Zuid-West en Zuid-Oost, met een hellingshoek van 12° ten opzichte van het<br />
dakvlak.<br />
Zonnecolectoren opstellen op thermisch verzinkte frames, op poten op het dak<br />
ingeplakt in de dakbedekking door de dakdekker. De collectoren rondom afwerken met<br />
een mantel van wandwandbeplating in een nader te bepalen RAL-kleur (pootjes,frames<br />
en beplating te leveren door Heliomax)<br />
Het systeem is gebaseerd op het leeglooprincipe<br />
Als warmte-overdrachtmedium tussen collectoren en buffervaten dient gebruik te<br />
worden gemaakt van water.<br />
Regelingen:<br />
De velden worden, gesplits in orientatie, voorzien van twee separate delta T<br />
regelingen/ besturingen per ketelhuis welke bij de circulatiepomp schakeld bij<br />
voldoende opwarmend vermogen (levering Heliomax).<br />
Toebehoren:<br />
frames met damwand beplating<br />
delta T-regelingen<br />
4. MONTAGE ZONNECOLLECTOR<br />
Montagewijze:<br />
- op plat betonnen dak, opgesteld op een collectorframe,af te steunen op draagframes<br />
met pootjes op de draagmuren.<br />
Verbindingswijze:<br />
- collectoren onderling koppelen tot de op de tekening aangegeven velden<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
de zonnecollectoren installatie op de daken<br />
52.52.40-a INDIRECT VERWARMD DOORSTROOMTOESTEL<br />
0. INDIRECT VERWARMD DOORSTROOMTOESTEL<br />
Fabrikaat: van der Beyl, boileroplaadsysteem<br />
TSA: Alfa laval/Swep, enkele scheiding<br />
Voorraadvaten: Nibe, type EKS<br />
Debiet (dm3/min): te bepalen<br />
Temperatuur (°C): warmtewisselaar<br />
- primair zon (in/uit) 75 °C/ 15 °C<br />
- secundair tapwater (in/uit) 10 °C/ 65 °C<br />
Inhoud vooraadvaten:<br />
Ketelhuis 1: 1000 liter<br />
Ketelhuis 2: 1000 liter<br />
Ketelhuis 3: 1000 liter<br />
Ketelhuis 4: 1000 liter<br />
Maximale diameter 1050 mm ten gevolge van transport openingen.<br />
Vaten inclusief isolatie en afwerking<br />
Projectnummer 54009 26
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.52.40-a INDIRECT VERWARMD DOORSTROOMTOESTEL (vervolg)<br />
4. MONTAGE WARM-WATERTOESTEL<br />
Montage-/opstellingswijze:<br />
- montagewijze TSA en vaten opstellen op beton opstortingen.<br />
- tapwatertemperatuur (°C): 65<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
Voorverwarmingsboiler op zonnewarmte<br />
52.52.40-b INDIRECT VERWARMD DOORSTROOMTOESTEL<br />
0. INDIRECT VERWARMD DOORSTROOMTOESTEL<br />
Fabrikaat: van der Beyl, boileroplaadsysteem<br />
TSA: Alfa laval/Swep, dubbele scheiding<br />
vermogen TSA<br />
Ketelhuis 1: 472 kW<br />
Ketelhuis 2: 550 kW<br />
Ketelhuis 3: 669 kW<br />
Ketelhuis 4: 730 kW<br />
.<br />
voorraadvaten: Nibe, type EKS<br />
Debiet (dm3/min): te bepalen<br />
Inhoud vooraadvaten:<br />
Ketelhuis 1: 1200 liter<br />
Ketelhuis 2: 2x 800 liter<br />
Ketelhuis 3: 1x 1000 1x 800 liter<br />
Ketelhuis 4: 2x 1000 liter<br />
Maximale diameter 1050 mm ten gevolge van transport openingen.<br />
Vaten inclusief isolatie en afwerking<br />
4. MONTAGE WARM-WATERTOESTEL<br />
Montage-/opstellingswijze:<br />
- montagewijze TSA en vaten opstellen op beton opstortingen.<br />
- tapwatertemperatuur (°C): 65<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
naverwarmingsboiler op cv-warmte<br />
52.61 APPENDAGES IN LEIDINGEN<br />
52.61.11-a AFSLUITER<br />
0. KLEPAFSLUITER<br />
Fabrikaat: Econosto<br />
<strong>No</strong>minale doorlaat (DN): conform aan te sluiten leiding met vrije doorstroomopening<br />
Fig 31000, pneumatisch bediend doormiddel van waterleidingdruk in de<br />
koudwaterleiding<br />
Toebehoren:<br />
- drukopnemer pneumatisch, te plaasten in de koudwaterleiding.<br />
- verbindingsbuisje<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
Beveiligingsklep te plaasten in aftakking vanaf het ditributienet naar de woningstrang,<br />
zowel in de warmwater als in de recirculatie-leiding.<br />
De klep sluit de warmwateraanvoer bij het wegvallen van de koudwaterdruk.<br />
Projectnummer 54009 27
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.61.13-a REGELAFSLUITER<br />
0. REGELAFSLUITER<br />
Fabrikaat:<br />
Leverancier: Heliomax<br />
Type Taco setter<br />
.01 WATERLEIDINGNET<br />
()<br />
Op te nemen in de zonneboilerinstallatie, zoals in principe op het schema is<br />
aangegeven<br />
52.61.25-a STROOMBEGRENZER<br />
0. STROOMBEGRENZER, WATER<br />
Fabrikaat: Neoperl<br />
Debiet (m3/h): 0.72 (12 l/min)<br />
.01 KOUD-WATERTAPINSTALLATIE<br />
()<br />
te plaasten voor de watermeter van de woning<br />
.02 WARM-WATERTAPINSTALLATIE<br />
()<br />
te plaasten voor de watermeter van de woning<br />
52.61.41-a WATERMETER<br />
0. WATERMETER<br />
Fabrikaat: VWV, siemeca<br />
(tel nr 0182 640 775)<br />
Warmwater type WFH36.D080<br />
Bereik debiet (m3/h): 1,5<br />
Aflezing: digitaal<br />
Meetwijze meterstanden worden radiografisch doorggeven aan een netwerk van<br />
ontvangers welke verbonden zijn met de computer van VWV.<br />
Toebehoren:<br />
- bijbehorend passtuk<br />
- bijbehorede koppelingen<br />
4. MONTAGE AANWIJSINSTRUMENT<br />
Montagewijze:<br />
- montage<br />
Meters worden gecodeerd aangeleverd specifiek voor een woningblok.<br />
Door de installateur dient op een lijst te worden bijgehouden welke meters (code<br />
nummers ) er in welke wonig zijn gemonteerd.<br />
Montage voorschriften:<br />
- zodanig dat de meter eenoudig afleesbaar is<br />
- voor de ingang van de watermeter is een vrije doorstroming nodig van 150 mm<br />
lengte.<br />
- het rekenwerk dient te worden verzegeld.<br />
- stromingsrichting conform de op de meter aangegeven richtingspijl.<br />
.01 WATERLEIDINGNET<br />
()<br />
watermeters in de woning, voor het bemeteren van warmwaterverbruik.<br />
Watermeters worden aangeleverd door leverancier, gemonteerd door de installateur<br />
Het gehele uitleesnetwerk inclusief de koppeling met de computer wordt geleverd<br />
gemonteerd en in bedrijf gesteld door VWV.<br />
52.61.41-b WATERMETER<br />
0. WATERMETER<br />
Fabrikaat: levering nutsbedrijf<br />
Meters worden door het nuutsbedrijf aangeleverd<br />
Projectnummer 54009 28
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.61.41-b WATERMETER (vervolg)<br />
Bereik debiet (m3/h): te bepalen<br />
en te overleggen aan het nutsbedrijf.<br />
Aflezing: digitaal<br />
Meetwijze<br />
Toebehoren:<br />
- bijbehorend passtuk<br />
- bijbehorede koppelingen<br />
- meterbeugel<br />
4. MONTAGE AANWIJSINSTRUMENT<br />
Montagewijze:<br />
- montage<br />
Meters worden door derden aangeleverd<br />
Montage voorschriften:<br />
- zodanig dat de meter eenoudig afleesbaar is<br />
- voor de ingang van de watermeter is een vrije doorstroming nodig van 150 mm<br />
lengte.<br />
- het rekenwerk dient te worden verzegeld.<br />
- stromingsrichting conform de op de meter aangegeven richtingspijl.<br />
.01 WATERLEIDINGNET<br />
()<br />
Watermeters in de woning, voor het bemeteren van het koudwaterverbruik.<br />
Watermeters worden aangeleverd door leverancier, gemonteerd door de installateur<br />
52.63 APPENDAGES OM LEIDINGEN<br />
52.63.10-a LEIDINGDOORVOERHULPSTUK, MONTAGE DOORVOERHULPSTUK<br />
0. LEIDINGDOORVOERHULPSTUK<br />
Materiaal RVS <strong>of</strong> aluminium<br />
Toebehoren:<br />
- plakplaat dakbedekking<br />
1. MONTAGE DOORVOERHULPSTUK<br />
Montagewijze:<br />
Bevestigingswijze:<br />
in te plakken door de dakdekker<br />
.01 WATERLEIDINGNET<br />
()<br />
Dakdoorvoeringen ten behoeve van de zonneboilerinstallatie<br />
52.81 ISOLATIE<br />
52.81.11-a ISOLATIEWERK, ISOLATIESCHALEN, KUNSTSTOFSCHUIM SCHAAL<br />
0. ISOLATIEWERK, ISOLATIESCHALEN<br />
Verwerkingswijze:<br />
- patroon verspringend<br />
- bevestiging geheel verlijmd<br />
Projectnummer 54009 29
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.81.11-a ISOLATIEWERK, ISOLATIESCHALEN, KUNSTSTOFSCHUIM SCHAAL (vervolg)<br />
1. SCHUIMRUBBER SCHAAL<br />
Fabrikaat: Armacell.<br />
Schuimrubber slang.<br />
Type: AF/Armaflex.<br />
Materiaal: flexibel geslotencellig synthetisch schuimrubber, CFK-vrij.<br />
Slangcode: SH 13 mm dikte<br />
Temperatuur (°C): -200 t/m +105.<br />
Warmtegeleidingscoëfficiënt (DIN 52612-1-79) (W/(m.K)): =7.000.<br />
Brandklasse (NEN 6065+w97): 2.<br />
Rookdichtheid (NEN 6066+w97) (m-1): =60.<br />
Geluiddemping (DIN 4109-1+a01): reductie van contactgeluidvoortplanting tot 30<br />
(dB(A)).<br />
.01 KOUD-WATERTAPINSTALLATIE<br />
()<br />
Isolatie van het gehele koudwaterleidingnet vanaf de ho<strong>of</strong>dwatermeter in het ketelhuis<br />
tot bij de watermeter in de woningen.<br />
Appendages, beugels, etc zoveel mogelijk isoleren om warmteverlies/ opwarming te<br />
voorkomen.<br />
Daar waar nodig voor onderhoud <strong>of</strong> inspectie de isolatie wegneembaar uitvoeren.<br />
52.81.11-b ISOLATIEWERK, ISOLATIESCHALEN, KUNSTSTOFSCHUIM SCHAAL<br />
0. ISOLATIEWERK, ISOLATIESCHALEN<br />
1. SCHUIMRUBBER SCHAAL<br />
Fabrikaat: Armacell<br />
Type : HT/Armaflex<br />
Materiaal: (H)CFK-vrij geproduceerd.<br />
Dikte (mm): 25 mm<br />
Temperatuur (°C): max 125<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
Isolatieafwerking: leidingen inclusief isolatie invoeren in een dunwandige volledig<br />
recyclebare PVC buis, vogelpikvrij afwerken.<br />
.01 WATERLEIDINGNET<br />
()<br />
Isolatie van de uitpandige (op het dak) zonneboilerleidingen<br />
Appendages beugels etc zoveel mogelijk isoleren om warmteverlies te voorkomen<br />
52.81.12-a ISOLATIEWERK, ISOLATIESCHALEN, SCHAAL, MINERALE WOL<br />
0. ISOLATIEWERK, ISOLATIESCHALEN<br />
1. SCHAAL, MINERALE WOL<br />
Fabrikaat: Rockwool<br />
Materiaal steenwol<br />
Cachering vezelversterkt aluminiumfolie<br />
Dikte (mm): 25 mm inpandig en 30 mm in het galerijplafond<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
- Isolatieafwerking: isolatie in de technische ruimtes voorzien van iogenepak<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
Isolatie van de warmtapwaterleidingen (exclusief de voorgeisoleerde leidingen in het<br />
gallerijplafond) en inpandige zonneboilerleidingen<br />
Projectnummer 54009 30
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
52.81.12-a ISOLATIEWERK, ISOLATIESCHALEN, SCHAAL, MINERALE WOL (vervolg)<br />
De ongeisoleerde koppelingen tussen de voorgeisolerde leidingen isoleren en aftapen<br />
met aluminium tape.<br />
Appendages, beugels, pompen etc zoveel mogelijk isoleren om warmteverlies te<br />
voorkomen.<br />
Daar waar nodig voor onderhoud <strong>of</strong> inspectie de isolatie wegneembaar uitvoeren.<br />
52.81.21-a ISOLATIEWERK, ISOLATIEDEKENS, DEKEN MINERALE WOL<br />
0. ISOLATIEWERK, ISOLATIEDEKENS<br />
1. DEKEN MINERALE WOL<br />
Fabrikaat: Rockwool<br />
Materiaal: steenwol.<br />
Dikte (mm): 100 mm<br />
Cachering alu folie<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
- isolatieafwerking aluminium beplating<br />
.01 WARM-WATERTAPINSTALLATIE<br />
()<br />
Isolatie van de zonne-energie opslagvaten<br />
Projectnummer 54009 31
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
54 BRANDBESTRIJDINGSINSTALLATIES<br />
54.00 ALGEMEEN<br />
54.00.30 INFORMATIE-OVERDRACHT: ALGEMEEN<br />
01. GOEDKEURING INSTALLATIES<br />
De aannemer zorgt voor de goedkeuring van de daarvoor in aanmerking komende<br />
installaties <strong>of</strong> delen hiervan door:<br />
- het waterleverend bedrijf.<br />
- de plaatselijke brandweer<br />
De kosten van keuring zijn voor rekening van<br />
de aannemer.<br />
De kosten voor het verkrijgen van goedkeuring zijn voor rekening van de aannemer.<br />
02. MELDING AANVANG<br />
De aannemer moet de directie tijdig melden wanneer een aanvang wordt gemaakt met<br />
de werkzaamheden en wanneer de volgende bewerking plaats vindt.<br />
54.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN<br />
54.11.10-a BRANDBESTRIJDINGSINSTALLATIE<br />
0. BRANDBESTRIJDINGSINSTALLATIE<br />
De ketelhuizen voorzien van een poederblusser 9 kg.<br />
54.12 TEKENINGEN EN BEREKENINGEN<br />
54.12.10-b TEKENINGEN<br />
0. TEKENINGEN BRANDBESTRIJDINGSINSTALLATIE<br />
Door de aannemer te vervaardigen tekening(en) op de tekening(en) moet zijn aangegeven:<br />
- het leidingbeloop met diameters<br />
- de materialen<br />
- de plaats van appendages<br />
- de maatvoering<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring 2<br />
- goedgekeurde 3<br />
.01 BLUSWATERINSTALLATIE<br />
()<br />
Projectnummer 54009 32
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
54.40 BRANDBLUSTOESTELLEN<br />
54.40.30-a DRAAGBAAR BLUSTOESTEL<br />
0. POEDERBLUSSER<br />
Fabrikaat: Ajax<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
.01 BRANDBLUSTOESTEL<br />
()<br />
Handbrandblussers 1 stuks per ketelhuis.<br />
Projectnummer 54009 33
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
55 GASINSTALLATIES<br />
55.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN<br />
55.11.10-a AARDGASINSTALLATIE<br />
0. AARDGASINSTALLATIE<br />
De gasleiding vanaf de invoer in het huidige ketelhuis aansluiten op de nieuwe ketels.<br />
In het leidingdeel net buiten het nieuwe ketelhuis een calamiteitenafsluiter opnemen.<br />
Conform de eisen het laswerk aan de leidingen laten controleren middels röntgen.<br />
55.12 TEKENINGEN EN BEREKENINGEN<br />
55.12.10-a TEKENINGEN<br />
0. TEKENINGEN<br />
Door de aannemer te vervaardigen tekeningen:<br />
- werktekeningen;<br />
- proces-en regelschema's;<br />
- sparingstekeningen;<br />
- revisietekeningen<br />
Op de tekeningen moeten zijn aangegeven:<br />
- alle gegevens welke nodig zijn voor een goede uitvoering en afstemming van de<br />
werkzaamheden.<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring: in 2 voud;<br />
- goedgekeurde: in 3 voud.<br />
.01 AARDGASINSTALLATIE<br />
()<br />
55.12.20-a INSTALLATIE-BEREKENING<br />
0. GASINSTALLATIE<br />
Door de aannemer te vervaardigen berekening.<br />
Van de gehele gasleiding vanaf de meter;<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring (st.): in 2 voud;<br />
- goedgekeurde (st.): in 3 voud;<br />
- tijdstip: voor de start van de montage, tijdens de aanvraagprocedure.<br />
.01 AARDGASINSTALLATIE<br />
()<br />
Gasleidingnet naar de nieuwe ketels.<br />
Projectnummer 54009 34
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
55.13 BEPROEVEN, INREGELEN, IN BEDRIJF STELLEN EN CONTROLEREN<br />
55.13.10-a BEPROEVEN/INREGELEN<br />
0. GASINSTALLATIE<br />
Keuring lassen in de gasleiding: ter keuring van de gasleding de lassen laten röntgenen<br />
en keuren door RTD.<br />
Beproeven/inregelen gasinstallatie, onderdelen:<br />
de complete gasinstallatie<br />
Methode: volgens NEN 1078<br />
Uitgangspunten:<br />
- uitvoering door: het gasleverend bedrijf<br />
- tijdstip: voor ingebruik name<br />
- De eindkeuring vindt plaats door het gasleverend bedrijf en wordt verzorgt door de<br />
aannemer;<br />
- Na beproeving en keuring van de aardgasinstallatie door het gasleverend bedrijf,<br />
mogen<br />
hieraan geen wijzigingen meer worden doorgevoerd.<br />
4. MEETRAPPORT<br />
Door de aannemer te verstrekken meetrapporten:<br />
aantal te verstrekken exemplaren: 4<br />
tijdstip van verstrekking: bij oplevering<br />
5. KEURINGSRAPPORT/-CERT. GASINSTALLATIE<br />
Door de aannemer te verstrekken keuringsrapport/ -certificaat:<br />
Aantal te verstrekken exemplaren: 4<br />
Tijdstip van verstrekking: bij oplevering<br />
.01 AARDGASINSTALLATIE<br />
()<br />
55.31 METALEN BUISLEIDINGEN<br />
55.31.10-a AANLEG METALEN BUISLEIDING, STALEN BUIS<br />
0. AANLEG METALEN BUISLEIDING<br />
Aanlegwijze:<br />
- voor de montage van leidingen en hulpstukken deze ontdoen van verontreinigingen,<br />
scherpe kanten en bramen;<br />
- leidingdoorvoeringen in het zicht afdekken met rozetten.<br />
Verbindingswijze:<br />
- lasverbindingen volgens ISO 2084;<br />
- overige verbindingen ter goedkeuring van het plaatselijke energiebedrijf;<br />
- diameter gelijk <strong>of</strong> groter dan 50 mm uitvoeren als foto laswerk.<br />
Bevestigingswijze:<br />
- gebeugeld conform de voorschriften.<br />
1. STALEN BUIS, NAADLOOS (NEN 2323-83)<br />
Buitenmiddellijn (mm): Reeks 1: volgens berekening<br />
Wanddikte (mm):<br />
Oppervlaktebehandeling: gestraald, gemenied, en in okergele kleur af te schilderen<br />
(volgens NEN 3050).<br />
Hulpstukken:<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
Projectnummer 54009 35
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
55.31.10-a AANLEG METALEN BUISLEIDING, STALEN BUIS (vervolg)<br />
- bochten, T stukken etc.<br />
.01 AARDGASINSTALLATIE<br />
()<br />
de nieuw aan te leggen gasleidingen<br />
55.51 APPENDAGES IN LEIDINGEN<br />
55.51.10-a AFSLUITER<br />
0. KOGELAFSLUITER<br />
Fabrikaat: Econosto<br />
Figuur 1619 BPS binnendraad<br />
Figuur 1637 met flenzen<br />
<strong>No</strong>minale doorlaat (DN): volgens bestektekening<br />
Druktrap (PN): 16<br />
Vorm: recht<br />
Bediening hendel<br />
.01 GASLEIDINGNET<br />
()<br />
t.b.v. gasleidingnet de ho<strong>of</strong>dafsluiter na de gasmeter, de calamiteiten afsluiter nabij<br />
de ingang van het ketelhuis en de afsluiters op de nieuwe te plaasten ketels.<br />
55.53 APPENDAGES OM LEIDINGEN<br />
55.53.10-b LEIDINGDOORVOERHULPSTUK, MONTAGE DOORVOERHULPSTUK<br />
0. LEIDINGDOORVOERHULPSTUK, GASDICHT<br />
Fabrikaat: te bepalen door aannemer<br />
Uitvoering: gasdicht<br />
1. MONTAGE DOORVOERHULPSTUK<br />
Montagewijze:<br />
volgens voorschriften van de fabrikant.<br />
.01 AARDGASINSTALLATIE<br />
()<br />
ten behoeve van het gasdicht doorvoeren van de gasleiding in de ketelhuizen.<br />
Projectnummer 54009 36
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60 VERWARMINGSINSTALLATIES<br />
60.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN<br />
60.11.10-a WARM-WATERVERWARMINGSINSTALLATIE<br />
0. WARM-WATERVERWARMINGSINSTALLATIE<br />
In de ketelhuizen de benodigde modulerende verwarmingsketels plaatsen, waarvan<br />
twee ketels tevens op de warmwateropwekking worden aangesloten.<br />
Ten behoeve van de leidingverliezen in de warmwatertransportleidingen een<br />
gaswandketel plaatsen aangesloten op de naverwarmingsboiler.<br />
De cv-ketels in open uitvoering opstellen in cascade aangesloten op een verdeler<br />
verzamelaar.<br />
De rookgasafvoeren van de ketels combineren tot gezamelijke afvoerkanalen te<br />
plaatsen in de bestaande rookgasafvoeren van het ketelhuis.<br />
De verbrandingslucht via gevelroosters voorzien van schermplaten toevoeren van<br />
buiten.<br />
De verdeler/ verzamelaar voorzien van twee afgaande cv-transportgroepen naar de<br />
betreffende woonblokken voorzien van de benodigde appendages voor het<br />
weersafhankelijk voorregelen van de aanvoertemperatuur.<br />
De transportleidingen naar de woningen aanbrengen in het verlaagd plafond van de<br />
galerij, uitgevoerd in tichelmansysteem.<br />
Om overlast voor de bewoners te beperken dienen de transportleidingen en aftakkingen<br />
zoveel mogelijk als prefab met voorgeisoleerde leidingen te worden uitgevoerd en<br />
doormiddel van( victaulic) koppelingen te worden gemonteerd.<br />
Per aansluiting op de woningen, afsluiters opnemen boven een serviceluik in het<br />
plafond.<br />
In de kast van de woningen een verdeelstrang aanbrengen met aftakkingen per<br />
woningen. De aftakkingen per woning voorzien van een warmtemeter met<br />
bijbehorende kogelafsluiters.<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
60.12 TEKENINGEN EN BEREKENINGEN<br />
60.12.10-a TEKENINGEN<br />
0. VERANTWOORDELIJKHEID VOOR TEKENINGEN<br />
De aannemer blijft, ook na goedkeuring door de directie, verantwoordelijk voor de door<br />
hem gemaakte tekeningen betreffende de constructies, werkwijze, maatvoering en<br />
dergelijke.<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
Projectnummer 54009 37
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.12.10-b TEKENINGEN<br />
0. TEKENING VERWARMINGSINSTALLATIE<br />
Door de aannemer te vervaardigen tekening(en):<br />
Op de tekening(en) moet zijn aangegeven:<br />
- het leiding- en kanaalbeloop met afmetingen en peilmaten van de verwarmingsleidingen<br />
- de plaats en specificaties van verwarmingsapparaten en -lichamen;<br />
- de plaats en specificaties van appendages<br />
- de materialen van leidingen, kanalen, isolatie en eventuele isolatie-afwerkingen<br />
- de te isoleren, respectievelijk geïsoleerde installatiedelen<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring 2<br />
- goedgekeurde 2<br />
.01 VERWARMINGSINSTALLATIE<br />
()<br />
60.12.20-a INSTALLATIE-BEREKENING<br />
0. WARMTEVERLIESBEREKENING, UTIL.GEB. (NEN 5066+c93)<br />
Door de aannemer te vervaardigen berekening(en):<br />
- de warmteverliesberekening(en) :<br />
Transmissieverlies:<br />
Opwarmtoeslag:<br />
Te maken door de aannemer van het woningbestek.<br />
Gegevens op te vragen als uitgangspunt voor de installatieberekeningen.<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring (st.): 2<br />
- goedgekeurde (st.): 3<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
60.12.20-b INSTALLATIE-BEREKENING<br />
0. CV-DISTRIBUTIELEIDINGEN<br />
Door de aannemer te verstrekken berekening voor de berekening moet worden uitgegaan<br />
van:<br />
- de aanvoer-/retourtemperatuur van het CV-water van (gr. C): 90/70 °C<br />
- een drukverlies van maximaal (Pa/m): 150<br />
- maximale snelheid in leidingen 1 m/s<br />
Aantal te verstrekken exemplaren:<br />
- ter goedkeuring: 2<br />
- goedgekeurde: 3<br />
- tijdstip van verstrekking: voor bestelling componenten.<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
60.12.20-c INSTALLATIE-BEREKENING<br />
0. INSTALLATIEGELUID-BEREKENING<br />
Door de aannemer dient middel geluidberekeningen te worden aangetoond dat:<br />
het installatiegeluid van de ketelhuizen in de naast gelegen woningen niet hoger is dan<br />
30 dB(A).<br />
Een en ander te presenteren in een rapportage<br />
Aantal te verstrekken exemplaren: 3<br />
- tijdstip van verstrekking voor: oplevering van het ketelhuis<br />
Projectnummer 54009 38
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.12.20-c INSTALLATIE-BEREKENING (vervolg)<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
60.13.10-a BEPROEVEN/INREGELEN<br />
0. VERWARMINGSINSTALLATIE<br />
Onderdelen:<br />
- a) de verwarmingsleidingen separaat afpersen;<br />
- b ) de complete verwarmingsinstallatie;<br />
Methode:<br />
a)Het afpersen van de centrale verwarmingsleidingen met een beproevingsdruk van<br />
400 kPa. Dit afpersen uitvoeren alvorens te isoleren. Voor het afpersen van de<br />
installatie mag het systeem worden gevuld met (tap)leidingwater. Na de dichtheid<br />
beproeving de installatie grondig doorspoelen met (tap)leidingwater en daarna de<br />
filters reinigen. De installatie moet vol water blijven staan.<br />
b)Het waterzijdig balanceren van de radiatoren op basis gelijke<br />
temperatuurverschillen over de verwarmingslichamen bij geheel geopende kraan.<br />
Instellen van de juiste waterhoeveelheden door de dubbel instelbare voetventielkraan.<br />
Het balanceren van de ho<strong>of</strong>dgroepen middels de inregelventielen.<br />
Meetrapporten verstrekken aan de directie.<br />
Uitvoering door:<br />
- een specifiek daartoe uitgerust bedrijf, b.v. <strong>Del</strong>ta P te Amersfoort. (de inregeling)<br />
Tijdstip:<br />
- voor de oplevering<br />
4. MEETRAPPORT<br />
Door de aannemer te verstrekken meetrapporten:<br />
- meet- en inregelrapport van de gehele verwarmingsinstallatie<br />
tijdstip van verstrekking:<br />
- voor de ingebruikname.<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
60.13.20-a IN BEDRIJF STELLEN<br />
0. IN BEDRIJF STELLEN<br />
In bedrijf stellen.<br />
Onderdelen:<br />
- de complete installatie met pompen, regelingen, enz.<br />
Uitvoering door:<br />
- deels door fabrikanten/leveranciers, deels door de aannemer, maar alles onder<br />
verantwoordelijkheid van de aannemer van dit bestek.<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
60.31 METALEN BUISLEIDINGEN<br />
60.31.10-a AANLEG METALEN BUISLEIDING, STALEN BUIS<br />
0. AANLEG METALEN VERWARMINGSLEIDING<br />
Aanlegwijze:<br />
- voor montage van leidingen en hulpstukken deze ontdoen van verontreinigingen,<br />
scherpe kanten en bramen.<br />
- leidingdoorvoer in het zicht afdekken met rozetten<br />
Verbindingswijze:<br />
Projectnummer 54009 39
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.31.10-a AANLEG METALEN BUISLEIDING, STALEN BUIS (vervolg)<br />
- lasverbinding<br />
- knelverbinding doormiddel van victaulic koppelingen<br />
Bevestigingswijze:<br />
- ondersteund<br />
- vastpuntconstructie, expansievoorziening daar waar nodig.<br />
Beschermingswijze:<br />
1. STALEN BUIS, DRAADPIJP (NEN 3257-74)<br />
<strong>No</strong>minale doorlaat (mm): Voor leidingen tot en met DN.32<br />
Wanddikte: middelzwaar.<br />
Constructie: gelast.<br />
Oppervlaktebehandeling: fabrieksmatig gestraald en gemenied met b.v. Sicro<br />
Hulpstukken:<br />
- lashulpstukken<br />
Toebehoren:<br />
- bevestigingsmateriaal<br />
- victaulic koppelingen<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
De cv-leidingen welke niet in het galerijplafond lopen.<br />
60.31.10-b AANLEG METALEN BUISLEIDING, STALEN BUIS<br />
0. AANLEG METALEN VERWARMINGSLEIDING<br />
Aanlegwijze:<br />
- voor montage van leidingen en hulpstukken deze ontdoen van verontreinigingen,<br />
scherpe kanten en bramen.<br />
- leidingdoorvoer in het zicht afdekken met rozetten<br />
Verbindingswijze:<br />
- lasverbinding<br />
- draadfitverbinding<br />
- knelverbinding doormiddel van victaulic koppelingen<br />
- flensverbinding<br />
Bevestigingswijze:<br />
- gebeugeld<br />
- vastpuntconstructie, expansievoorzieningen daar waar nodig<br />
Beschermingswijze:<br />
- beschermbuis bij wand/vloerdoorvoeren<br />
1. STALEN BUIS, NAADLOOS (NEN 2323-83)<br />
Buitenmiddellijn (mm): Reeks 1: Voor de diameters DN.40 en groter.<br />
Wanddikte (mm):<br />
Oppervlaktebehandeling fabrieksmatig gestraald en gemenied met b.v. Sicro<br />
Hulpstukken:<br />
- lashulpstukken<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
- victaulic koppelingen<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
De cv-leidingen welke niet in het galerijplafond lopen.<br />
60.31.10-c AANLEG METALEN BUISLEIDING, STALEN BUIS<br />
0. AANLEG METALEN BUISLEIDING<br />
1. STALEN BUIS, GEÏSOLEERD, MANTEL<br />
Fabrikaat: Weijers Waalwijk<br />
Type Prinspipe Uno<br />
Materiaal stalen pijp voorzien van PUR isolatie en HDPE-mantel<br />
Projectnummer 54009 40
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.31.10-c AANLEG METALEN BUISLEIDING, STALEN BUIS (vervolg)<br />
Toebehoren:<br />
- bevestigingsmiddelen om de isolatie<br />
- victaulic koppelingen<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
De cv-leidingen in het galerijplafond, tot in de woning portiek en het ketelhuis<br />
60.34 METALEN KANALEN<br />
60.34.31-a METALEN KANAAL, CORROSIEVAST-STALEN BUIS<br />
0. AANLEG METALEN KANAAL<br />
Aanlegwijze:<br />
1. CORROSIEVAST-STALEN BUIS, DUBBELWANDIG<br />
Fabrikaat: Dalsem<br />
Materiaal binnenmantel: aluminium dikwandig<br />
buitenmantel aluminium<br />
Afmetingen binnenbuis (mm:) per situatie te berekenen door Remeha afd service<br />
- materiaal steenwol<br />
- dikte (mm): 40<br />
Hulpstukken:<br />
- segmentbochten<br />
- T-stuk 45º<br />
- open afvoer bovendaks<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
- inmeten ter plaatse<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
De rookgasafvoeren van de cv-ketels.<br />
Stijgkanalen invoeren (van bovenaf) in de bestaande bouwkundige kanalen, op ketelhuis<br />
nivo aansluiten op het horizontale deel naar de ketels.<br />
60.51 CENTRALE WARMTE-OPWEKKINGSAPPARATEN<br />
60.51.11-a GESTOOKTE WATERKETEL<br />
0. GASGESTOOKTE WATERKETEL<br />
Fabrikaat: Remeha, type 310<br />
Open uitvoering<br />
Linkse <strong>of</strong> rechtse uitvoering afhankelijk van opstelling<br />
<strong>No</strong>minaal vermogen (kW): conform de principe schema's<br />
Rendement HR (%):<br />
Emissie (ppm):<br />
Modulerend geregeld<br />
Toevoer/afvoer lucht/rookgasvoorziening:<br />
- gesloten.<br />
- temperatuur (°C): 90-70<br />
Projectnummer 54009 41
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.51.11-a GESTOOKTE WATERKETEL (vervolg)<br />
Brander:<br />
- ontsteking: zonder waakvlam.<br />
- regeling/beveiliging:<br />
Pomp:<br />
- regeling:<br />
Toebehoren:<br />
- in bedrijf stellen<br />
- EBI keuring<br />
Gasgestookte waterketel met Gaskeur HR, Gaskeur SV.<br />
4. MONTAGE WARMTE-OPWEKKINGSAPPARAAT<br />
Montagewijze:<br />
Aansluitingen:<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
Centrale verwarming ketels in de ketelhuizen.<br />
60.51.11-b GESTOOKTE WATERKETEL<br />
0. GASGESTOOKTE WATERKETEL<br />
Fabrikaat: Remeha, type Quinta<br />
Ketelhuis 1,2 en 3 , type Quinta 60<br />
Ketelhuis 4, type Quinta 85<br />
Open uitvoering<br />
<strong>No</strong>minaal vermogen (kW): conform de principe schema's<br />
Rendement HR (%):<br />
Emissie (ppm):<br />
Modulerend geregeld<br />
Toevoer/afvoer lucht/rookgasvoorziening:<br />
- gesloten.<br />
- temperatuur (°C): 90-70<br />
Brander:<br />
- ontsteking: zonder waakvlam.<br />
- regeling/beveiliging:<br />
Pomp:<br />
- regeling:<br />
Toebehoren:<br />
- in bedrijf stellen<br />
- EBI keuring<br />
Gasgestookte waterketel met Gaskeur HR, Gaskeur SV.<br />
4. MONTAGE WARMTE-OPWEKKINGSAPPARAAT<br />
Montagewijze:<br />
Aansluitingen:<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
Centrale verwarming ketel in de ketelhuizen, voor het compenseren van de<br />
leidingverliezen in het systeem .<br />
Projectnummer 54009 <strong>42</strong>
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.60 FLESSEN EN TANKS<br />
60.60.21-a EXPANSIEVAT, MONTAGE TANK/VAT<br />
0. DRUKEXPANSIEVAT<br />
Fabrikaat: Flamco.<br />
Membraan drukexpansievat.<br />
Type: Flexcon;<br />
Medium: water.<br />
Constructie: gesloten stalen vat, membraan en stikst<strong>of</strong> vulling.<br />
Inhoud (dm3):<br />
Kleur (RAL): 3002.<br />
Materiaal membraan: rubber;<br />
Toebehoren:<br />
- Flexcon aansluitgroep met manometer en prescor veiligheidsventiel;<br />
- bevestigingsmaterialen;<br />
1. MONTAGE TANK/VAT<br />
Montagewijze:<br />
- aan de zuigzijde van de transportpomp in het ketelhuis;<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
Expansievaten op de ketels<br />
60.60.21-b EXPANSIEVAT, MONTAGE TANK/VAT<br />
0. DRUK EXPANSIE-AUTOMAAT<br />
Fabrikaat: Flamco.<br />
Compressor expansie-automaat.<br />
Type:<br />
Medium: water.<br />
Constructie: gesloten stalenvat, verwisselbaar membraan, compressoreenheid.<br />
Inhoud (dm3):<br />
Druk (kPa): max. 900.<br />
Temperatuur (°C): 90-70<br />
Materiaal: staal.<br />
Compressor:<br />
- aansluitspanning (V): 230.<br />
Membraan:<br />
- materiaal: butylrubber.<br />
Meting/regeling/beveiliging:<br />
- LCD scherm<br />
- niveausignalering<br />
- druksignalering<br />
Voorzien van bijvulinrichting<br />
Aansluiting op GBS middels RS485 bus, inclusief protocol.<br />
1. MONTAGE TANK/VAT<br />
Montagewijze:<br />
Bevestigingswijze:<br />
- ondersteund <strong>of</strong> op poten<br />
Aansluitingen:<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
Expansie automaat in de verwarmingsinstallatie, per ketelhuis.<br />
Projectnummer 54009 43
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.71 APPENDAGES IN LEIDINGEN EN KANALEN<br />
60.71.11-a AFSLUITER<br />
0. KOGELAFSLUITER<br />
Fabrikaat: Econosto fig 1607<br />
<strong>No</strong>minale doorlaat (DN): te bepalen (t/m 1/1/2")<br />
Druktrap (PN): 16<br />
Bediening: handmatig<br />
Toebehoren:<br />
- tegenflenzen, pakkingen<br />
- bouten en moeren<br />
- koppelingen<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
(alg)<br />
De benodigde kogelkranen als afsluiters in de installatie .<br />
60.71.11-c AFSLUITER<br />
0. VLINDERKLEPAFSLUITER<br />
Fabrikaat: Econosto<br />
<strong>No</strong>minale doorlaat (DN): vanaf DN.40 en groter<br />
Druktrap (PN): 10<br />
Vorm: recht<br />
Aansluitingen: flens<br />
Materiaal Huis grijsgietijzer en messing klep met EPDM afdichting<br />
Bediening: handmatig<br />
Toebehoren:<br />
- tegenflenzen, bouten en moeren<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
De benodigde vlinderkleppen als afsluiter in de installatie.<br />
60.71.12-a REGEL-TEE<br />
0. REGEL-TEE<br />
Fabrikaat: Tour & Anderson;<br />
Type:<br />
- inregelafsluiter STAD voor diameter tot/met DN50;<br />
- inregelafsluiter STAF voor grotere diameters.<br />
Toebehoren:<br />
- handwiel, meetnippels, aftapper;<br />
- 3-delige koppeling bij STAD<br />
- set voorlasflenzen, inclusief pakkingen en verzinkte tapbouten en moeren bij STAF.<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
De inregelafsluiters conform het principe schema en daar waar noodzakelijk voor een<br />
juiste werking van de installatie.<br />
60.71.21-a TERUGSLAGKLEP<br />
0. TERUGSLAGKLEP, KLEP<br />
Fabrikaat: Econosto<br />
<strong>No</strong>minale doorlaat (DN): nader te bepalen<br />
Druktrap (PN): 16<br />
Vorm: recht<br />
Aansluitingen: flens<br />
Projectnummer 54009 44
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.71.21-a TERUGSLAGKLEP (vervolg)<br />
Materiaal messing <strong>of</strong> zinkvrij brons<br />
Toebehoren:<br />
- set tegenflenzen<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
De benodigde terugslagkleppen in de ketelgroepen.<br />
60.71.30-a CIRCULATIEPOMP<br />
0. CIRCULATIEPOMP<br />
Fabrikaat: Grundfos.<br />
Pakkingbusloze circulatiepomp.<br />
Type: UPS<br />
Medium temperatuur (°C): 90-70<br />
Debiet (m3/h):<br />
Druktrap (PN):<br />
Aansluitingen:<br />
- diameter:<br />
Elektromotor:<br />
- aansluitspanning (V):<br />
- tegenflenzen<br />
- GBS module<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
circulatiepompen op de CV-ketels.<br />
60.71.30-e CIRCULATIEPOMP<br />
0. CIRCULATIEPOMP, TOERENGEREGELD<br />
Fabrikaat: Grundfos.<br />
Pakkingbusloze circulatiepomp.<br />
Type: UPE Magna<br />
(UPE serie 2000)<br />
Medium temperatuur (°C): 90-70 °C<br />
Debiet (m3/h):<br />
Druktrap (PN): 10.<br />
Materiaal huis: gietijzer<br />
Aansluitingen:<br />
- diameter:<br />
Elektromotor:<br />
- aansluitspanning (V): 3x400.<br />
Communicatie: LON<br />
Toebehoren:<br />
- tegenflenzen<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
circulatiepomp in de transportgroepen naar de woningen, dubbel uitvoeren.<br />
60.71.<strong>42</strong>-a LUCHTAFSCHEIDER<br />
0. LUCHTAFSCHEIDER<br />
Voor de luchtpot een aftakking maken van minimaal de diameter van de betreffende<br />
leiding, waarbij de bovenzijde wordt afgeblind met een lasbodem, op de luchtpot een<br />
aftakking 1/2"maken waarbij de leiding tot minimaal bedieningsniveau wordt doorgezet<br />
Projectnummer 54009 45
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.71.<strong>42</strong>-a LUCHTAFSCHEIDER (vervolg)<br />
(1800 mm) met daarop een bronzen aftapper.<br />
Vorm: recht<br />
Toebehoren:<br />
- bevestigingsmateriaal<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
- luchtpotten daar het voor een goede ontluchting van de installatie noodzakelijk is.<br />
60.71.61-a EXPANSIE-/ZETTINGSTUK<br />
0. COMPENSATOR<br />
Materiaal: met RVS-balg<br />
Constructie: balg<br />
<strong>No</strong>minale doorlaat (DN): gelijk aan aansluitende cv-leidingen.<br />
Toebehoren:<br />
- vastpuntconstructies aan weerszijden - op afstand verdeeld, d.m.v. specifieke<br />
consoles en ophangingen;<br />
- koppelingen;<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
- toepassen in leidingen DN 50 <strong>of</strong> daar waar voor expansiebochten geen ruimte is.<br />
60.72 APPENDAGES AAN LEIDINGEN EN KANALEN<br />
60.72.13-c ONTLUCHTER<br />
0. AUTOMATISCHE ONTLUCHTER<br />
Fabrikaat: Flamco,<br />
<strong>No</strong>minale doorlaat (DN): conform ledingdoorlaat<br />
Toebehoren:<br />
Set tegenflensen<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
Luchtafscheiders in de woninggroepen.<br />
60.72.14-a VUL-/AFTAPKRAAN<br />
0. VUL-/AFTAPKRAAN<br />
Fabrikaat: Econosto<br />
<strong>No</strong>minale doorlaat (DN): 15/20<br />
Vorm recht<br />
Aansluitingen: schroefdraad<br />
Materiaal brons<br />
Toebehoren:<br />
- slang met koppeling , voorzien van rubber slang lengte 10 meter, per ketelhuis<br />
- afsluitdop met ketting<br />
- slang/-wartel<br />
- sleutel<br />
Projectnummer 54009 46
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.72.14-a VUL-/AFTAPKRAAN (vervolg)<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
In technische ruimte voorzien per groep op de verdeler.<br />
60.72.24-a WARMTEMETER<br />
0. WARMTEMETER<br />
Fabrikaat: VWV Siemeca<br />
Type AMR-WFM26<br />
Aflezing: digitaal<br />
Meetwijze meterstanden worden radiografisch doorggeven aan een netwerk van<br />
ontvangers welke verbonden zijn met de computer van VWV.<br />
Toebehoren:<br />
- bijbehorende set afsluiters tbv tempvoelers<br />
- koppelingen<br />
4. MONTAGE AANWIJSINSTRUMENT<br />
Montagewijze:<br />
- montage<br />
Meters worden gecodeerd aangeleverd specifiek voor een woningblok.<br />
Door de installateur dient op een lijst te worden bijgehouden welke meters (code<br />
nummers ) er in welke wonig zijn gemonteerd.<br />
Montage voorschriften:<br />
- zodanig dat de meter eenoudig afleesbaar is<br />
- voor de ingang van de watermeter is een vrije doorstroming nodig van 150 mm<br />
lengte.<br />
- het rekenwerk dient te worden verzegeld.<br />
- stromingsrichting conform de op de meter aangegeven richtingspijl.<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
De warmtemeters te plaasten per woning,zoals globaal op de tekeningen is aangegeven<br />
Warmtemeters in de woning, voor het bemeteren van warmteverbruik.<br />
Warmtemeters worden aangeleverd door leverancier, gemonteerd door de installateur<br />
Het gehele uitleesnetwerk inclusief de koppeling met de computer wordt geleverd<br />
gemonteerd en in bedrijf gesteld door VWV.<br />
60.81 ISOLATIE<br />
60.81.12-a ISOLATIEWERK, ISOLATIESCHALEN, SCHAAL, MINERALE WOL<br />
0. ISOLATIEWERK, ISOLATIESCHALEN<br />
Verwerkingswijze:<br />
- patroon verspringend<br />
Fabrikaat: Rockwool<br />
- aantal lagen (st.): 1<br />
- bevestiging met minimaal 3 draden per schaal<br />
- naadafwerking overlangs afgeplakt met de zelfklevende overlap; dwarsnaden met<br />
aluminium tape;<br />
- kopeindafwerking met rozetvormige afblindingen<br />
1. SCHAAL, MINERALE WOL<br />
Cachering versterkt puur aluminium met zelfklevende overlap<br />
Dikte (mm): volgens de tabel isolatiedikten<br />
Brandklasse 2<br />
Rookdichtheid 2,4<br />
Toebehoren:<br />
Projectnummer 54009 47
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
60.81.12-a ISOLATIEWERK, ISOLATIESCHALEN, SCHAAL, MINERALE WOL (vervolg)<br />
- bevestigingsmiddelen<br />
.01 WARM-WATERVERWARMINGSINSTALLATIE<br />
()<br />
Alle ongeisoleerde cv-leidingen uitgezonderd de leidingen in de woning na de<br />
warmtemeter.<br />
Alle koppelingen en ongeisoleerde delen in het voorgeisoleerde leidingnet tevens<br />
isoleren en aftapen<br />
Projectnummer 54009 48
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
61 VENTILATIE- EN LUCHTBEHANDELINGSINSTALLATIES<br />
61.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN<br />
61.11.10-a MECHANISCHE AFZUIGINSTALLATIE<br />
0. MECHANISCHE AFZUIGINSTALLATIE<br />
In de ketelhuizen buitenluchtroosters aanbrengen hoog en laag in de buitengevel.<br />
ten behoeve van de verbrandingsluchttoevoer voor de ketels en de ventilatie van het<br />
ketelhuis.<br />
.01 MECHANISCHE AFZUIGINSTALLATIE<br />
()<br />
Projectnummer 54009 49
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
68 REGELINSTALLATIES<br />
68.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN<br />
68.11.10-a REGELINSTALLATIE<br />
0. REGELINSTALLATIE<br />
De regelinstallatie is gesplits in een monitoringsysteem ten behoeve van het<br />
monitoren van de installatie door Eneco<br />
Het andere deel omvan de DDC regelinstallatie met modem voor het op afstand<br />
beheren van de installatie.<br />
Monitoringsysteem per ketelhuis.<br />
Fabrikaat: Telecontrols te Hengelo<br />
Bestaande uit :<br />
2 stuks optimodem 862-G-E<br />
datalogger met 8 digitale ingangen voorzien van GSM modem<br />
Simkaarten voor de modems worden door Eneco ter beschikking gesteld.<br />
De installatie dient dor de aannemer te worden geinstalleerd en getest (via de<br />
leverancier).<br />
Tevens dient de installatie te worden gesynchronisseerd waarbij alle meterstanden aan<br />
Eneco moeten worden doorgegeven ter controle van het systeem.<br />
Watermeter fabrikaat Elster met rekenwerk F2, inclusief bijbehorende<br />
temperatuursensors.<br />
Flow meters inbouwen in ee rchtstuk pijp van 5xD voor en 3xD achter de meter<br />
Stand van de meters conform voorschriften van de leverancier<br />
Temperatuuropnemers Fabrikaat Telecontrols<br />
Aansluitingen zie ook schema W801<br />
Optimodem 1<br />
Digitale ingang<br />
Naam Omschrijving puls/eenheid<br />
1 FQ_TC1 gasmeter met pulsuitgang m³(nustbedrijf bestaand) 10<br />
2 FQ_TC3 watermetermet pulsuitgang m³(nutsbedrijf) 10<br />
3 FQ_TC4 flowmeter warmwater m³ 100 dP max 0.1 bar<br />
4 FQ_TC4 Energiemeter zon voorverwarming MJ <strong>of</strong> KWh 0.1 met TT3 en TT4<br />
5 FQ_TC5 Energiemeter cv-ruimteverwarming MJ <strong>of</strong> KWh 1 met TT5 en TT6<br />
6 FQ_TC5 flowmeter cv-ruimteverwarming m³ 10 dP max 0.1 bar<br />
7 Reserve<br />
8 Reserve<br />
Analoge ingang<br />
Naam Omschrijving<br />
1 TT_TC6 temperatuur cv-aanvoer °C dompel<br />
2 TT_TC7 temperatuur koudtapwater °C aanleg op vertikale leiding<br />
3 TT_TC8 temperatuur bovenzijde voorverw boiler °C dompel<br />
4 TT_TC9 temperatuur bwarmtapwater °C aanleg op vertikale leiding<br />
5 TT_TC10 temperatuur circulatitie tapwater groep1 °C aanleg op vertikale leiding<br />
Projectnummer 54009 50
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
68.11.10-a REGELINSTALLATIE (vervolg)<br />
6 TT_TC11 temperatuur circulatitie tapwater groep2 °C aanleg op vertikale leiding<br />
.<br />
.<br />
Optimodem 2<br />
Digitale ingang<br />
Naam Omschrijving puls/eenheid<br />
1 FQ_TC12 Flowmeter circulatie warmtapwater groep 1 m³ 100 dP max 0.15 bar<br />
2 FQ_TC12 Energiemeter circ. warmtapw. groep 1 MJ/ kWh 0.1<br />
3 FQ_TC13 Flowmeter circulatie warmtapwater groep 1 m³ 100 dP max 0.15 bar<br />
4 FQ_TC13 Energiemeter circ. warmtapw. groep 1 MJ/ kWh 0.1<br />
5 FQ_TC14 Electriciteitsmeter Ketelhuis kWh 0.01<br />
7 Reserve<br />
8 Reserve<br />
Analoge ingang<br />
Naam Omschrijving<br />
1 TT_TC14 temperatuur uit collectorveld Oost °C aanleg op vertikale leiding<br />
2 TT_TC15 temperatuur uit collectorveld West °C aanleg op vertikale leiding<br />
3 S1_TC16 Storing van primaire tapketel °C contact<br />
4 S1_TC17 Storingt van overige ketels °C contact<br />
5 TT_TC18 temperatuurbovenzijde buffer dompel<br />
6 reserve<br />
.<br />
DDC regelinstallatie, Fabrikaat Priva o.g.<br />
De regelinstallatie dient de in de volgende artikelen omschreven eigenschappen en<br />
mogelijkheden te omvatten, waaronder begrepen:<br />
- de gehele installatie fabrikant Priva:<br />
- de regelkasten in de ketelhuizen;<br />
- het aanleveren van de nodige signaleringen,<br />
- een complete regelinstallatie voor aansturing van alle componenten, inclusief<br />
veld-apparatuur,koppeling van de kasten, met lokale procesregelaars, in DDCuitvoering;<br />
voorzien van communicatie moduul<br />
- de <strong>engineering</strong> van de centrale s<strong>of</strong>tware;<br />
- de complete regel,voedings en communicatiebekabelingen te leveren en aan te<br />
brengen in buisleiding <strong>of</strong> kabelgoot.<br />
Buisleidingen en kabelgoten in de technische ruimtes dienen door de aannemer van dit<br />
bestek te worden geleverd en gemonteerd.<br />
- het inregelen, testen en in bedrijfstellen door de leverancier.<br />
.<br />
Het geheel dient te worden geregeld middels regelaars met aansluitmodulen,<br />
uitbreidingsmodulen, control units, enz..<br />
Algemene regeltechnische zaken:<br />
- storingssignaleringen met lampen, zoemer, afsteldrukker en storing-reset;<br />
- storingen onderverdeelt in algemeen, niet urgent en urgent.<br />
In de ketelhuizen een regelkast opnemen ten hoeve van de regelinstallatie voor de<br />
warmwater- en verwarmingsinstallatie.<br />
De regelkast voorzien van de benodigde voedingen voor de gehele installatie.<br />
Projectnummer 54009 51
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
68.11.10-a REGELINSTALLATIE (vervolg)<br />
Ten behoeve van de voeding van de regelkast, deze aansluiten op de bestaande<br />
voeding, van de huidige regelkast.<br />
De gehele installatie voorzien van een GBS systeem op afstaand uit te lezen en te<br />
bedienen.<br />
CV-ketels voorzien van een cascade schakeling, waarbij de leidende ketel regelmatig<br />
wordt gewisseld. De aanvoertemperatuur van het cv-water weerafhankelijk<br />
voorregelen middels een instelbare stooklijn. Tevens voorzien in een nachtverlaging<br />
van 5 ºC onder de stooklijn op basis vaneen tijdklok.<br />
Pompen voorzien van een pompschakeling waarbij tevens bij langere stilstand een<br />
periodiek pompschakeling wordt toegepast om vastzitten te voorkomen.<br />
De CV-ketels voor het (na) verwarmen van het warmtapwater sturen op basis van de<br />
warmtapwatertemperatuur in de boiler van minimaal 65 ºC, met een<br />
minimumtemperatuurbewaking op de retourwaterleiding bij de boiler van minimaal 60<br />
ºC).<br />
Bij onderscheiding van deze temperaturen dienen de cv-ketels te worden aangstuurd<br />
en/ <strong>of</strong> 3-wegventielen te worden geregeld<br />
Het collectorsysteem<br />
De beide collectorsystemen dienen te worden voorzien van ee deltaT regeling<br />
(levering Heliomax).<br />
Hierdoor wordt de collectorpomp aangeschakeld als de temperatuur in de collectoren<br />
10 K hoger is als in het buffervat.<br />
Zodra het verschil kleiner is dan 2 K wordt de pomp uitgeschakeld.<br />
Ter beveiliging van de coleectoren dienen de volgende zken te worden opgenomen.<br />
Als de temperatuur in de collectoren >85 °C wordt de pomp in verband met<br />
oververhittingsgevaar uitschakelen.<br />
De pomp weer vrijgeven als de temperatuur 40 °C, een en ander als beveiliging van de pomp tegen<br />
eventuele lekkages in het systeem.<br />
Laden voorverwarmboiler<br />
Indien de watertemperatuur in de voorverwarmboiler lager is dan in de<br />
zonnebuffervaten dienen de pompen te worden aangeschakeld, tot de temperatuur weer<br />
gelijk is.<br />
68.11.10-b REGELINSTALLATIE<br />
0. KEMA-KEUR<br />
De elektrotechnische materialen en apparaten, voorzover niet bestemd voor zwakstroom,<br />
moeten zijn voorzien van een KEMA-keur dan wel door KEMA zijn gekeurd.<br />
.01 KLIMAATREGELINSTALLATIE<br />
()<br />
Projectnummer 54009 52
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
70 ELEKTROTECHNISCHE INSTALLATIES<br />
70.11 FUNCTIONELE OMSCHRIJVING, INSTALLATIE-ONDERDELEN<br />
70.11.29-a LICHTINSTALLATIE<br />
0. LICHTINSTALLATIE<br />
1. De huidige installatie in de woningen dateerd uit 1966 / 1967.<br />
Daar waar nieuwe installaties worden geraliseerd dienen deze te voldoen aan<br />
de nu geldende norm. Dit conform de NPR 5310 blad 30. Deze installatie zal moeten<br />
worden uitgevoerd conform de laatst uitgebrachte uitgave van de NEN 1010, de 5e<br />
druk.<br />
2. De door de bewoners zelf aangebrachte voorzieningen dienen tevens correct te<br />
worden aangesloten <strong>of</strong> te worden verwijderd.<br />
70.11.30-a VERLICHTINGSINSTALLATIE, ALGEMEEN<br />
0. VERLICHTINGSINSTALLATIE, ALGEMEEN<br />
VERLICHTINGSINSTALLATIE<br />
1. Met betrekking tot de algemene verlichting dienen de armaturen in de ketelhuizen<br />
te worden vervangen.<br />
Een en anderter plekke te bepalen plaats en aantallen afhankelijk van de indeling en<br />
situatie<br />
9. VERLICHTINGSARMATUREN<br />
Alle armaturen zijn voorzien van een elektronische voorschakelapparaat (EVSA)<br />
.01 ALGEMENE-VERLICHTINGSINSTALLATIE<br />
()<br />
Op de aangegeven lokaties conform armaturenlijst, op te nemen als stelpost € 1500,-<br />
per ketelhuis.<br />
70.11.39-a NOOD- EN TRANSPARANTVERLICHTINGSINSTALLATIE<br />
0. NOOD- EN TRANSPARANTVERLICHTINGSINSTALLATIE<br />
<strong>No</strong>od- en transparantverlichting leveren en monteren volgens de bestektekeningen, en<br />
aan de buitenzijde van de gebouwen ter plaatse (nood-)uitgangen van verkeers- en<br />
vluchtwegen die van algemene noodverlichting en/<strong>of</strong> transparantverlichting zijn<br />
voorzien. Installatie ontwerp conform NEN 1838.<br />
9. NOOD- EN TRANSPARANTARMATUREN<br />
De transparantverlichting dienen ook te branden tijdens normaal bedrijf. Wanneer de<br />
algemene verlichting wordt uitgeschakeld dient de transparantverlichting continu te<br />
blijven branden.<br />
.01 NOODVERLICHTING<br />
()<br />
In de ketelhuizen, als onderdeel van de stelpost zie art 70.11.30.<br />
Projectnummer 54009 53
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
SCHREUDER GROEP INGENIEURS/ADVISEURS MAARSSEN<br />
Referentie: MK/KD<br />
Datum: 15 september 2005<br />
Plaats: Maarssen<br />
Coll: [MK]<br />
Projectnummer 54009 54
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
Z. BIJLAGEN<br />
Projectnummer 54009 55
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
SPECIFICATIE FORMULIER ECO ENERGYINSTALLTIE<br />
Projectnummer 54009 56
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
MODEL COORDINATIEOVEREENKOMST<br />
opgesteld door de bouwdirectie VKZ, nr XXXXX d.d.XXXX<br />
Projectnummer 54009 57
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
BOUWKUNDIGE VOORZIENINGEN d.d. 15-09-05<br />
Projectnummer 54009 58
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
TEKENINGENLIJST d.d. 15-09-05<br />
Projectnummer 54009 59
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
PROJECTPLAN UITVOERING<br />
opgesteld door de bouwdirectie VKZ nr XXX, d.d. XXXX<br />
Projectnummer 54009 60
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
VEILIGHEIDS EN GEZONDHEIDSPLAN<br />
Opgesteld door de bouwdirectie VKZ,nr XXXX d.d. XXXX<br />
Projectnummer 54009 61
Revitalisatie woningen Het Breed Schreuder Groep Ingenieurs/adviseurs<br />
BOUWKUNDIGE VOORZIENINGEN DAKDEKKER d.d. 15-09-05<br />
Projectnummer 54009 62
<strong>No</strong>ta van Inlichtingen nr. 1<br />
Project : Eco Energy-installatie Het Breed te Amsterdam, kavel 4<br />
Projectnummer : 54009Eco<br />
Datum : 14 oktober 2005<br />
Vestiging : Maarssen<br />
Onderstaand een overzicht van algemene en installatietechnische aanvullingen op bestek<br />
54009Eco d.d. 15 september 2005.<br />
Algemeen:<br />
Toevoegen: Bij oplevering dient door de installateur een gebruikershandleiding aan de<br />
bewoner te worden afgegeven. (bijvoorbeeld een geplastificeerde kaart te<br />
plaatsen in de meterkast).<br />
00.03.10 Werkzaamheden door derden<br />
“- de installatie werkzaamheden in de woning welek niet…….. prijs, zie voor<br />
globale omschrijving de lijst bouwkundige voorzieningen installateur”.<br />
Vervallen: lijst bouwkundige voorzieningen installateur.<br />
01.02.10 Oplevering<br />
“Opleveringen zullen plaats vinden per woningblok.<br />
Vervangen door: Opleveringen zullen gefaseerd plaats vinden, voor de<br />
fasering wordt verwezen naar de lijst vragen en antwoorden naar aanleiding<br />
van bestek en tekeningen Het Breed.<br />
01.02.43 Bankgarantie<br />
Toevoegen: Bankgarantie groot: 10% van aanneemsom<br />
01.03.40 CAR-verzekering<br />
Vervallen: CAR-verzekering door opdrachtgegever<br />
Toevoegen : Car-verzekering door bouwkundig aannemer (kavel1)<br />
Eigen risico voor de aannemer : € 2275,-<br />
Een en ander conform art 01.03.10 uit het bestek Kavel 1.<br />
10.31.09-a Sloopwerk<br />
“ Hiervoor wordt tevens verwezen naar het projectplan uitvoering (bijlage 8)”<br />
Vervangen door: Hiervoor wordt tevens verwezen naar het<br />
bouwplaatsprotocol d.d. 15-09-2005 aangeleverd door VKZ.<br />
50.50.10.-b Dakafvoer<br />
Toevoegen: Toebehoren -dubbele plakplaat ten behoeve van dampremmende<br />
laag en dakbedekking.<br />
51.62.30-a Beluchter<br />
Toebehoren – plakplaat<br />
1
Vervangen door: Toebehoren – dubbele plakplaat ten behoeve van<br />
dampremmende laag en dakbedekking.<br />
52.11.20-a Warm-watertapinstallatie<br />
“ Beide circulatienetten uitvoeren als dubbel gevoed systeem.<br />
Dit systeem… verschil in capaciteit tussen recirculeren en voeden).<br />
Vervangen door: De warmwatercirculatie uitvoeren als standaard<br />
recirculatiesysteem zie ook tek W801-1.<br />
“In elke aftakking…. in de warmwater als in de recirculatieleiding een<br />
veiligheidsklep te worden ingebouwd”<br />
Vervangen door: “In elke aftakking…. in de warmwater een veiligheidsklep<br />
en in de recirculatie een keerklep te worden ingebouwd”<br />
52.12.10-b Tekeningen waterinstallatie.<br />
Toevoegen: van de waterinstallatie dient een isometrisch schema te worden<br />
getekend.<br />
52.13.10-a Beproeven/ inregelen.<br />
Toevoegen: van de leverancier van de warmwatermeters (VWV) wordt<br />
verlangt dat steekproefsgewijs wordt gecontroleerd <strong>of</strong> de installaties conform<br />
de voorschriften zijn aangesloten.<br />
De bevindingen dienen door VWV schriftelijke te worden gerapporteerd.<br />
52.31.10-a 01. Koudwatertapinstallatie.<br />
Toevoegen: kosten van de distributieleidingen tot op de koudwatermeter<br />
separaat op het specificatieformulier vermelden.<br />
52.52.40-b Indirect verwarmd doorstoomtoestel<br />
Toevoegen: per ketelhuis een extra boiler oplaadpomp als reserve aanleveren<br />
welke nabij de boiler wordt opgeslagen.<br />
52.61.11-a Afsluiter<br />
01. … woningstrang zowel in de warmwater als in de recirculatie-leiding“.<br />
Vervallen : als in de recirculatieleiding.<br />
52.61.41-b 01. waterleidingnet<br />
Toevoegen: kosten voor het plaatsen van de beugel en de meter separaat op<br />
het specificatieformulier vermelden.<br />
52.81.11-a 01. Koudwatertapinstallatie<br />
Toevoegen: kosten voor het isoleren van de distributieleidingen tot op de<br />
koudwatermeter separaat op het specificatieformulier vermelden.<br />
60.11 Algemeen<br />
Toevoegen: De aannemer dient te voorzien in elektrische radiatoren voor het<br />
verwarmen van woningen waarin werkzaamheden worden uitgevoerd.<br />
2
Te rekenen met 10 stuks elektrische radiator 1500 W.<br />
Mee te verhuizen met de bouwstroom.<br />
.<br />
60.13.10-a Beproeven/ inregelen.<br />
Toevoegen: van de leverancier van de warmtemeters (VWV) wordt verlangt<br />
dat steekproefsgewijs wordt gecontroleerd <strong>of</strong> de installaties conform de<br />
voorschriften zijn aangesloten.<br />
De bevindingen dienen door VWV schriftelijke te worden gerapporteerd.<br />
Bijlagen: lijst bouwkundige voorzieningen aannemer, versie 2 nr 54009Eco d.d. 14<br />
oktober 2005, ter vervanging van de vorige versie.<br />
lijst bouwkundige voorzieningen dakdekker, versie 2 nr 54009Eco d.d. 14<br />
oktober 2005, ter vervanging van de vorige versie.<br />
Specificatieformulier Eco <strong>energy</strong>-installatie per ketelhuis d.d. 14 oktober<br />
2005.<br />
lijst met vragen en antwoorden naar aanleiding van bestek en tekeningen Het<br />
Breed<br />
Tekeningen: W160 wijz A d.d. 14-10-05: waarop een aantal zonnecollectorvelden zijn<br />
toegevoegd, ter vervanging van de vorige versie.<br />
W801-1 wijz. A d.d. 14-10-05: met diverse kleine wijzigingen, ter<br />
vervanging van de vorige versie.<br />
SCHREUDER GROEP<br />
INGENIEURS/ADVISEURS<br />
Maarssen, 14 oktober 2005<br />
T.C. Kil<br />
Coll. :<br />
3
<strong>No</strong>ta van Inlichtingen nr. 2<br />
Project : Eco Energy-installatie Het Breed te Amsterdam, kavel 4<br />
Projectnummer : 54009Eco<br />
Datum : 7 maart 2008<br />
Vestiging : Maarssen<br />
Onderstaand een overzicht van algemene en installatietechnische aanvullingen op bestek<br />
54009Eco d.d. 15 september 2005 en de 1 e nota van inlichtingen d.d. 14 oktober 2005.<br />
52.11.20-a Warm-watertapinstallatie<br />
Toevoegen : De warmwater en circulatieleidingen van de woningstrangen<br />
uitvoeren met Viega inliner buizen (buis in buis constructie).<br />
52.31.10-a 01 KOUD-WATERTAPINSTALLATIE.<br />
Vervallen: alle nieuw aan te leggen koudwaterleidingen zoals globaal op de<br />
bestektekeningen is aangegeven.<br />
52.31.10-c Aanleg metalenwaterleidingen, koperen buis.<br />
Toevoegen: de warmwater toevoer en circulatie-leidingen van de<br />
woningstrangen combineren als een buis in buis systeem.<br />
Fabrikaat: Viega<br />
Type: inliner-systeem<br />
Buitenbuis: koper<br />
Binnenbuis: Pe-xc<br />
Toebehoren: bijbehorende hulpstukken een aansluitingen<br />
52.32.10-a Aanleg kunstst<strong>of</strong> buisleiding, kunstst<strong>of</strong> buis<br />
Kunstst<strong>of</strong> buis, PE<br />
Fabriekaat: Narthan<br />
Type: Unipipe<br />
Buitendiameter (mm): door aannemer te bepalen<br />
Hulpstukken: bijbehorende persfittingen en hulpstukken<br />
Toebehoren:<br />
- bevestigingsmiddelen<br />
- beugels (NEN 2286) met rubberinlage<br />
- bijbehorend gereedschap conform opgave fabrikant.<br />
01 KOUD-WATERTAPINSTALLATIE.<br />
Alle nieuw aan te leggen koudwaterleidingen zoals globaal op de<br />
bestektekeningen is aangegeven.<br />
52.31.10-c Indirect verwarmde boiler<br />
0. Zonne- energie opslagvat<br />
Vervangen: Fabrikaat: Rebac Alkmaar<br />
Door: Fabrikaat Grovo bv Boskoop tel 0172 215040<br />
1
52.81.11-a Isolatiewerk, Isolatieschalen, kunstst<strong>of</strong>schuim schaal<br />
0. Isolatiewerk, isolatieschalen<br />
01 KOUD-WATERTAPINSTALLATIE.<br />
Vervangen: Isolatie van het gehele koudwaternet … tot op de watermeter in<br />
de woningen.<br />
Door: Isolatie van het koudwaternet …tot en met de galerij (exclusief de<br />
trappenhuizen en woningen).<br />
60.11.10-a Warm-waterverwarmingsinstallatie<br />
Toevoegen: De woningen worden voorzien van lage temperatuur<br />
verwarming met een temperatuurtraject van 55-35 °C<br />
Vervangen: “ De transportleidingen naar de woningen…galerij, uitgevoerd<br />
in tichelmansysteem”<br />
Door: ” De transportleidingen naar de woningen…galerij, uitgevoerd in een<br />
standaard twee-pijpssyteem (toevoer en retour)”<br />
Per aansluiting op de woningstrang een drukgeregelde inregelafsluiter<br />
opnemen boven een serviceluik in het plafond<br />
60.12.20-b Installatieberekening cv-ditributieleidingen<br />
Vervangen : ….. van het CV-water van (gr. C): 90/70<br />
Door: ….. van het CV-water van (gr. C): 55/35<br />
60.71.13-a Tweewegregelafsluiter<br />
Toevoegen:<br />
Strangafsluiter, drukverschilregelaar<br />
Fabrikaat: T&A<br />
Type: STAP en STAD<br />
<strong>No</strong>minale doorlaat (DN) : conform berekening<br />
Debiet(m3/h): conform berekening<br />
Bediening: handmatig<br />
Warm-waterverwarmingsinstallatie<br />
Drukverschilregelaars in de aansluitleidingen naar de woningstrangen ten<br />
behoeve van het nivelleren van de drukverschillen.<br />
Bijlage: Tekeningen W801-1 Principeschema warmteopwekking cv- en warmtapwater<br />
Ketelhuizen revisie B d.d. 7 maart 2008<br />
SCHREUDER GROEP<br />
INGENIEURS/ADVISEURS<br />
Maarssen, 7 maart 2008<br />
T.C. Kil<br />
Coll. :<br />
2
LIJST BOUWKUNDIGE VOORZIENINGEN AANNEMER, versie 2<br />
Project : Woningen Het Breed<br />
Projectnummer : 54009Eco, kavel 4<br />
Datum : 14 oktober 2005<br />
Van : T.C Kil<br />
Vestiging : Maarssen<br />
ALGEMEEN:<br />
1. Het coördineren van het project, d.w.z. het tijdens de uitvoering overleggen met de andere<br />
bouwpartners, het verwerken van de werkplangegevens van de andere bouwpartners, enz.;<br />
2. Het opstarten en bewaken van de sparingtekeningen-procedure;<br />
3. Het aanstellen van een V&G-coördinator en het bewaken van het veiligheids- en<br />
gezondheidsplan;<br />
4. Het leveren van bouwstroom en bouwwater voor de andere bouwpartners;<br />
5. Het aanwerken van de sparingen tot op de doorvoerhuls <strong>of</strong> koker van de installatie, conform<br />
de eisen en/<strong>of</strong> kwaliteiten van de bouwkundige constructie – brandwerend <strong>of</strong> waterdicht;<br />
inclusief het aanmetselen van brandkleppen in het ventilatiesysteem; (de ruimte tussen de<br />
doorvoerhuls en het installatie-onderdeel wordt door de installateur dichtgezet),<br />
6. De vloeren van het ketelhuis voorzien van een st<strong>of</strong>vrije coating;<br />
7. Schilderwerk van gasleidingen in het zicht, ca 40 meter per ketelhuis.<br />
Voorzieningen in en op het ketelhuis (per ketelhuis)<br />
1. Het maken van beton opstortingen in de ketelhuizen te weten<br />
Ketels 5x 2000x500x 100<br />
Boilervaten 7x 1200x1200x100<br />
TSA 2x 1000x500x100<br />
CV-verdeler 1x 2800x600x100<br />
Opstortingen per ketelhuis, te voorzien van verzinkt stalen hoeklijn<br />
2. Het inzagen en uithakken van sparingen in bestaande beton/metselwand buitengevel ten<br />
behoeve van ventilatieroosters 2x ca 900x550 per ketelhuis.<br />
3. Het plaatsen van een nieuwe buitengevel voorzien van een rooster(deur <strong>of</strong> demontabele<br />
delen) afm 2200x1150 per ketelhuis. Het deel van de pui grenzend aan de naastgelegen<br />
woning brandwerend uitvoeren tegen brandoverslag<br />
4. Het dichtmetselen met kalkzandsteen van een opening (60 min brandwerend) in de<br />
ketelhuizen ca 4.5 m² per ketelhuis.<br />
5. Het metselen met kalkzandsteen van een wand , inclusief toegangsdeur in het ketelhuis,<br />
wand en deur 60 min brandwerend, per ketelhuis. Dagmaat deur ca 800 mm.<br />
6. het openhakken/zagen van sparingen in een betonwand en de bestaande gemetselde<br />
rookgasafvoeren in het ketelhuis 2x 700x1000 inclusief het aanbrengen van raveelconstructie<br />
voor het opvangen van bovenliggend metselwerk en het aanwerken van de sparingen rondom<br />
de nieuwe rookgaskanalen, per ketelhuis.<br />
7. Het boren van sparingen in bestaande betonvloeren 6x Ø100 en 2x Ø 200 , per ketelhuis<br />
8. Het boren van sparingen in betonwanden 17x Ø100, 8x Ø150 en 4x Ø200, per ketelhuis<br />
9. Het boren van sparingen in de dakvloer 4x Ø125, per ketelhuis.<br />
Lijst bouwkundige voorzieningen 051014 pagina 1 van 2 print 03-02-09
TOEVOEGING NAAR AANLEDING VAN DE NOTA<br />
Sloopwerk in de bestaande ketelhuizen, per ketelhuis.<br />
1. stukje verhoogde tegelvloer ca. 1 m² met de dikte van een tegel, en vlak afwerken.<br />
2. beton opstorting onder de bestaande cv-ketels 4x 0,8 m² hoogte ca 40 cm.<br />
3. slopen en dichtmetselen van gaten in de bestaande rookgasafvoeren 2x 50x 50 cm en 2x<br />
70x70 cm .<br />
4. De schermplaten achter de ronde ventilatierooster in het ketelhuis.<br />
5. Het dichtzetten van de ronde ventilatie roosters met sandwich paneel dubbel<br />
aluminium 3 stuks 1500x1500, per ketelhuis in antrecietkleur.<br />
SCHREUDER GROEP<br />
INGENIEURS/ADVISEURS<br />
Maarssen, 14-10-2005<br />
T.C.. Kil<br />
Coll. :<br />
Lijst bouwkundige voorzieningen 051014 pagina 2 van 2 print 03-02-09
LIJST BOUWKUNDIGE VOORZIENINGEN DAKDEKKER, versie 2<br />
Project : Woningen Het Breed, kavel 4<br />
Projectnummer : 54009Eco<br />
Datum : 14 oktober 2005<br />
Van : T.C Kil<br />
Vestiging : Maarssen<br />
Wijzigingen te gevolge van de nota zijn vet aangegeven<br />
ALGEMEEN:<br />
1. Het coördineren van het project, d.w.z. het tijdens de uitvoering overleggen met de andere<br />
bouwpartners, het verwerken van de werkplangegevens van de andere bouwpartners, enz.;<br />
Voorzieningen op het dak<br />
1. Het inplakken en isoleren van 540 steunpoten op het dak ten behoeve van de<br />
ondersteuningsconstructies van de zonnecollectoren, zie ook tek W160 (bestek 54009Eco)<br />
2. Het inplakken van 540 plakplaten ten behoeve van hemelwaterafvoeren.<br />
3. Het inplakken van <strong>42</strong>0 plakplaten ten behoeve van ontluchtingskappen.<br />
4. Het inplakken 20 plaklaten ten behoeve van leiding doorvoeringen door het dak.<br />
5. Het inplakken van 270 plakplaten ten behoeve van ventilatieopeningen boven de<br />
portieken.<br />
6.<br />
SCHREUDER GROEP<br />
INGENIEURS/ADVISEURS<br />
Maarssen, 14-10-2005<br />
T.C.. Kil<br />
Coll. :<br />
Lijst bouwkundige voorzieningen 051014 pagina 1 van 1 print 03-02-09
Tekeningenlijst<br />
Project: Woningen Het Breed<br />
Proj.nr: 54009Eco<br />
Datum: 15-sep-05<br />
tek.nr. omschrijving<br />
schaal<br />
formaat<br />
laatste versie verzonden aan<br />
1 2 3 4 5 6 7 aantal<br />
W160 Daktekening zonnecollectoren 1:10/100/200 A0 BESTEK<br />
W700 Principe indeling ketelhuis 1:50 A1 BESTEK<br />
W801 Principe schema Eco Energy installatie NVT A0 BESTEK<br />
status