Monokote® Fire Protection Systems - Ireland - Grace Construction ...
Monokote® Fire Protection Systems - Ireland - Grace Construction ...
Monokote® Fire Protection Systems - Ireland - Grace Construction ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
G R A C E C O N S T R U C T I O N P R O D U C T S<br />
Monokote ®<br />
<strong>Fire</strong> <strong>Protection</strong> <strong>Systems</strong>
2<br />
<strong>Grace</strong> <strong>Construction</strong> Products (GCP), a business unit of<br />
W.R. <strong>Grace</strong> & Co. is a leading producer of fire<br />
protection systems, structural waterproofing systems,<br />
concrete admixtures, cement additives and masonry<br />
products. With over 2000 employees throughout the<br />
world, GCP is a global organisation with 125 locations<br />
and customers in over 50 countries. In the UK, GCP<br />
products are sold through <strong>Grace</strong> Servicised ® , specialists<br />
in structural waterproofing, fire protection and anticorrosion<br />
pipewraps.<br />
Protecting the World’s Most
An Industry Leader - Worldwide<br />
Our Aim<br />
GCP subscribes to the best practices<br />
ideal, so that new ideas are constantly<br />
introduced and shared. New products<br />
and improved versions of our already<br />
successful products are being<br />
commercialised regularly. We encourage<br />
and support leading-edge thinking.<br />
Customers Drive Our Business<br />
Not only does GCP pinpoint R&D<br />
projects to meet highly specific customer<br />
needs, but we strive to be ahead of the<br />
curve in anticipating industry<br />
developments and providing best-value<br />
solutions. Our partnership with our<br />
customers ensures both their success and<br />
their customers’ success.<br />
Important Structures<br />
Innovative Technology<br />
From the beginning GCP has put a<br />
premium on the unique rather than the<br />
me-too, on leading-edge R&D in all<br />
areas. <strong>Grace</strong> has research and technical<br />
support facilities in Europe, North<br />
America and Asia Pacific.<br />
Service & Support<br />
GCP offers a level of service and support<br />
for our products that is unique in the<br />
industry. Our customers credit the<br />
assistance of their <strong>Grace</strong> sales<br />
representative as the single most<br />
important service our company offers,<br />
providing global and local assistance<br />
throughout all phases of a project.<br />
3
4<br />
The structural fire protection used in a building is a life safety system<br />
for its occupants. All fire protection systems must have passed a fire<br />
test and a series of appraisals that are carried out under laboratory<br />
conditions. However, for a product to give the necessary protection<br />
to a structure and its occupants it must be installed properly. To<br />
ensure a high standard of installation is maintained, <strong>Grace</strong> only sells<br />
Monokote ® High Yield fireproofing systems to contractors who are<br />
members of its Team 1 scheme and who have been trained by the<br />
company in the correct application of its systems.<br />
<strong>Grace</strong> requires that all<br />
Team 1 contractors that<br />
install Monokote <strong>Fire</strong><br />
<strong>Protection</strong> <strong>Systems</strong> are<br />
members of both FIRAS and<br />
ASFP. This ensures on-going,<br />
independent monitoring of<br />
installed product quality.<br />
Team 1 - We’ll not only help you solve
The <strong>Fire</strong> Accredition Scheme (FIRAS) is<br />
an independent organisation for<br />
installers/applicators of passive fire<br />
protection products. The scheme was<br />
born out of a concern that the level of<br />
skill and understanding of many<br />
contractors installing an increasing<br />
number of sophisticated fire protection<br />
products was too low<br />
to ensure adequate<br />
levels of workmanship.<br />
The FIRAS scheme enables installers/<br />
applicators to gain the necessary skills,<br />
not only through training, but also by<br />
monitoring their workmanship. This is<br />
done on an ongoing basis through site<br />
inspections and checks of their quality<br />
management systems. A FIRAS<br />
Accredited Installer is then assessed as<br />
Team 1<br />
competent to undertake the<br />
installation/application of a range of<br />
passive fire protection products.<br />
The Association for Specialist <strong>Fire</strong><br />
<strong>Protection</strong> (ASFP) was set up in 1975 to<br />
promote best practices in the fire<br />
protection industry and it has a<br />
membership made up of manufacturers<br />
and installers of passive fire protection<br />
systems. Manufacturer members of the<br />
ASFP submit their products and test<br />
data for independent<br />
scrutiny prior to inclusion<br />
of the product in the<br />
‘Yellow Book’. Installers<br />
are audited to check that<br />
they are sufficiently<br />
competent to carry out<br />
appropriate projects.<br />
www.asfp.org.uk<br />
problems, we’ll help you avoid them.<br />
5
6<br />
Performance Under <strong>Fire</strong><br />
Temperatures in the First Interstate Bank<br />
blaze soared to more than 1100 °C,<br />
disintegrating gypsum wallboard,<br />
melting desks, chairs and making<br />
twisted wrecks of metal ducts on four<br />
floors. But the fireproofed structural<br />
floor beams, columns and decking<br />
withstood the onslaught, limiting the<br />
spread of the fire and preventing total<br />
building collapse.<br />
The fireproofing commenced in 1972<br />
but not with Monokote ® . After the<br />
fireproofing had been completed on<br />
floors 1-9, the decision was made to<br />
finish the project with Monokote. When<br />
fire subsequently broke out on the 12th<br />
floor, Monokote was where it was<br />
supposed to be – adhered to the steel.<br />
In-place performance is critical in a real<br />
fire where fireproofing is tested more<br />
severely than is ever simulated under<br />
laboratory fire test conditions. The<br />
fireproofing’s ability to meet critical<br />
standards of air erosion, bond strength,<br />
impact and abrasion resistance is vital.<br />
In the chaos of the First Interstate fire,<br />
superheated air rushed through exposed<br />
shafts and around the outside of the<br />
steel and the Monokote was subjected to<br />
impact abuse and abrasion damage from<br />
hoses and fire fighting equipment. The<br />
building still stands, a testimony to the<br />
ultimate benefit of Monokote’s solid inplace<br />
performance.<br />
Monokote fireproofing was the last line<br />
of defence for the First Interstate Bank, a<br />
building which had no operational<br />
sprinkler system. Passive fire protection<br />
systems should never be traded off<br />
against the cost of automatic sprinklers<br />
or other fire fighting improvements.<br />
Even in buildings with sprinkler systems,<br />
the back-up protection of Monokote is<br />
vitally important.<br />
With the help of Monokote, a<br />
catastrophe was averted at the First<br />
Interstate Bank building, proving that in<br />
a major fire Monokote maintains the<br />
structural integrity of the building and<br />
functions effectively as a life safety<br />
system.<br />
Thanks to a wise decision made in 1972, and a firstrate<br />
team of over 275 firefighters, the First Interstate<br />
Bank building in Los Angeles is still standing after<br />
the largest high-rise fire in California history …
MONOKOTE ® FIREPROOFING<br />
A range of gypsum and portland cement<br />
based, spray applied fire protection systems.<br />
Used to provide passive fire protection to<br />
steel and concrete framed structures.<br />
MONOKOTE ® MK-6/HY <br />
For concealed, commercial applications.<br />
MK-6/HY forms a durable surface that does<br />
not dust or flake. It uses a unique injection<br />
system at the nozzle that accelerates the<br />
material set. This enables MK-6/HY to<br />
withstand typical weather conditions during<br />
the ‘open envelope’ construction phase. Final<br />
thicknesses can be achieved immediately<br />
unlike conventional spray systems that<br />
require several hours between coats.<br />
Installed only by trained Team 1 applicators.<br />
MONOKOTE ® MK-6/HY ES <br />
This system allows the material to be left in<br />
the lines for several days unlike<br />
conventional spray systems that require<br />
daily wash-out. Waste is reduced,<br />
productivity increased and the building<br />
schedule accelerated. Leaving MK-6/HY ES<br />
in the hoses overnight means an earlier<br />
start can be made the next day. Installed<br />
only by trained Team 1 applicators.<br />
MONOKOTE ® MK-6s<br />
For commercial concealed applications.<br />
MK-6s is specifically designed to be cost<br />
System Introduction<br />
effective on smaller projects, with greater<br />
simplicity of installation.<br />
MONOKOTE ® Z-106/HY <br />
For semi exposed commercial applications,<br />
susceptible to damage. A portland cement<br />
based material specifically formulated for<br />
use in areas susceptible to damage and high<br />
humidity. Z-106/HY utilises the same<br />
unique injection system for accelerated set<br />
as MK-6/HY.<br />
MONOKOTE ® Z-146<br />
For the most demanding commercial and<br />
industrial applications, where impact and<br />
abrasion are likely. Suitable for fully<br />
exposed and external applications. Z-146 is<br />
a hard wearing, portland cement based<br />
formulation that can be trowel finished.<br />
Approvals<br />
Monokote has been fully tested and asessed to the<br />
following Standards:<br />
UK BS 476 Part 21:1987<br />
France DTU <strong>Fire</strong> Testing Method (1982)<br />
ISO - 834<br />
Germany DIN 4102<br />
Spain PNE 23.820<br />
USA UL 263 / ASTM E119<br />
Canada ULC S101<br />
Japan JIS A 1304<br />
Asia Pacific BS 476 Part 21: 1987<br />
Korea KSF-2257<br />
The most cost effective and fastest applied systems<br />
available for fire protection of steel and concrete structures.<br />
7
8<br />
Product Name Applications Use<br />
Monokote ® Commercial For protection of steel and concrete structures.<br />
MK-6/HY concealed MK-6/HY can be applied from one central<br />
pumping station to a building of up to 50 storeys.<br />
MK-6/HY is light weight, economical and fast to<br />
apply. The use of an injection process at the gun<br />
head sets this material typically within 15 minutes.<br />
Monokote ® MK-6s Commercial A simple one-component system for<br />
concealed small projects.<br />
Monokote ® Commercial Monokote MK-6/HY ES has been developed in<br />
MK-6/HY concealed conjunction with MK-6/HY, to be left in the lines<br />
Extended Set overnight. This removes the need for daily wash-out<br />
and reduces water consumption and waste.<br />
Monokote ® Commercial Harder than MK-6, used to protect steel and<br />
Z-106/HY ® concealed and concrete in areas susceptible to physical abuse and<br />
semi-exposed or mechanical damage, eg. car parks and elevator<br />
shafts. Also suitable for humid areas such as<br />
swimming pools. Uses the same injection process as<br />
MK-6/HY, will set typically within 15 minutes.<br />
Monokote ® Z-146 Commercial and High density material suitable for structural<br />
Industrial. protection in industrial areas where impact<br />
Exposed and and abrasion are likely. Suitable for fully exposed<br />
external and external applications, eg. manufacturing areas<br />
and semi-conductor plants.<br />
Monokote ® offers a family of products
Passive <strong>Fire</strong> <strong>Protection</strong> <strong>Systems</strong><br />
<strong>Grace</strong> <strong>Construction</strong> Products has developed a family of Monokote ® formulations designed to<br />
provide fire protection for the Commercial and Industrial segments of the construction industry.<br />
Binder Thickness Rating Range Application By<br />
Gypsum 10mm to 84mm Up to 4 hours Team 1 contractor<br />
ONLY<br />
Gypsum 10mm to 84mm Up to 4 hours Competent <strong>Fire</strong><br />
<strong>Protection</strong> Contractor<br />
Gypsum 10mm to 84mm Up to 4 hours Team 1 contractor<br />
ONLY<br />
Cement 10mm to 65mm Up to 4 hours Team 1 contractor<br />
ONLY<br />
Cement 10mm to 46mm Up to 4 hours Competent <strong>Fire</strong><br />
<strong>Protection</strong> Contractor<br />
for every fire protection need …<br />
9
10<br />
UNITED KINGDOM<br />
Canary Wharf - Citibank/<br />
Citicorp /HSBC<br />
London<br />
Mailbox Building Birmingham<br />
Old Trafford Stadium Manchester<br />
Airport Extension Edinburgh<br />
City Point City of London<br />
The Governors House City of London<br />
Queen Elizabeth II Hospital London<br />
Norton Healthcare Docklands,<br />
London<br />
The Oracle Centre Reading<br />
Ford Van Plant Southampton<br />
A406 Fore Street Tunnel London<br />
FRANCE<br />
Nuclear Centre Chinon<br />
Airport Lille Lesquin Lille<br />
Eurodisney / Space Mountain Marne la Vallée<br />
University Hospital Nantes<br />
Japanese Cultural Centre Paris<br />
AXA Life Assurance HQ Paris<br />
SNCF Eurostar Station Paris<br />
Stade de France Paris<br />
Louvre Museum Paris<br />
French Television HQ Paris<br />
Triangle de l'Arche De<br />
La Défense<br />
Paris<br />
BELGIUM<br />
Charlemagne Building Brussels<br />
Joseph II Building Brussels<br />
Credit Lyonnais Brussels<br />
IRELAND<br />
Vistacom Limerick<br />
Gresham Hotel Dublin<br />
Warner Lambert Cork<br />
Project References<br />
USA<br />
Denver International Airport Denver, CO<br />
Eli Lilly (Biotechnology<br />
Development Laboratories)<br />
Indianapolis, IN<br />
Procter & Gamble Health Care<br />
Research Center<br />
Cincinnati, OH<br />
Pfizer Inc<br />
(Organic Synthesis Production)<br />
Groton, CT<br />
Manchester Wastewater<br />
Treatment Facility<br />
Manchester, NH<br />
Japan Airlines Cargo Facility New York, NY<br />
World Trade Center New York, NY<br />
Philadelphia Convention Center Philadelphia, PA<br />
Delta Airlines Terminal Orlando, FL<br />
NASA Space Shuttle<br />
Assembly Facility<br />
Titusville, FL<br />
Hartfield Airport Int. Concourse Atlanta, GA<br />
Apple Computer R&D Complex Cupertino, CA<br />
Museum of Modern Art San Francisco,<br />
CA<br />
New York, New York Las Vegas, NV<br />
CANADA<br />
McMaster University Hamilton, ON<br />
Medical Center<br />
Ericsson Center Montreal, QE<br />
Hydro-Quebec Head Office Montreal, QE<br />
ASIA<br />
Bank of China Building Hong Kong<br />
Ocean Tower Building Busan, Korea<br />
Kuala Lumpar City Centre Malaysia<br />
(Tower 1)<br />
Raffles City Singapore<br />
T&C Tower Kaohsiung,<br />
Taiwan<br />
United Nations Building Bangkok,<br />
Thailand<br />
A selection of global projects where Monokote ®<br />
products have been successfully employed.
KEY FIRE PROTECTION LOCATIONS<br />
NORTH AMERICA<br />
United States of America<br />
W.R. <strong>Grace</strong> Co.-Conn.<br />
62 Whittemore Avenue<br />
Cambridge MA 02140<br />
Tel +617 876 1400<br />
Fax +617 498 4311<br />
Canada - Toronto<br />
W.R. <strong>Grace</strong> & Co. of Canada Ltd<br />
294 Clements Road West<br />
Ajax Ontario L1S 3C6<br />
Tel +905 683 8561<br />
Fax +905 683 5947<br />
Canada - Québec<br />
W.R. <strong>Grace</strong> et Cie. du Canada Ltée<br />
25 avenue Lafluer<br />
Lasalle Québec H8R 3H4<br />
Tel +514 366 3362<br />
Fax +514 366 0727<br />
ASIA PACIFIC<br />
Australia<br />
<strong>Grace</strong> Australia Pty Ltd<br />
ACN 004 207 532<br />
Block M Regal Street<br />
Regents Park Estate<br />
391 Park Road<br />
Regents Park NSW 2143<br />
Tel +61 (2) 896 8396<br />
Fax +61 (2) 896 8397<br />
Hong Kong<br />
W.R. <strong>Grace</strong> (Hong Kong) Ltd<br />
Devon House 20th Floor<br />
979 King’s Road<br />
Quarry Bay<br />
Tel +852 (2) 590 2828<br />
Fax +852 (2) 856 0709<br />
Indonesia<br />
W.R. <strong>Grace</strong> (Hong Kong) Ltd<br />
Office 304<br />
3rd Floor South Tower<br />
Plaza Kuningan JL<br />
HR Rasuna said Kav. C11-14<br />
Jakarta 12810<br />
Tel +62 (21) 521 2708<br />
Fax +62 (21) 521 2705<br />
Japan<br />
<strong>Construction</strong> Materials Group<br />
Nichimen Corporation<br />
Shiba 4-Chome Minato-Ku<br />
Tokyo 108<br />
Tel +81 (3) 5446 1576<br />
Fax +81 (3) 5446 1549<br />
Korea<br />
<strong>Grace</strong> Korea Inc.<br />
70-3 Namdong Industrial Complex<br />
639 Kojan-Dong Namdong-Ku<br />
Inchon City 405-310<br />
Tel +82 (32) 814 2054-7<br />
Fax +82 (32) 814 2058<br />
Malaysia<br />
W.R. <strong>Grace</strong> (Malaysia) Sdn Bhd<br />
7 Lorong 1 Jalan Satu<br />
off Jalan Balakong<br />
43200 Cheras Jaya<br />
Selangor Darul Ehsan<br />
Tel +60 (3) 904 6133<br />
Fax +60 (3) 904 9232<br />
Singapore<br />
W.R. <strong>Grace</strong> (Singapore) Pte Ltd<br />
25 Tanjong Penjuru<br />
Jurong Industrial Town<br />
Singapore 609024<br />
Tel +65 265 3033<br />
Fax +65 265 9232<br />
Taiwan<br />
W.R.<strong>Grace</strong> (Taiwan) Ltd<br />
Taipei Sales Office<br />
14F-1 No30 Pei Ping E Road<br />
Taipei<br />
Tel +886 (2) 3956081<br />
Fax +886 (2) 3413585<br />
Thailand<br />
W.R.<strong>Grace</strong> (Thailand) Ltd<br />
Wong Wai Wit Building<br />
2/F 889 Srinakarin-Teparuk Road<br />
Amphur Muang<br />
Samutprakan 10270<br />
Tel +66 (2) 748 7921<br />
Fax +66 (2) 748 7341<br />
EUROPE<br />
France<br />
W.R. <strong>Grace</strong> S.A.S<br />
<strong>Construction</strong> Products<br />
33 Route du Gallardon BP 39<br />
F-28234 EPERNON Cedex<br />
Tel +33 (0) 237 188 734<br />
Fax +33 (0) 237 188 691<br />
United Kingdom<br />
<strong>Grace</strong> <strong>Construction</strong> Products<br />
Ajax Avenue<br />
Slough<br />
Berkshire SL1 4BH<br />
Tel +44 (0)1753 692929<br />
Fax +44 (0) 1753 691623<br />
LATIN AMERICA<br />
Argentina<br />
<strong>Grace</strong> Argentina S.A.<br />
Primera Junta 550<br />
(1878) Quilmes<br />
Prov Buenos Aires<br />
Tel +54 (11) 229 0146<br />
Fax +54 (11) 229 0193<br />
Brazil<br />
<strong>Grace</strong> Brasil Ltda<br />
Avenida Mofarrej 619<br />
05311 902 Sao Paulo SP<br />
Tel +55 (11) 833 2708<br />
Tel +55 (11) 833 2766<br />
www.asfp.org.uk<br />
Visit our web site : www.graceconstruction.com<br />
<strong>Grace</strong> <strong>Construction</strong> Products Limited Ajax Avenue Slough Berkshire SL1 4BH<br />
Monokote is a registered trademark, and Extended Set , HY, MK-6 are trademarks of W R <strong>Grace</strong> & Co.-Conn.<br />
The information given is based on data and knowledge considered to be true and accurate and is offered for the user’s consideration,<br />
investigation and verification. Since the conditions of use are beyond our control we do not warrant the results to be obtained. Please read<br />
all statements, recommendations or suggestions in conjunction with our conditions of sale including those limiting warranties and remedies<br />
which apply to all goods supplied by us. No statement, recommendation or suggestion is intended for any use which would violate or<br />
infringe statutory obligations or any rights belonging to a third party.<br />
Copyright 2001. <strong>Grace</strong> <strong>Construction</strong> Products Limited Printed in England - 06.01 - Ref. UKFPBR001