07.12.2016 Views

“What do we do with these floors of ours!?”

GfOW306SCDz

GfOW306SCDz

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

What’s Inside...<br />

RPM<br />

Who We Are<br />

What We Do<br />

Why You Should Give Us a Try<br />

COVERAGE<br />

Where We Are | Where We Go<br />

How it Works<br />

WHY POLISH<br />

Advantages<br />

Go Green! – Everyone’s Doing It...<br />

Alternative Solutions<br />

The Process – How Do We Do It<br />

Respect The Spec!<br />

Not That You Need it – But Here is Our 10 Year Warranty!<br />

OUR SCOPES<br />

Sealed Concrete<br />

Polished Concrete<br />

Stained Concrete<br />

Epoxy Coatings<br />

Surface Preparation | Remediation<br />

IMAGE GALLERY<br />

Examples <strong>of</strong> Beautified Concrete<br />

003<br />

003<br />

003<br />

003<br />

005<br />

006<br />

007<br />

009<br />

009<br />

010<br />

011<br />

012<br />

013<br />

014<br />

015<br />

015<br />

017<br />

019<br />

021<br />

023<br />

025<br />

025<br />

<strong>“What</strong> <strong>do</strong> <strong>we</strong> <strong>do</strong> <strong>with</strong><br />

<strong>these</strong> <strong>floors</strong> <strong>of</strong> <strong>ours</strong>!?<strong>”</strong>


RPM is Retail Polishing Management LLC.<br />

For many years, our clients have been requesting a better solution for their<br />

regional, national, and even international concrete floor processing solutions.<br />

Current national, local, and regional providers have not been successful<br />

in meeting those expectations on service or value.<br />

In 2014, a group <strong>of</strong> very successful larger regional polishing companies came<br />

together, formed a new company and developed a new approach to address<br />

the demand. Since then, our network <strong>of</strong> DPC’s (Diamond Polishing Contractors)<br />

has increased significantly, providing a unique coverage reach and<br />

response unequal in our industry.<br />

We provide Concrete Sealing, Staining, Polishing, Coating and Surface Preparation<br />

& Remediation Services to clients whose various real estate interests<br />

are diversely located geographically.<br />

Local Response, Regional Coverage and National Support are what you can<br />

expect when you contract <strong>with</strong> RPM. With our network <strong>of</strong> DPC’s, <strong>of</strong> which<br />

most are actual owners <strong>of</strong> RPM, you get an owner level commitment not a<br />

regional manager response.<br />

When you are an RPM National Account Client, a single call is all it takes to get<br />

equipment and personnel to any <strong>of</strong> your locations throughout the Continental<br />

United States, Hawaii, Alaska, Puerto Rico, and ever expanding international<br />

locales.<br />

• Besides Beautiful Concrete?<br />

• Your project always comes first!<br />

• Predictable Results you can count on<br />

• Ease <strong>of</strong> Consolidated Administration<br />

• Customized Project Management Attention<br />

• Bulletpro<strong>of</strong> Preventive Maintenance Solutions<br />

• Ownership Level Commitment Everytime<br />

• Tertiary Coverage in Most Regions<br />

• Union Site Coverage<br />

• Unprecedented Responsiveness<br />

• Value Added Solutions to Save Your Budgets!<br />

• And Whatever We Can Imagine Together!<br />

“I cannot imagine a better group <strong>of</strong> leading industry pr<strong>of</strong>essionals<br />

to have as partners. It is genuinely an honor to have the opportunity<br />

<strong>of</strong> working together each and every day and I would like to share<br />

that same pleasure and experience <strong>with</strong> you and your company as<br />

<strong>we</strong>ll...<strong>”</strong><br />

- Tim Kennady<br />

President | JHKJHKJH


... and Growing!<br />

Minneapolis MN<br />

Allentown PA<br />

“19 Companies from 29 Locations<br />

operating out <strong>of</strong> 21 States supported<br />

by more than 300 heavy<br />

grinding platforms and a service<br />

capacity <strong>of</strong> almost 100 MSF annually?<br />

All working together this incredibly<br />

organized and effective!?<br />

Houston TX<br />

I mean... WOW!<strong>”</strong><br />

RPM has secondary even tertiary coverage in most regions <strong>of</strong> the Continental<br />

United States, and <strong>with</strong> <strong>we</strong>ll resourced locations in Hawaii, Alaska, and Puerto<br />

Rico - You can count on RPM to cover all <strong>of</strong> your real estate interests. We also<br />

have you covered at sites where union labor is a requirement.


40'-0"<br />

30'-0"<br />

7<br />

F<br />

E<br />

D<br />

C<br />

40'-0" 31'-0"<br />

40'-0"<br />

31'-0"<br />

16'-0" 30'-0" 40'-0" 30'-0" 16'-0"<br />

212'-0"<br />

132'-0"<br />

A2 FINISH PLAN<br />

SCALE: 1/8" = 1'-0"<br />

1. ALL WA LS TO BE PAINTED W/ VINYL BASE<br />

UNLESS NOTED OTHERWISE. S E ELEVATIONS AND FINISH SCHEDULE FOR<br />

MORE INFORMATION.<br />

E6 GENERAL NOTES<br />

5. REMOVE A L BURNISHES & SEALANTS FROM CONCRETE SLAB IF<br />

NECESSARY.<br />

A L CARPET TILES ON SALES FLOOR ARE SURFACE MOUNTED OVER FINISHED<br />

FLOOR. TO BE PROVIDED AND INSTALLED BY SAKS FIFTH AVE.<br />

ALL CARPET TILES TO BE 19.7" X 19.7"<br />

3.<br />

4.<br />

6. REFER TO FOR SLAB PATCHING DETAILS.<br />

E4<br />

A-802<br />

ALL EXPOSED ROOF DRAINS, PIPING/CONDUIT AND COLUMNS TO BE<br />

PAINTED (PT-1).<br />

2.<br />

E5 FINISH LEGEND<br />

POLISHED CONCRETE<br />

VINYL PLANK FLOORING<br />

SEALED CONCRETE<br />

VT<br />

1<br />

PC 1<br />

S<br />

1<br />

CARPET CPT<br />

1<br />

0 351 CONCRETE FLOOR FINISHES<br />

POLISHED CONCRETE PROCE S:<br />

A. SURFACE TREATMENTS FOR CONCRETE FLOORS AND SLABS.<br />

THE FO LOWING IS A STEP BY STEP PROCE S FOR THE TREATMENT OF THE POLISHED<br />

CONCRETE FLOOR SLABS.<br />

1. REMOVE EXISTING COATINGS IF A PLICABLE. EXISTING CONCRETE SLAB ON THIS<br />

PROJECT IS OLD. GC TO INSTA L ANY IN FLOOR ELECTRICAL ROUGH IN ITEMS PRIOR TO<br />

COMMENCEMENT WITH POLISHED CONCRETE TREATMENT . GC SHA L REVIEW CONDITIONS<br />

ONSITE. CLEAN AND REPAIR ANY DEFICIENT AREAS.<br />

2. SEAL CRACKS AND JOINTS IN THE EXISTING CONCRETE SLAB WITH AN EPOXY OR<br />

OTHER SEMI-RIGID FI LER. THE JOINTS SHA L BE CLEANED AND FI LED WITH<br />

METZGER/MCGUIRE RS-88 - COLOR STANDARD GREY ( OR APPROVED EQUAL PRODUCT ). TOP<br />

OF JOINT TO BE SCRAPED SMOOTH PRIOR TO THE START OF THE GRINDING / POLISHING<br />

PROCE S.<br />

E3 POLISHED CONCRETE INFORMATION<br />

NOTE TO THE G.C. :<br />

PREFE RED POLISHED CONCRETE<br />

VENDOR: QUESTMARK<br />

CONTACT: RON PRI T<br />

(717) 965-9340<br />

3. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 30- OR 40-GRIT<br />

METAL-BONDED DIAMOND.<br />

4. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH AN 80-GRIT METAL-BONDED<br />

DIAMOND.<br />

5. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 150-GRIT METAL-BONDED<br />

DIAMOND.<br />

6. VACUUM AND CLEAN ENTIRE SLAB AREA PRIOR TO THE A PLICATION OF THE CHEMICAL<br />

HARDENER.<br />

7. APPLY A CHEMICAL HARDENER TO DENSIFY THE CONCRETE. PRODUCT EQUAL TO<br />

AMERIPOLISH 3D HSL DENSIFIER.<br />

8. POLISH AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 100- OR 200-GRIT<br />

RESIN-BOND DIAMOND, OR A COMBINATION OF THE TWO.<br />

9. POLISH AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 400-GRIT RESIN-BOND<br />

DIAMOND.<br />

10. VACUUM AND CLEAN ENTIRE SLAB AREA PRIOR TO THE APPLICATION OF THE STAIN<br />

GUARD / SEALER.<br />

11. APPLY A STAIN GUARD TO HELP PROTECT THE POLISHED SURFACE AND MAKE IT EASIER<br />

TO MAINTAIN. PRODUCT EQUAL TO AMERIPOLISH STAIN PROTECTOR - TWO COATS WITH A<br />

BURNISHED POLISH FINISH TO GET THE DESIRED REFLECTIVE SH EN ON THE SURFACE.<br />

POLISHED CONCRETE<br />

PC 1<br />

PC 1 C6<br />

A-802<br />

VT<br />

1 FLOOR<br />

101<br />

SALES<br />

OF DOORS<br />

CPT<br />

2 SIZE: 3X9<br />

QTY: 27 TILES<br />

WALK OFF MAT<br />

C5<br />

A-802<br />

S<br />

1<br />

S<br />

1<br />

S<br />

1<br />

S<br />

1<br />

S<br />

1<br />

S<br />

1<br />

PC 1<br />

PC 1 CPT<br />

1<br />

CPT<br />

1<br />

FT<br />

1<br />

FT<br />

1 C5<br />

A-802<br />

C5<br />

A-802<br />

C5<br />

A-802<br />

A<br />

B<br />

C<br />

D<br />

E<br />

A<br />

B<br />

1 2 3 4 5 6<br />

1 2 3 4 5<br />

UNIFORM DRAWING SYSTEM - U.S. NATIONAL CAD STANDARD VERSION 3.1<br />

SHEET TITLE:<br />

SCALE:<br />

DRAWN BY:<br />

DATE:<br />

FILE:<br />

PROJECT:<br />

FILE LOCATION: p:\2015\15025\Sh ets\A103.dwg PLOT DATE: 6/5/2015 2:20 PM<br />

SHEET OF<br />

-<br />

FINISH PLAN<br />

A103<br />

40'-0"<br />

30'-0"<br />

7<br />

F<br />

E<br />

D<br />

C<br />

B<br />

A<br />

40'-0" 31'-0"<br />

40'-0"<br />

31'-0"<br />

16'-0" 30'-0" 40'-0" 30'-0" 16'-0"<br />

212'-0"<br />

132'-0"<br />

A1 FINISH PLAN<br />

SCALE: 1/8" = 1'-0"<br />

1. A L WALLS TO BE PAINTED W/ VINYL BASE<br />

UNLE S NOTED OTHERWISE. S E ELEVATIONS AND FINISH SCHEDULE FOR<br />

MORE INFORMATION.<br />

PT 1 VB1<br />

E6 GENERAL NOTES<br />

5. REMOVE A L BURNISHES & SEALANTS FROM CONCRETE SLAB IF<br />

NECESSARY.<br />

A L CARPET TILES ON SALES FLOOR ARE SURFACE MOUNTED OVER FINISHED<br />

FLOOR. TO BE PROVIDED AND INSTA LED BY SAKS FIFTH AVE.<br />

A L CARPET TILES TO BE 19.7" X 19.7"<br />

3.<br />

4.<br />

6. REFER TO FOR SLAB PATCHING DETAILS.<br />

E4<br />

A-802<br />

A L EXPOSED ROOF DRAINS, PIPING/CONDUIT AND COLUMNS TO BE<br />

PAINTED (PT-1).<br />

2.<br />

E5 FINISH LEGEND<br />

POLISHED CONCRETE<br />

VINYL PLANK FLOORING<br />

SEALED CONCRETE<br />

VT<br />

1<br />

PC 1<br />

S<br />

1<br />

CARPET CPT<br />

1<br />

03351 CONCRETE FLOOR FINISHES<br />

POLISHED CONCRETE PROCESS:<br />

A. SURFACE TREATMENTS FOR CONCRETE FLOORS AND SLABS.<br />

THE FO LOWING IS A STEP BY STEP PROCE S FOR THE TREATMENT OF THE POLISHED<br />

CONCRETE FLOOR SLABS.<br />

1. REMOVE EXISTING COATINGS IF A PLICABLE. EXISTING CONCRETE SLAB ON THIS<br />

PROJECT IS OLD. GC TO INSTA L ANY IN FLOOR ELECTRICAL ROUGH IN ITEMS PRIOR TO<br />

COMMENCEMENT WITH POLISHED CONCRETE TREATMENT . GC SHA L REVIEW CONDITIONS<br />

ONSITE. CLEAN AND REPAIR ANY DEFICIENT AREAS.<br />

2. SEAL CRACKS AND JOINTS IN THE EXISTING CONCRETE SLAB WITH AN EPOXY OR<br />

OTHER SEMI-RIGID FILLER. THE JOINTS SHA L BE CLEANED AND FI LED WITH<br />

METZGER/MCGUIRE RS-88 - COLOR STANDARD GREY ( OR APPROVED EQUAL PRODUCT ). TOP<br />

OF JOINT TO BE SCRAPED SMOOTH PRIOR TO THE START OF THE GRINDING / POLISHING<br />

PROCE S.<br />

E3 POLISHED CONCRETE INFORMATION<br />

NOTE TO THE G.C. :<br />

PREFERRED POLISHED CONCRETE<br />

VENDOR: QUESTMARK<br />

CONTACT: RON PRI T<br />

(717) 965-9340<br />

3. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 30- OR 40-GRIT<br />

METAL-BONDED DIAMOND.<br />

4. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH AN 80-GRIT METAL-BONDED<br />

DIAMOND.<br />

5. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 150-GRIT METAL-BONDED<br />

DIAMOND.<br />

6. VACUUM AND CLEAN ENTIRE SLAB AREA PRIOR TO THE A PLICATION OF THE CHEMICAL<br />

HARDENER.<br />

7. A PLY A CHEMICAL HARDENER TO DENSIFY THE CONCRETE. PRODUCT EQUAL TO<br />

AMERIPOLISH 3D HSL DENSIFIER.<br />

8. POLISH AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 1 0- OR 200-GRIT<br />

RESIN-BOND DIAMOND, OR A COMBINATION OF THE TWO.<br />

9. POLISH AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 4 0-GRIT RESIN-BOND<br />

DIAMOND.<br />

10. VACUUM AND CLEAN ENTIRE SLAB AREA PRIOR TO THE APPLICATION OF THE STAIN<br />

GUARD / SEALER.<br />

1. A PLY A STAIN GUARD TO HELP PROTECT THE POLISHED SURFACE AND MAKE IT EASIER<br />

TO MAINTAIN. PRODUCT EQUAL TO AMERIPOLISH STAIN PROTECTOR - TWO COATS WITH A<br />

BURNISHED POLISH FINISH TO GET THE DESIRED REFLECTIVE SH EN ON THE SURFACE.<br />

POLISHED CONCRETE<br />

PC 1<br />

PC 1 C6<br />

A-802<br />

VT<br />

1 FLOOR<br />

101<br />

SALES<br />

OF DOORS<br />

CPT<br />

2 SIZE: 3X9<br />

QTY: 27 TILES<br />

WALK O F MAT<br />

C5<br />

A-802<br />

S<br />

1<br />

S<br />

1<br />

S<br />

1<br />

S<br />

1<br />

S<br />

1<br />

S<br />

1<br />

PC 1<br />

PC 1 CPT<br />

1<br />

CPT<br />

1<br />

FT<br />

1<br />

FT<br />

1 C5<br />

A-802<br />

C5<br />

A-802<br />

C5<br />

A-802<br />

A<br />

B<br />

C<br />

D<br />

E<br />

A<br />

B<br />

C<br />

D<br />

E<br />

1 2 3 4 5 6<br />

1 2 3 4 5 6<br />

UNIFORM DRAWING SYSTEM - U.S. NATIONAL CAD STANDARD VERSION 3.1<br />

SHEET TITLE:<br />

SCALE:<br />

DRAWN BY:<br />

DATE:<br />

FILE:<br />

PROJECT:<br />

REVISIONS:<br />

AS NOTED<br />

TENANT IMPROVEMENT<br />

4 MAY 2015<br />

I SUED FOR PLAN CHECK & L A PROVAL<br />

FILE LOCATION: p:\2015\15025\Sh ets\A103.dwg PLOT DATE: 6/5/2015 2:20 PM<br />

A103.DWG<br />

SHEET OF -<br />

-<br />

FINISH PLAN<br />

A102<br />

SHOE’S R US<br />

NOTE TO THE G.C.<br />

PREFERRED POLISHED CONCRETE<br />

VENDOR: RPM - RETAIL POLISHING MANAGEMENT<br />

CONTACT: TIM KENNADY<br />

916-349-1200<br />

SHOES R US | MASTER SPECIFICATION 03 35 40<br />

V02.12.14 03 35 00 - 1<br />

INTERIOR CONCRETE SLAB REPAIRS<br />

AND JOINT FILLER REPLACEMENT<br />

RPM<br />

PART 1 – GENERAL<br />

1.01 SUMMARY:<br />

The purpose <strong>of</strong> this specification is to establish standards <strong>of</strong> work and<br />

pre-determine expected quantity<br />

and costs <strong>of</strong> prep and repair prior to start <strong>of</strong> work.<br />

A. SECTION INCLUDES:<br />

1. Joint fi le removal and replacement, <strong>with</strong> or <strong>with</strong>out metal keyway (slight chipping and spa ling):<br />

a. Contractor is to provide unit price per linear foot for joint fi le removal and replacement<br />

based on the following formula:<br />

1. Total area to be polished X 0.14 = Total projected linear feet <strong>of</strong> joint filler removal and<br />

replacemen to be included and broken out in the bid.<br />

2. Spa led joint repair or joint <strong>with</strong> metalkeyway (less than 3/4<strong>”</strong> spa ling):<br />

a. Contractor is to provide unit price per linear foot for keyway segment removal and fi ler<br />

insta lation based on the fo lowing formula:<br />

1. Total area to be polished X 0.03 = Total projected linear feet <strong>of</strong> keyway segment<br />

removal to be included and broken out in the bid.<br />

3. Spa led joint repair, joint <strong>with</strong> metal keyway or self<br />

-leveling compound removal (grea than 3/4<strong>”</strong><br />

spa ling):<br />

a. Contractor is to provide unit price per linear fot for keyway segment removal and repair<br />

material. Insta lation based on the fo lowing formula:<br />

1. Total area to be polished X 0.03 = Total projected square feet <strong>of</strong> keyway segment and<br />

self-leveling compound removal and repair material. Insta lation to be in<br />

cluded and<br />

broken out in the bid.<br />

4. Crack repair:<br />

a. Contractor is to provide unit price per linear foot for crack cleaning and fi ling based on the<br />

fo lowing formula:<br />

SHOES R US | MASTER SPECIFICATION 03 35 00<br />

v02.12.15 03 35 00 - 1<br />

POLISHED CONCRETE FLOOR FINISH<br />

RPM<br />

PART 1 - GENERAL<br />

1.01 SUMMARY:<br />

A. Insta lation <strong>of</strong> polished concrete floor system for new and/or existing interior concrete <strong>floors</strong> by dry<br />

grinding only, application <strong>of</strong> penetrating concrete hardener/densifier, and polishing <strong>with</strong> various<br />

size grit metal-bonded, hybrid and resin-bonded diamonds to the scheduled specified minimum<br />

local and overa l gloss values.<br />

B. Removal <strong>of</strong> existing epoxy, ceramic, carpet,and/or vinyl composite tile floor finish, and a l existing<br />

underlayment, joint and crack repair products where shown on drawings<br />

C. Application <strong>of</strong> chemical dye and complementary edge band treatment.<br />

D. References:<br />

1. ASTM C 1028 – Standard Test Method for Determining the Static Coefficient <strong>of</strong> Friction <strong>of</strong><br />

Ceramic Tile and Other Like Surfaces by the Horizontal Dynamometer Pu l<br />

-Meter Method.<br />

2. ASTM D 523 – Standard Test Method for Specular Gloss.<br />

3. NFSI - National Floor SafetyInstitute; Test Method 101A; current edition.<br />

1.02 SUMMARY<br />

A. Comply <strong>with</strong> Section 01 XX XX Submittal Procedures<br />

B. PRODUCT DATA:<br />

1. Provide manufacturer's equipment product data sheets for:<br />

a. Planetary grinder polishing equipment<br />

b. Planetary grinder HEPA dust co lection equipment<br />

c. Hand tools<br />

d. Hand tool dust co lection equipment<br />

e. Diamond tooling<br />

f. High speed propane burnisher <strong>with</strong> dust skirt<br />

SPECIFICATIONS<br />

“A<strong>we</strong>some Estimators and Sales Pro’s!<br />

That’s How...<strong>”</strong><br />

In the event that your<br />

company <strong>do</strong>es not<br />

have a comprehensive<br />

specification - RPM has<br />

two options for you;<br />

1. We will customize our time tested<br />

and proven specification template and<br />

make it specific for your company –<br />

Complimentary!<br />

2. Put you into direct contact <strong>with</strong> several<br />

<strong>of</strong> the leading manufacturers in<br />

our industry so you can choose which<br />

is the best solution for your company.<br />

DATE/TIME OWNER/GC TM 1.0 15-1234<br />

STORE # 123 # PHONE Scope <strong>of</strong> Work Description<br />

NAME/DIVISION PM REMOVE FLOOR COVERING ADHESIVE<br />

LOCATION PHONE<br />

ADDRESS 1 SUPER<br />

ADDRESS 2 PHONE<br />

SPACE # A SALES OFFICE<br />

CITY ANYTOWN ESTIMATOR<br />

STATE CA DIRECT<br />

PDCI LIC # EMAIL tkennady@the-rpm-group.com<br />

! !<br />

EQUIPMENT QTY UOM UNIT COST EQUIPMENT MATERIALS LABOR<br />

1 Truck 1.00 Day 100.00<br />

$ 100<br />

$<br />

2 Fuel Surcharge 150.00 Miles 0.58<br />

$ 87<br />

3 Trailer 2.00 Day 100.00<br />

$ 200<br />

4 Generator 2.00 Day 500.00<br />

$ 1,000<br />

5 Fuel Surcharge 2.00 Day 250.00<br />

$ 500<br />

6 Heavy Planetary Grinder Platform 10.00 H<strong>ours</strong> 30.00<br />

$ 300<br />

7 Dust Extraction Equipment 10.00 H<strong>ours</strong> 25.00<br />

$ 250<br />

8 Light Grinder Platform H<strong>ours</strong> 20.00<br />

$ -<br />

9 Vacuum H<strong>ours</strong> 15.00<br />

$ -<br />

10 Hand Grinder for Edge Gridning 5.00 H<strong>ours</strong> 10.00<br />

$ 50<br />

11 Dust Collection Equipment 5.00 H<strong>ours</strong> 5.00<br />

$ 25<br />

12 Post use Inspection, Decontamination & Re-Certification 0.25 Ea. 250.00<br />

$ 63<br />

13 -<br />

14 -<br />

15 -<br />

16 MATERIALS<br />

17 T-REX PCD Scraping Blades 0.25 Set 1,000.00<br />

$ 250<br />

$<br />

18 Metal Bonded Diamond Pads (40,80,100: 10,000 sf) Set 450.00<br />

$ -<br />

19 Transitional Diamond Pads (100,150: 10,000 sf) Set 300.00<br />

$ -<br />

20 Resin Bonded Diamond Pads (100,400,800,1500: 2,500 sf) Set 100.00<br />

$ -<br />

21 Hand Grinding Tooling Ea. 100.00<br />

$ -<br />

22 Sealer Ga lon 10.00<br />

$ -<br />

23 Densifier - Lithium Ga lon 10.00<br />

$ -<br />

24 Densifier - Potasium Ga lon 12.00<br />

$ -<br />

25 Guard Gallon 10.00<br />

$ -<br />

26 Acetone Stain Gallon 15.00<br />

$ -<br />

27 Epoxy SF 6.00<br />

$ -<br />

28 Polyurea Joint Fi ler LF 3.00<br />

$ -<br />

29 Grout Coat SF 1.25<br />

$ -<br />

30 Mender Coat SF 1.25<br />

$ -<br />

31 Burnishing Pad Ea. 180.00<br />

$ -<br />

32 Edging Pads Ea. 180.00<br />

$ -<br />

33 Cleaner/Conditioner Ga lon 8.00<br />

$ -<br />

34 Dye SF 0.10<br />

$ -<br />

35 -<br />

36 -<br />

37 -<br />

38 -<br />

39 -<br />

40 LABOR<br />

41 Field Supervisor<br />

42 Regular Time 10.00 H<strong>ours</strong> 51.15<br />

$ 512<br />

$<br />

43 Overtime H<strong>ours</strong> 76.73<br />

$ -<br />

44 Double Time H<strong>ours</strong> 102.30<br />

$ -<br />

45 Weekend H<strong>ours</strong> 76.73<br />

$ -<br />

46 Holiday H<strong>ours</strong> 102.30<br />

$ -<br />

47 Team Supervisor<br />

48 Regular Time 10.00 H<strong>ours</strong> 46.75<br />

$ 468<br />

49 Overtime H<strong>ours</strong> 70.13<br />

$ -<br />

50 Double Time H<strong>ours</strong> 93.50<br />

$ -<br />

51 Weekend H<strong>ours</strong> 70.13<br />

$ -<br />

52 Holiday H<strong>ours</strong> 93.50<br />

$ -<br />

53 Field Technician<br />

54 Regular Time 10.00 H<strong>ours</strong> 41.50<br />

$ 415<br />

55 Overtime H<strong>ours</strong> 62.25<br />

$ -<br />

56 Double Time H<strong>ours</strong> 83.00<br />

$ -<br />

57 Weekend H<strong>ours</strong> 62.25<br />

$ -<br />

58 Holiday H<strong>ours</strong> 83.00<br />

$ -<br />

59<br />

60 Subcontractor H<strong>ours</strong> -<br />

61 Lodging Workers x Nights 2.00 Ea. 145.00<br />

$ 290<br />

62 Meals Workers x Days 2.00 Ea. 25.00<br />

$ 50<br />

63 -<br />

64 -<br />

65 -<br />

66 TOTAL COSTS 2,575<br />

$ 250<br />

$ 1,734<br />

$<br />

67 TAX 8.75% 22<br />

68 OVERHEAD 10% 257 25 173<br />

69 PROFIT 15% 385 37 259<br />

70 EQUIPMENT MATERIALS LABOR<br />

71 3,217<br />

$ 334<br />

$ 2,167<br />

$<br />

75 Owner/GC Representative Signature Date TOTAL<br />

rev.033015.1<br />

TM 15-1234 SHOES R US #123 - BIG MALL - ANYTOWN CA<br />

SHOES R US #123 - BIG MALL - ANYTOWN CA TIME and MATERIALS<br />

8/3/2015 16:56 OWNER<br />

916-555-1234<br />

SHOES R US<br />

RPM<br />

Tim Kennady<br />

408-898-0256<br />

CA 818796<br />

BIG MALL<br />

1 MAIN ST<br />

5,718<br />

$<br />

-<br />

$<br />

This <strong>do</strong>cument constitutes a proposal for an arrangement under which PDCI is to be paid on the basis <strong>of</strong> (1) actual cost <strong>of</strong> direct labor at specified hourly rates, (2) actual<br />

cost <strong>of</strong> materials and equipment usage, and (3) PDCI's overhead, pr<strong>of</strong>it and applicable tax.<br />

NOT TO EXCEED AMOUNT: COSTS<br />

DATE/TIME OWNER/GC WKSHT 1.0 15-1234<br />

STORE # 123 # PHONE<br />

NAME/DIVISION<br />

PM<br />

LOCATION<br />

PHONE<br />

ADDRESS 1<br />

SUPER<br />

ADDRESS 2<br />

PHONE<br />

SPACE # A SALES OFFICE<br />

CITY ANYTOWN ESTIMATOR<br />

STATE CA DIRECT<br />

PDCI LIC # EMAIL tkennady@the-rpm-group.com 1<br />

! !<br />

MULTIPLIER<br />

TOTAL FROM<br />

MULTIPLIER<br />

UNIT RATE<br />

INCLUDED IN<br />

BID<br />

TOTAL COST<br />

INCLUDED IN BID<br />

1 10,000 sf x 0.00 = 0 lf @ 3.00<br />

$ lf -<br />

$<br />

2 10,000 sf x 0.03 = 300 lf @ 1.50<br />

$ lf 450<br />

$<br />

3 10,000 sf x 0.03 = 300 lf @ 2.00<br />

$ lf 600<br />

$<br />

4 10,000 sf x 0.025 = 250 lf @ 6.00<br />

$ lf 1,500<br />

$<br />

5a 10,000 sf x 0.015 = 150 units @ 2.65<br />

$ ea 398<br />

$<br />

5b 10,000 sf x 0.01 = 100 units @ 4.00<br />

$ ea 400<br />

$<br />

6 10,000 sf x 0.0003 = 3 units @ 50.00<br />

$ ea 150<br />

$<br />

7 10,000 sf x 0.00 = 0 sf @ 10.00<br />

$ sf -<br />

$<br />

8 10,000 sf x 0.00 = 0 sf @ 1.25<br />

$ sf -<br />

$<br />

9 10,000 sf x 0.00 = 0 sf @ 4.50<br />

$ sf -<br />

$<br />

10 10,000 sf x 0.00 = 0 sf @ 0.60<br />

$ sf -<br />

$<br />

11 10,000 sf x 0.00 = 0 sf @ 1.20<br />

$ sf -<br />

$<br />

12 10,000 sf x 0.00 = 0 sf @ 0.75<br />

$ sf -<br />

$<br />

13a 10,000 sf x 0.00 = 0 sf @ 1.25<br />

$ sf -<br />

$<br />

13b 10,000 sf x 0.00 = 0 sf @ 2.25<br />

$ sf -<br />

$<br />

14a 10,000 sf x 0.00 = 0 sf @ 2.00<br />

$ sf -<br />

$<br />

14b 10,000 sf x 0.00 = 0 sf @ 4.00<br />

$ sf -<br />

$<br />

15 10,000 sf x 0.00 = 0 lf @ 10.00<br />

$ lf -<br />

$<br />

16a 10,000 sf x 0.00 = 0 ea @ 1,500<br />

$ ea -<br />

$<br />

16b 10,000 sf x 0.00 = 0 ea @ 2,500<br />

$ ea -<br />

$<br />

17 10,000 sf x 0.00 = 0 ea @ -<br />

$ ea -<br />

$<br />

3,498<br />

$<br />

This form is to be used to illustrate standard calculations for Slab Enhancement, Repair and Joint Filler Replacement. Use <strong>these</strong> numbers to calculate expense<br />

for <strong>these</strong> scopes <strong>of</strong> work in the accompanying Base Bid price. No deductions allo<strong>we</strong>d. Prices include from 0 (zero) - UP TO stated quantities.<br />

WKSHT 15-1234 SHOES R US #123 - BIG MALL - ANYTOWN CA<br />

SHOES R US #123 - BIG MALL - ANYTOWN CA<br />

WORKSHEET<br />

8/3/2015 16:49 OWNER<br />

916-555-1234<br />

SHOES R US<br />

Tim Kennady<br />

408-898-0256<br />

CA 818796<br />

BIG MALL<br />

1 MAIN ST<br />

RPM<br />

Surface Defect Repair, Including Pop-Outs, Spalls and<br />

Gouges 3/4"- 1-1/2" Dia.<br />

Surface Defect Repair, Including Pop-Outs, Spalls and<br />

Gouges 1-1/2" - 6" Dia.<br />

Surface Embed Repair, Including Clean-Outs, In Floor<br />

Electrical Outlets, and Walker Duct Access Holes<br />

Large Surface Repair. Install 3/8" Polished Overlay using<br />

Epoxy Primer<br />

TOTAL<br />

Mobilization/Mock-up (Grind/Polish) - per crew (1-3<br />

persons), truck & tools<br />

Mobilization (non-grind) - per crew (1-3 persons), truck &<br />

tools<br />

Spalled Joint Repair or Joint <strong>with</strong> Metal Keyway - Less<br />

than 3/4"<br />

Spalled Joint Repair, Joint <strong>with</strong> Metal Keyway or Self-<br />

Leveling Compound Removal - Greater than 3/4"<br />

Crack Repair<br />

ITEM<br />

AREA FROM ABOVE<br />

TOTAL SQUARE FOOTAGE<br />

TO BE PROCESSED<br />

MODERATE/FAIR<br />

CONCRETE CONDITION<br />

Ramp or elevation transition (per 1/4" at thickest point -<br />

$1500 minimum)<br />

10,000<br />

Demolition <strong>of</strong> epoxy based setting materials - Less than<br />

1/8"<br />

Demolition <strong>of</strong> Setting materials - 1/8" to 3/8" (Greater than<br />

3/8" requires evaluation and PCO)<br />

Demolition <strong>of</strong> epoxy based Setting materials - 1/8" to 3/8"<br />

(Greater than 3/8" requires evaluation and PCO)<br />

Grout Coat Surface Enhancement, Including Micro-Pin<br />

Holes, Pitting and other Shallow Surface Deficiencies<br />

Full Grind, Densify, Dye and Polish Portions <strong>of</strong> the Project<br />

not Currently Indicated on the Drawings<br />

Start initial grind <strong>with</strong> 25-metals<br />

Start initial grind <strong>with</strong> 16-metals<br />

Adhesive Removal<br />

Demolition <strong>of</strong> setting materials - Less than 1/8"<br />

Joint Filler Removal and Replacement<br />

DATE/TIME BID TO BID DATE EXPIRES BID 15-1234 OWN<br />

STORE # 123 # PM 08/03/15 11/01/15<br />

NAME/DIVISION TEL<br />

LOCATION FAX<br />

ADDRESS 1 1 MAIN ST DIRECT BID SET 05/25/15<br />

ADDRESS 2 EMAIL ADDENDUM 1 5/24/2015<br />

SPACE # A SALES OFFICE DELTA 2 4/17/2015<br />

CITY ANYTOWN ESTIMATOR CONST TYPE<br />

STATE CA DIRECT WAGE RATE<br />

PDCI LIC # EMAIL tkennady@the-rpm-group.com<br />

! !<br />

ITEM DESCRIPTION QTY UOM $ RATE Base/Option<br />

OPTIONS /<br />

ALTERNATES<br />

BASE BID Y / N<br />

1 ASSUMPTIONS:<br />

2 Assumes location is closed <strong>with</strong> work to being performed during normal h<strong>ours</strong>.<br />

3 Includes performing minor floor patching as identified in standard exclusions in red box at bo tom <strong>of</strong> this bid and yelow box a top<br />

4 <strong>of</strong> this bid. Slab must be accepted by Pacific Decorative prior to start <strong>of</strong> work; a l patching, filing, saw-cu ting, core driling, and<br />

5 other procedures that a fec the concrete must have been completed. GC to provide 110 po<strong>we</strong>r, adequate lighting, and dumpsters.<br />

6<br />

7<br />

8 POLISHED CONCRETE 10,000 SF 2.75 BASE 27,500<br />

9 Insta l natural Diamond Polish floor finish at areas indicated on the a tached takeo f.<br />

10 Diamond grind concrete <strong>floors</strong> using dry method <strong>with</strong> metal/resin bonded diamond abrasives at both field and edges;<br />

11 tooling is fi ted <strong>with</strong> hepa filter dust extractor/co lectors capturing 99.9 percent <strong>of</strong> airborne dust. Perform minor floor<br />

12 patching as identified in standard exclusions in red box at bottom <strong>of</strong> this bid and ye low box a top <strong>of</strong> this bid.<br />

13 Insta l Densifier (or approved equal) in accordance <strong>with</strong> manufacture specifications.<br />

14 Continue to refine using successively finer resin bonded diamond abraisives while removing scratches from previous grits.<br />

15 Polish concrete up to 1,500 grit <strong>with</strong> resin bonded diamond abrasives.<br />

16 Insta l Guard\Sealer (or approved equal) to floor in accordance <strong>with</strong> manufacture specifications.<br />

17 Burnish floor diamond twister pad to completion <strong>with</strong> high speed burnisher.<br />

18 Mock-up is to be perform upon a rival to start scope <strong>of</strong> work; otherwise, a separate mobilization fee wi l be charged.<br />

19<br />

20 OPEN STORE REMODEL 10,000 SF 1 BASE 10,000<br />

21 Open store remodel <strong>with</strong> work to be performed at night, minimum 8 hour shifts.<br />

22 Demob and remob equipment after each shift; figuring for six shifts.<br />

23 * A l dust containment is to be performed by others.<br />

24 * A l final cleaning is to be performed by others.<br />

25<br />

26 MOCK-UP 1 EA 1,500 OPTION 1,500<br />

27 PDC to perform an onsite mockup for approval by architect & end user as a separate mobilization prior to job start.<br />

28<br />

29 POWER 1 EA 1,500 OPTION 1,500<br />

30 480 V / 3 PHASE POWER<br />

31 PDC to provide 480V, 3 Phase po<strong>we</strong>r on site (Required for grinding equipment)<br />

32<br />

33 JOINT FILLER 1,200 LF 2.50 BASE 3,000<br />

34 PDCI to chase, clean out and insta l "Hi-Tech Polyurea" (or equal) polyurea joint fi ler in a l construction/control/<br />

35 expansion joints in areas to receive concrete polishing or sealer. Color: Clear.<br />

36<br />

37<br />

38<br />

39<br />

40<br />

41 Subcontractor is NOT responsible to achieve FF or FL results and a l e for to achieve specification is<br />

42 IMPORTANT NOTE:<br />

43 Face Flatness Number (FF): The maximum slab curvature a lo<strong>we</strong>d over 24 inches computer on the basis <strong>of</strong><br />

44 succcessive 12 inch di ferentials<br />

45 Face Levelness Number (FL): The relative conformity <strong>of</strong> the slab surface to a horizontal plane as measured<br />

46 over a 10 foot distance.<br />

47 Specification for this project; Reference Specification 03 30 00<br />

48 FF: 30 FL: 35<br />

49 Subcontractor is NOT responsible to achieve FF or FL results and a l e for to achieve specification is<br />

50 EXCLUDED from proposal!<br />

51<br />

52<br />

53 INCLUDED<br />

54 Certifications: RPM, ICPI, CPAA, Ardex, PROSOCO, Ultrafloor, Ameripolish, Retroplate, Certishine, FGS, Sherwin Wi liams,<br />

55 Ashford Formula, Sase, HTC, Versaflex, Consolodeck, L&M Sc<strong>of</strong>ield, Adsil<br />

56 Assumes a closed store remodel.<br />

57 Minor patching included - Break<strong>do</strong>wn available upon request<br />

58 1 (one) mobilization(s) included - Additional @ $2,500 per crew<br />

59 1 (one) 8'x8' Mock-up included - if insta led on day one <strong>of</strong> start <strong>of</strong> above scope <strong>of</strong> work - unless otherwise noted above<br />

60 10 Years experience <strong>with</strong> similar projects and scopes OPT / ALT BASE BID<br />

61 SUB TOTALS 3,000 40,500<br />

62 *SEE STANDARD EXCLUSIONS BELOW ! TOTAL AS BID<br />

! !<br />

Reg-Time Overtime Dbl-Time<br />

Field Supervisor 79.28 118.92 158.57<br />

Team Supervisor 72.46 108.69 144.93<br />

Field Technician 64.33 96.49 128.65<br />

BID 15-1234 OWN SHOES R US #123 - BIG MALL - ANYTOWN CA<br />

SHOES R US #123 - BIG MALL - ANYTOWN CA<br />

8/3/2015 16:49<br />

43,500<br />

$<br />

916-555-1234<br />

A.1 FLOOR PLAN<br />

SPECIFICATION 03 30 00<br />

PDCi sha l not be required to provide any additional labor, equipment or materials until such time as the General<br />

Contractor has signed and delivered a wri ten Change Order authorizing and approving such extra work, equipment<br />

and/or materials.<br />

Hourly Rates<br />

CA 818796<br />

916-555-9876<br />

!VERY IMPORTANT ! !!VERY IMPORTANT ! !!VERY IMPORTANT ! !VERY IMPORTANT ! !VERY IMPORTANT !VERY IMPORTANT ! !VERY IMPORTANT !<br />

STANDARD EXCLUSIONS: (These items are excluded UNLESS otherwise described in Scope <strong>of</strong> Work above) Water Pro<strong>of</strong>ing, Crack Isolation Membranes, Expansion joint Fi l/Sealants, Cleaning, Waxing,<br />

Protecting <strong>of</strong> su roundings and Vacuuming, Moisture, Bond and Alkalinity Testing, Moisture Remediation, Sca folding, Lifting Equipment, Heaters, Extensive Floor Preparation, Underlayment, Leveling and<br />

Priming, Grout Coats, Gloss & Slip Meter Testing, Post Installation Protection, Lighting, and Dumpsters.<br />

SLAB REMEDIATION: Clean, solid concrete substrate <strong>with</strong> no coatings, including residual coatings and curing sealers is assumed <strong>with</strong> only minor patching required; defined as 15 golf ba l size sprawls/holes<br />

per 1,000 square feet. Patching beyond minor patching, removal/replacement <strong>of</strong> existing path work, any additional work required is extra work beyond the base bid.<br />

CONTROL JOINTS: When Joint Fi ler is not excluded or priced seperately; PDC wi l fill ¼ inch or sma ler saw-cut control joints that are in good repair <strong>with</strong> squared o f shoulders. Repairing control joints prior to<br />

fi ling is extra work beyond the base bid.<br />

APPLICABLE DOCUMENTS<br />

BIG MALL<br />

PROPOSAL<br />

SHOES R US<br />

OWNER<br />

rev.033015.1<br />

RPM<br />

UNLESS OTHERWISE INDICATED - THIS PROPOSAL ASSUMES A CLEAN, FLAT CONCRETE SURFACE THAT IS FREE FROM ALL SETTING MATERIALS,<br />

ADHESIVES OR COATINGS OF ANY KIND, INCLUDING CURING COMPOUNDS AND WITH MINIMUM SURFACE DEFECTS SUCH AS SPALLS AND CRACKS. A<br />

"STANDARD PREP WORKSHEET" IS AVAILABLE UPON REQUEST.<br />

408-898-0256<br />

Tim Kennady OPEN REMODEL<br />

NON-UNION<br />

SUBCONTRACTOR WORK ORDER FOR SHOES R US #123 – BIG MALL – ANYTOWN, CA JULY 30, 2015 4<br />

Fee Schedule<br />

This project wi l be performed on a lump sum basis. The total value for the Services pursuant to this SWO shall<br />

not exceed:<br />

$37,845.00<br />

unless otherwise agreed to by both parties via the project change control procedure, as outlined <strong>with</strong>in. A PCR<br />

wi l be issued specifying the amended value.Payment wi l be made per the MSA (Sections 10, 11, 12)<br />

Invoice to:<br />

By Mail By eMail By Fax<br />

RPM | Finance<br />

5421 Stationers Way<br />

Sacramento, CA 95842<br />

tkennady@the-rpm-group.com 916-349-1211<br />

Exhibits<br />

1. Original Proposal<br />

2. Standard Prep Worksheet<br />

3. Shop Drawing / Take Off<br />

4. Specification 03 30 00<br />

5. Specification 03 35 00<br />

Assumptions<br />

1. 4 Day Insta lation<br />

2. Clean Sound Substrate<br />

Proposed Change Order Procedure<br />

Per the terms <strong>of</strong> the MSA (Section 5)<br />

IN WITNESS WHEREOF, the parties hereto have caused this SOW to be effective as <strong>of</strong> the day, month and year<br />

first written above.<br />

RPM Pacific Decorative Concrete<br />

By: By:<br />

Name: Timothy A Kennady Name:<br />

Title: President Title:<br />

SUBCONTRACTOR WORK ORDER FOR SHOES R US #123 – BIG MALL – ANYTOWN, CA JULY 30, 2015 3<br />

Stairs: NO Qty: - Elevator: unknown Size: -<br />

Lifting Equip Needed: unknown<br />

If so, What: -<br />

Park Dist. from Door: unknown<br />

Staging, load/unload area:<br />

unknown<br />

Secured Storage: YES<br />

Existing Floor: unknown Concrete Condition: unknown Concrete Hardness: unknown<br />

Po<strong>we</strong>r Available: unknown<br />

Break / Panel Type: -<br />

Can Breaker be provided? [ ]<br />

Dist. from Generator: unknown<br />

KTA-Tator, Inc. Relative Humidity<br />

Test Results, as <strong>of</strong> [Click to select<br />

date]: No tested as <strong>of</strong> 9/12/14! !<br />

Test 1 –%<br />

Test 2 –%<br />

Test 3 –%<br />

Test 4 –%<br />

Test 5 –%<br />

Test 6 –%<br />

Debris Disposal: NO - Remove from<br />

site<br />

Exclusions<br />

These items are excluded unless struck: Water Pro<strong>of</strong>ing, Crack Isolation Membranes, Expansion joint<br />

Fi l/Sealants, Cleaning, Waxing, Protecting <strong>of</strong> surroundings and Vacuuming, Moisture, Bond and Alkalinity<br />

Testing, Moisture Remediation, Scaffolding, Lifting Equipment, Heaters, Extensive Floor Preparation,<br />

Underlayment, Leveling and Priming, Grout Coats,<br />

Gloss & Slip Meter Testing, Post Insta lation Protection.<br />

SLAB REMEDIATION: Clean, solid concrete substrate <strong>with</strong> no coatings, including residual<br />

coatings and curing<br />

sealers is assumed <strong>with</strong> only minor patching required; defined by the Standard Prep Worksheet (SPW).<br />

Patching beyond minor patching, removal/replacement <strong>of</strong> existing patch work, any additional work required is<br />

extra work beyond the base bid.<br />

CONTROL JOINTS: Fi l saw-cut control joints that are in good repair <strong>with</strong> squared <strong>of</strong>f shoulders. Repairing<br />

control joints prior to fi ling may be extra work beyond the base bid – Refer to your SPW.<br />

Subcontractor Responsibilities<br />

1. Provide Po<strong>we</strong>r<br />

2. Provide Post Insta lation Protection (Ramboard)<br />

3. Pictures before, prior to densify (some <strong>of</strong> gloss mete readings) and at completion, to include pictures<br />

<strong>of</strong> gloss mete readings<br />

4. Completed SPW – regardless if there was any extra prep.<br />

Owner Responsibilities<br />

The Owners GC is required to provide clean substrate and clear lighted workspace. Any adhesive removal or<br />

other coatings or mortar bed removal is to be treated as a Change Order and MUST be approved PRIOR to start<br />

or RPM wi l NOT be compensated for extra work.<br />

SUBCONTRACTOR WORK ORDER FOR SHOES R US #123 – BIG MALL – ANYTOWN, CA JULY 30, 2015 2<br />

Engagement Resources<br />

RPM<br />

PM: Scott McGuire<br />

916-705-8578<br />

smcguire@the-rpm-group.com<br />

Owner: Foot Locker<br />

PM Contact: John Smith<br />

jsmith@ shoesrus.com<br />

916-555-5555<br />

GC: Smart Construction<br />

PM Contact: Jane Francisco<br />

209-327-9999<br />

Site Contact: David Freedman<br />

210-884-3000<br />

Scope <strong>of</strong> Work<br />

Subcontractor sha l provide the Services and Deliverable(s) as fo lows:<br />

1. Prep, Grind, Polish, Densify, Dye, Seal and Protect per Foot Locker Master Specification 03 30 00 a nd 03 35<br />

00;<br />

a) Subcontractor wi l prep the existing substrate as necessary to polish, densify, color and seal the floor<br />

to 1500 grit.<br />

b) Concrete (Staining/Scoring)– 2 Colors<br />

i) Concrete Grey<br />

ii) Midnight Black<br />

c) Additional Prep that exceeds the amount specified on<br />

the Worksheet requires verification <strong>of</strong> Owner or<br />

Owners representative (General Contractor) and a signed Worksheet must be submitted to RPM and<br />

approved by Clien to be paid.<br />

d) Insta l ramping at a l adjoining floor transitions and color and polish. (Ardex, TRU, Diamatic, TGA)<br />

e) Provide Po<strong>we</strong>r<br />

f) Post Insta lation Protection – RamBoard – NO substitutions. Tape a l seams – NO spo taping.<br />

Process sf Polish Level sf Detail Work Qty<br />

Demolition 0 200 0 Edgework (lf) 1,600<br />

Surface Prep 10,000 400 0 Dye (sf) 0<br />

Grind & Seal 0 800 0 Patching (sf) 0<br />

Overlay 0 1500 10,000 Joint Fi ler (lf) 1,200<br />

Thickness 0 Other Cracks (lf) 250<br />

Ramping 36 Other Deco Saw Cuts (lf) 0<br />

Other Other Post Protection (sf) 0<br />

Site Conditions<br />

Job Type: Retail (Ma l) Union Labor: NO Lighting: YES<br />

SUBCONTRACTOR WORK ORDER FOR SHOES R US #123 – BIG MALL – ANYTOWN, CA JULY 30, 2015 1<br />

Subcontractor Work Order 15-1234<br />

Issued To:<br />

Pacific Decorative Concrete<br />

5421 Stationers Way<br />

Sacramento, CA 95842<br />

Phone: 916-349-1200<br />

Fax: 916-349-1211<br />

5421 Stationers Way<br />

Sacramento, CA 95842<br />

916-349-1200<br />

916-349-1211<br />

SWO 1.0 15-1234 for Agreemen to Perform PolishingServices to Shoes R Us<br />

Project Name: SHOES R US #123 – BIG MALL – ANYTOWN, CA<br />

Date Services Performed By: Project:<br />

July 30, 2015 Pacific Decorative Concrete<br />

5421 Stationers Way<br />

Sacramento, CA 95842<br />

Phone: 916-349-1200<br />

Fax: 916-349-1211<br />

Shoes R Us<br />

#123<br />

Big Mall<br />

1 Main St<br />

Anytown, CA<br />

Suite #A<br />

CONGRATULATIONS! Your company is the beneficiary <strong>of</strong> a quality project through your RPM membership. Please<br />

review your Master Agreement and this SOW carefully as it contains a l <strong>of</strong> the information you need to satisfy<br />

our client and securing ou relationship <strong>with</strong> them. Yo<br />

u are a very important part <strong>of</strong> the RPM team! If you need<br />

any assistance, please contact us anytime or your most trusted RPM partner. – GOOD LUCK!<br />

This Subcontract Work Order(SWO) 15-1234 is issued pursuan to a Purchasing Agreement bet<strong>we</strong>en RPM and<br />

Shoes R Us and the Master Services Agreement(MSA) bet<strong>we</strong>en RPM and Pacific Decorative Concrete<br />

(“Subcontractor<strong>”</strong>). This SWO is subjec to the terms and conditions contained in the MSA bet<strong>we</strong>en the parties<br />

and are made a part there<strong>of</strong>. Any term not otherwise defined herein sha l have the meaning specified in the<br />

MSA. In the event <strong>of</strong> any conflict or inconsistency bet<strong>we</strong>en the terms <strong>of</strong> this SWO and the terms <strong>of</strong> the MSA,<br />

the terms <strong>of</strong> this SWO sha l govern and prevail<br />

.<br />

This SWO # 15-1234 effective as <strong>of</strong> July 30, 2015, is entered into by and bet<strong>we</strong>en Subcontractor and RPM, and is<br />

subject to the terms and conditions specified below. The Exhibit(s) to this SWO, if any, sha l be deemed to be a<br />

part here<strong>of</strong>. In the event <strong>of</strong> any inconsistencies bet<strong>we</strong>en the terms <strong>of</strong> the body <strong>of</strong> this SWO and the terms <strong>of</strong><br />

the Exhibit(s) hereto, the terms <strong>of</strong> the body <strong>of</strong> this SWO sha l prevail.<br />

Period <strong>of</strong> Performance<br />

1. The Services sha l commence on September 30, 2015, and sha l continue through October 10, 2015.*<br />

*Note: These dates are estimated insta lation dates. Verify <strong>with</strong> site superintendent! !<br />

2. 10 Day Installation.<br />

3. Night work unless otherwise specified by Shoes R Us GC.<br />

DATE/TIME OWNER/GC PROPOSAL WO 1.0 15-1234<br />

STORE # 123 # PHONE<br />

NAME/DIVISION PM<br />

LOCATION PHONE<br />

ADDRESS 1 SUPER BID SET 05/25/15<br />

ADDRESS 2 PHONE ADDENDUM 1<br />

SPACE # A SALES OFFICE DELTA 2<br />

CITY ANYTOWN ESTIMATOR CONST TYPE OPEN REMODEL<br />

STATE CA DIRECT WAGE RATE NON-UNION<br />

PDCI LIC # EMAIL tkennady@the-rpm-group.com<br />

! !<br />

QTY DESCRIPTION OF WORK COMPLETED<br />

1 Debris Disposal<br />

2 Provided On-Site<br />

3 1 Haul Away<br />

4 Temporary Po<strong>we</strong>r<br />

5 Provided On-Site<br />

6 1 Generator (480 V / 3 Phase)<br />

7 Misc<br />

8 Lighting<br />

9 Water<br />

10 Other (Explain)<br />

11<br />

12 10000 SF POLISHED CONCRETE<br />

13 Insta l natural Diamond Polish floor finish at areas indicated on the a tached takeo f.<br />

14 Diamond grind concrete <strong>floors</strong> using dry method <strong>with</strong> metal/resin bonded diamond abrasives at both field and edges;<br />

15 tooling is fi ted <strong>with</strong> hepa filter dust extractor/co lectors capturing 99.9 percent <strong>of</strong> airborne dust. Perform minor floor<br />

16 patching as identified in standard exclusions in red box at bo tom <strong>of</strong> this bid and ye low box a top <strong>of</strong> this bid.<br />

17 Insta l Densifier (or approved equal) in accordance <strong>with</strong> manufacture specifications.<br />

18 Continue to refine using successively fine resin bonded diamond abraisives while removing scratches from previous grits.<br />

19 Polish concrete up to 1,500 grit <strong>with</strong> resin bonded diamond abrasives.<br />

20 Insta l Guard\Sealer (or approved equal) to floor in accordance <strong>with</strong> manufacture specifications.<br />

21 Burnish floor diamond twister pad to completion <strong>with</strong> high speed burnisher.<br />

22 Mock-up is to be perform upon a rival to start scope <strong>of</strong> work; otherwise, a separate mobilization fee wi l be charged.<br />

23<br />

24 10000 SF OPEN STORE REMODEL<br />

25 Open store remodel <strong>with</strong> work to be performed at night, minimum 8 hour shifts.<br />

26 Demob and remob equipment after each shift; figuring for six shifts.<br />

27 * A l dust containment is to be performed by others.<br />

28 * A l final cleaning is to be performed by others.<br />

29<br />

30 1 EA MOCK-UP<br />

31 PDC to perform an onsite mockup for approval by architect & end user as a separate mobilization prior to job start.<br />

32<br />

33 1 EA POWER<br />

34 480 V / 3 PHASE POWER<br />

35 PDC to provide 480V, 3 Phase po<strong>we</strong>r on site (Required for grinding equipment)<br />

36<br />

37 1200 LF JOINT FILLER<br />

38 PDCI to chase, clean out and insta l "Hi-Tech Polyurea" (or equal) polyurea joint fi ler in a l construction/control/<br />

39 expansion joints in areas to receive concrete polishing or sealer. Color: Clear.<br />

40<br />

41<br />

42<br />

43<br />

44<br />

45<br />

46<br />

47<br />

48<br />

49<br />

50<br />

51<br />

52<br />

53<br />

54<br />

55<br />

56<br />

57<br />

58<br />

59<br />

60<br />

61<br />

62<br />

63<br />

64<br />

65<br />

66 YES T-Rex Required?<br />

67<br />

68<br />

69<br />

70<br />

71<br />

72 Owner/GC Representative Signature Date<br />

73<br />

74<br />

75<br />

Installer Notes Above This Line<br />

*Signature <strong>do</strong>es not represent an agreemen to payment by the signer. Signature only verifies tha the work has been completed satisfactorily by the qualified representative for<br />

the Owner and/or GC.<br />

rev.033015.1<br />

1 MAIN ST<br />

YOU ARE NOT APPROVED TO PERFORM WORK OUTSIDE OF THE SCOPE INDICATED IN THIS WORK<br />

ORDER WITHOUT PROPER AUTHORIZATION! - CONTACT YOUR ESTIMATOR/PM<br />

CA 818796<br />

A.1 FLOOR PLAN<br />

RPM<br />

Tim Kennady<br />

408-898-0256<br />

WO 15-1234 SHOES R US #123 - BIG MALL - ANYTOWN CA<br />

SHOES R US #123 - BIG MALL - ANYTOWN CA WORK ORDER<br />

8/3/2015 16:58 OWNER<br />

SPECIFICATION 03 30 00<br />

916-555-1234<br />

SHOES R US APPLICABLE DOCUMENTS<br />

BIG MALL<br />

“Detail & Time Oriented<br />

Administrative Team.<br />

That’s How...<strong>”</strong><br />

Comprehensive and informative<br />

post-installation reporting.<br />

Proposals are easy to read and clearly<br />

identify base price and options.<br />

Inclusions and exclusions are also<br />

clearly identified along <strong>with</strong> labor<br />

costs, project and contact information.<br />

Included <strong>with</strong> your proposal package<br />

is the proposal itself, a worksheet<br />

identifying what is standard preparation<br />

work, and itemized pricing for<br />

additional scopes that may be necessary<br />

after the start <strong>of</strong><br />

your installation. No<br />

surprises - predict<br />

-<br />

able pre-negotiated<br />

pricing.<br />

RPM<br />

RPM<br />

10 YEAR WARRANTY!<br />

!<br />

"#$%!&'%%'()*+<br />

!"#$%&#'&($)*)'+$&,#)-.$+//&("#0+((+-$#12(#+33/)'+$)1-#<br />

31/).%)-4#.5.$&6#$1#7&#*(&&#1*#,2.$)-4#'+2.&,#75#*11$#$(+**)'#)-#<br />

2-,&(#-1(6+/#2.&#+-,#.&(8)'&#1*#$%&#.5.$&6#*1(#+#3&()1,#1*#9#<br />

5&+(#*(16#$%&#)-.$+//+$)1-#,+$&:#;%&#6+-2*+'$2(&(#1*#$%&#<br />

'1-'(&$&#31/).%)-4#.5.$&6#%10&8&(#0)//#42+(+-$&&#$%+$#$%&#<br />

*/11(#0)//#(&6+)-#,&-.)*)&,#*1(#+#3&()1,#1*#9


You mean besides the fact that<br />

its so BEAUTIFUL!?<br />

Well - it’s also;<br />

cleaner<br />

stronger<br />

brighter<br />

easier<br />

quicker<br />

cheaper<br />

harder<br />

greener<br />

It’s just simply BETTER-ER!<br />

EFFLORESCENT DUSTING ELIMINATED<br />

Polished concrete floor eliminates dusting entirely, making<br />

for a much healthier work environment.<br />

RESISTANT TO STAINS<br />

Polished concrete floor system transforms a porous<br />

concrete floor into a tightened surface, dense enough to<br />

keep water, oil, and other contaminants from penetrating<br />

the surface.<br />

STRONGER MORE DURABLE SURFACE<br />

The polished concete process hardens what was once<br />

beneath that old deteriorated surface.<br />

INCREASED LIGHTING<br />

With a floor as reflective as a polished concrete floor, the<br />

increased lighting in your facility benefits everyone.<br />

SAFER & LESS SLIPPERY<br />

It may look like glass, but it has a higher friction co-efficient<br />

than ordinary concrete.<br />

NO MORE TIRE MARKS<br />

With a polished concrete floor system, ordinary cleaning<br />

removes tire marks immediately.<br />

REDUCTION IN TIRE WEAR<br />

Level joints and polished concrete make the entire surface<br />

smooth, allowing tires to last much longer.<br />

MUCH LOWER MAINTENANCE<br />

The surface is so tightly compacted that it actually repels<br />

oils and other substances, making cleaning much<br />

easier than <strong>with</strong> other <strong>floors</strong>.<br />

REDUCED DOWN-TIME DURING INSTALL<br />

Concrete polishing is a dry process and there is no delay in<br />

making the floor available for use immediately upon<br />

completion.<br />

COST-EFFECTIVE<br />

Polished concrete is not only less expensive to install than<br />

most floor covering materials, it is significantly less<br />

expensive to maintain - and never needs replacement.<br />

BEAUTY<br />

No other floor system can boast such beauty as a Polished<br />

Concrete floor system.<br />

NO WAXING OR STRIPPING<br />

Polished concrete floor system never needs it!<br />

LONGEST-LASTING SOLUTION POSSIBLE<br />

There is simply no comparison to other floor systems<br />

when it comes to how long a floor can last.<br />

GO GREEN | ECO FRIENDLY<br />

High in durability and low in environmental impact, concrete is the perfect flooring material for<br />

sustainable work places. As builders and business owners discover the benefits <strong>of</strong> green<br />

construction, <strong>with</strong>out sacrificing aesthetics or going over budget, there are more retail,<br />

industrial, commercial and public spaces starting to use polished concrete flooring. Going green<br />

isn’t just good for the planet…it saves money too.<br />

Concrete <strong>floors</strong>, left exposed, help conserve resources by functioning as a foundation slab —<br />

when they are given a stain or polish, concrete flooring also has a decorative and aesthetic<br />

look. In other words, polished concrete <strong>floors</strong> <strong>of</strong>fer the benefits <strong>of</strong> both form and function!<br />

DESIGN VERSATILITY<br />

Decorative techniques such as polishing, coloring, staining, and stenciling give you a wide<br />

variety <strong>of</strong> design choices, allowing you to create <strong>floors</strong> that look like more traditional materials,<br />

such as tile or slate, or a custom design that is completely unique. There are also more environmentally<br />

friendly options for products used to color, stain, and seal concrete.<br />

DURABILITY & RESOURCE CONSERVATION<br />

When properly installed and sealed, a decorative concrete floor should last a lifetime, and <strong>with</strong><br />

proper maintenance, it will never need to be replaced. Few flooring materials can achieve this.<br />

Concrete <strong>floors</strong> also utilize sustainable materials. The main raw material for the cement in<br />

concrete is limestone; the most abundant mineral on earth.<br />

ENERGY EFFICIENCY<br />

Because <strong>of</strong> their thermal mass and ability to retain heat, concrete <strong>floors</strong> are ideal for passive<br />

solar designs. When spaces are built to take advantage <strong>of</strong> solar radiation entering through<br />

win<strong>do</strong>ws in the winter months, concrete <strong>floors</strong> will absorb the heat from the direct sunlight<br />

and release the stored heat as needed. It also increases ambient lighting by as much as 30%!<br />

ECONOMICAL<br />

An exposed concrete floor is almost always an economical alternative to other solutions that<br />

require an additional covering, such as hardwood flooring and tile. For new commercial<br />

projects <strong>with</strong> site-cast concrete floor slabs, leaving the concrete <strong>floors</strong> exposed can save a lot <strong>of</strong><br />

money over the life <strong>of</strong> the building.


ALTERNATIVE SOLUTIONS?<br />

We ARE the alternative solution!<br />

Existing Floor Covering<br />

Coating, Adhesive or Mortar<br />

Cream Finish<br />

Salt & Pepper Finish<br />

Medium Aggregate<br />

Heavy Aggregate<br />

Large Aggregate<br />

“For my facilities - Polished & Sealed<br />

Concrete is the only way I go!<strong>”</strong><br />

Polished Concrete<br />

(“They won’t see my face - right?<strong>”</strong>)<br />

- Carpet Supplier<br />

Design Options<br />

Performance Longevity<br />

Maintenance Ease<br />

Store & Release Solar Energy<br />

Moisture Vulnerability<br />

Mold, Dust, Mildew Resistant<br />

Sustainable<br />

Square Foot Cost


Retail Polishing Management LLC (RPM) and its membership believe in the<br />

importance <strong>of</strong> specifications and the interface their function creates<br />

bet<strong>we</strong>en the supplier and the owner.<br />

The supplier identified in this commitment is one that has certified our<br />

company in the intended use and/or installation <strong>of</strong> their product and<br />

requires that certification to purchase and/or obtain a warranty for their<br />

product.<br />

We acknowledge that our supplier has put forth effort and expense for the<br />

purpose <strong>of</strong> receiving the benefits that come <strong>with</strong> having their product<br />

included in specifications and that our Supplier has a reasonable expectation<br />

that <strong>we</strong> will honor that specification.<br />

We understand that our Supplier will engage in competitive activities in the<br />

normal c<strong>ours</strong>e <strong>of</strong> their business to protect and/or cause or affect change in<br />

specifications and <strong>we</strong> agree not to interfere in those activities.<br />

WE ARE COMMITTED TO AND ARE HEREBY RESOLVED;<br />

That <strong>we</strong> will install the specified product <strong>of</strong> our Supplier in all cases<br />

and under all circumstances regardless <strong>of</strong> any financial incentives to <strong>do</strong><br />

otherwise.<br />

When one or more products are specified by more than one<br />

Supplier, it will be at our discretion which product is most appropriate for the<br />

project.<br />

If there is an alternative product listed in the specification to our<br />

Suppliers product that is an ‘<strong>of</strong>f shelf’ product, or if an ‘or equal’ is stated in<br />

any specification, <strong>we</strong> will only provide for the bid, installation and/or use <strong>of</strong><br />

our Suppliers product exclusively.<br />

Under no circumstance will <strong>we</strong> recommend, submit a proposal for,<br />

install and/or use an alternate product to the one exclusively listed in the<br />

specification <strong>of</strong> our Supplier and identified in our bid.<br />

Your Warranty!<br />

W<br />

E, the certificated installer, warrant our application <br />

polishing system to be free <strong>of</strong> dusting caused by foot traffic in <br />

under normal use and service <strong>of</strong> the system for a period <strong>of</strong> 1 <br />

year from the installation date. The manufacturer <strong>of</strong> the <br />

concrete polishing system ho<strong>we</strong>ver will guarantee that the <br />

floor will remain densified for a period <strong>of</strong> 10 years. This means <br />

that if the floor was put under a microscope that the densifier <br />

will still be present in the floor after a ten year period. A basic <br />

one step grind, densify and re-­‐polish is all that will be <br />

necessary to rejuvenate a polished floor after a ten year period <br />

if not maintained properly. There are many ways to prolong <br />

the longevity <strong>of</strong> your new polished concrete floor. This <br />

warranty <strong>do</strong>es not cover the longevity <strong>of</strong> the <strong>floors</strong> polished <br />

shine. It is up to you the customer to maintain this shine by <br />

using the proper cleaning materials as mentioned. If the floor <br />

fails to perform as indicated as per its advertised claims and <br />

benefits after a one year period, the installer will provide the <br />

necessary labor, materials and equipment to re-­‐apply a <br />

standard application <strong>of</strong> densified used in the concrete polishing <br />

system. <br />

This warranty <strong>do</strong>es not apply to defects resulting from <br />

faulty concrete, structural defects, abuse or any other <br />

unusual circumstance beyond the scope <strong>of</strong> the product <br />

limitations. The foregoing warranty to re-­‐apply a <br />

standard application <strong>of</strong> concrete polishing system is <br />

the only warranty, either expressed, implied or <br />

statutory, upon which the said application is sold. All <br />

other damages, liabilities or warranties, statutory or <br />

otherwise, are hereby waived. <br />

President, Retail Polishing<br />

Management LLC


Using a concrete sealer prevents water from penetrating the material,<br />

reducing the risk <strong>of</strong> cracks and other types <strong>of</strong> water damage. Stains are<br />

also greatly reduced. Preventing staining and moisture can discourage the<br />

growth <strong>of</strong> mold that might use the concrete as a substrate.<br />

Increase the concrete’s longevity<br />

Improves appearance<br />

It is cost effective<br />

Fast & efficient installation<br />

Reduces spalling, flaking and cracking<br />

Protection from oil spills and other stains<br />

Mold and mildew resistant


SEALED<br />

The durability and performance <strong>of</strong> polished concrete makes it a leading<br />

choice finish for retail stores, warehouses, <strong>of</strong>fice facilities, and municipalities.<br />

Even homeowners are making the choice towards <strong>these</strong> beautiful,<br />

high-luster <strong>floors</strong> that imitate the look <strong>of</strong> polished stone.<br />

Increase the concrete’s longevity<br />

Improves appearance and visual appeal<br />

Adds value to the property<br />

Least expensive to install in most cases<br />

Reduces spalling, flaking and cracking<br />

Protects from stains and spills<br />

Mold and mildew resistant


TAINED<br />

GOLD RAW SIENNA CARAMEL SAND<br />

TERRA COTTA MAHOGANY SADDLE BROWN CHOCOLATE BROWN<br />

WALNUT BURNT SIENNA CHESTNUT RED<br />

MAROON SEPIA EGGPLANT TURQUOISE<br />

SLATE BLUE PATRIOT BLUE GREEN PINE GREEN<br />

FOREST GREEN GRAY BLACK MIDNIGHT BLACK<br />

STAINED CONCRETE IS BEAUTFUL, ELEGANT<br />

AND A WARM FLOORING SOLUTION<br />

Acid stain is not a paint or coating agent, rather, it’s a coloring process<br />

involving a chemical reaction on a cementitious material. A solution made<br />

<strong>with</strong> water, acid, and inorganic salts react <strong>with</strong> minerals already present in<br />

the concrete, and the result <strong>of</strong> this reaction is color.<br />

Great durability<br />

Elegance & beauty<br />

Energy savings<br />

Light maintenance<br />

Optimal air quality<br />

Unsurpassed water resistance<br />

Sustainable


POXY<br />

OATINGS<br />

Providing outstanding resistance to corrosive chemicals, heat, and<br />

ultra violet light. Epoxy Coatings also exhibit excellent dimensional<br />

stability, extreme toughness, and abrasion resistance. They come in a<br />

variety <strong>of</strong> color and texture options.


Surface Preparation is an extremely important part <strong>of</strong> any decorative concrete<br />

solution. Whether it is removing existing coatings or impurities, leveling<br />

or pr<strong>of</strong>iling the substrate to apply other coatings; Surface Preparation<br />

<strong>do</strong>ne correctly ensures proper bonding to your substrate.<br />

Remove existing coatings<br />

Remove surface impurities<br />

Repair cracks and spalls<br />

Leveling and pr<strong>of</strong>iling<br />

Overlayments<br />

Repair surface blemishes<br />

Moisture remediation


026


Retail Polishing Management LLC<br />

Concrete Sealing, Staining, Polishing, Coating & Surface Prep Solutions for clients<br />

whose various real estate interests are diversely located geographically.<br />

Processing and Beautifying Concrete for National Accounts is what <strong>we</strong> <strong>do</strong>...<br />

5421 Stationers Way<br />

Sacramento, CA 95842<br />

888.RPM.1111<br />

www.the-rpm-group.com<br />

info@the-rpm-group.com<br />

Local | Regional | National | Global

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!