Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
What’s Inside...<br />
RPM<br />
Who We Are<br />
What We Do<br />
Why You Should Give Us a Try<br />
COVERAGE<br />
Where We Are | Where We Go<br />
How it Works<br />
WHY POLISH<br />
Advantages<br />
Go Green! – Everyone’s Doing It...<br />
Alternative Solutions<br />
The Process – How Do We Do It<br />
Respect The Spec!<br />
Not That You Need it – But Here is Our 10 Year Warranty!<br />
OUR SCOPES<br />
Sealed Concrete<br />
Polished Concrete<br />
Stained Concrete<br />
Epoxy Coatings<br />
Surface Preparation | Remediation<br />
IMAGE GALLERY<br />
Examples <strong>of</strong> Beautified Concrete<br />
003<br />
003<br />
003<br />
003<br />
005<br />
006<br />
007<br />
009<br />
009<br />
010<br />
011<br />
012<br />
013<br />
014<br />
015<br />
015<br />
017<br />
019<br />
021<br />
023<br />
025<br />
025<br />
<strong>“What</strong> <strong>do</strong> <strong>we</strong> <strong>do</strong> <strong>with</strong><br />
<strong>these</strong> <strong>floors</strong> <strong>of</strong> <strong>ours</strong>!?<strong>”</strong>
RPM is Retail Polishing Management LLC.<br />
For many years, our clients have been requesting a better solution for their<br />
regional, national, and even international concrete floor processing solutions.<br />
Current national, local, and regional providers have not been successful<br />
in meeting those expectations on service or value.<br />
In 2014, a group <strong>of</strong> very successful larger regional polishing companies came<br />
together, formed a new company and developed a new approach to address<br />
the demand. Since then, our network <strong>of</strong> DPC’s (Diamond Polishing Contractors)<br />
has increased significantly, providing a unique coverage reach and<br />
response unequal in our industry.<br />
We provide Concrete Sealing, Staining, Polishing, Coating and Surface Preparation<br />
& Remediation Services to clients whose various real estate interests<br />
are diversely located geographically.<br />
Local Response, Regional Coverage and National Support are what you can<br />
expect when you contract <strong>with</strong> RPM. With our network <strong>of</strong> DPC’s, <strong>of</strong> which<br />
most are actual owners <strong>of</strong> RPM, you get an owner level commitment not a<br />
regional manager response.<br />
When you are an RPM National Account Client, a single call is all it takes to get<br />
equipment and personnel to any <strong>of</strong> your locations throughout the Continental<br />
United States, Hawaii, Alaska, Puerto Rico, and ever expanding international<br />
locales.<br />
• Besides Beautiful Concrete?<br />
• Your project always comes first!<br />
• Predictable Results you can count on<br />
• Ease <strong>of</strong> Consolidated Administration<br />
• Customized Project Management Attention<br />
• Bulletpro<strong>of</strong> Preventive Maintenance Solutions<br />
• Ownership Level Commitment Everytime<br />
• Tertiary Coverage in Most Regions<br />
• Union Site Coverage<br />
• Unprecedented Responsiveness<br />
• Value Added Solutions to Save Your Budgets!<br />
• And Whatever We Can Imagine Together!<br />
“I cannot imagine a better group <strong>of</strong> leading industry pr<strong>of</strong>essionals<br />
to have as partners. It is genuinely an honor to have the opportunity<br />
<strong>of</strong> working together each and every day and I would like to share<br />
that same pleasure and experience <strong>with</strong> you and your company as<br />
<strong>we</strong>ll...<strong>”</strong><br />
- Tim Kennady<br />
President | JHKJHKJH
... and Growing!<br />
Minneapolis MN<br />
Allentown PA<br />
“19 Companies from 29 Locations<br />
operating out <strong>of</strong> 21 States supported<br />
by more than 300 heavy<br />
grinding platforms and a service<br />
capacity <strong>of</strong> almost 100 MSF annually?<br />
All working together this incredibly<br />
organized and effective!?<br />
Houston TX<br />
I mean... WOW!<strong>”</strong><br />
RPM has secondary even tertiary coverage in most regions <strong>of</strong> the Continental<br />
United States, and <strong>with</strong> <strong>we</strong>ll resourced locations in Hawaii, Alaska, and Puerto<br />
Rico - You can count on RPM to cover all <strong>of</strong> your real estate interests. We also<br />
have you covered at sites where union labor is a requirement.
40'-0"<br />
30'-0"<br />
7<br />
F<br />
E<br />
D<br />
C<br />
40'-0" 31'-0"<br />
40'-0"<br />
31'-0"<br />
16'-0" 30'-0" 40'-0" 30'-0" 16'-0"<br />
212'-0"<br />
132'-0"<br />
A2 FINISH PLAN<br />
SCALE: 1/8" = 1'-0"<br />
1. ALL WA LS TO BE PAINTED W/ VINYL BASE<br />
UNLESS NOTED OTHERWISE. S E ELEVATIONS AND FINISH SCHEDULE FOR<br />
MORE INFORMATION.<br />
E6 GENERAL NOTES<br />
5. REMOVE A L BURNISHES & SEALANTS FROM CONCRETE SLAB IF<br />
NECESSARY.<br />
A L CARPET TILES ON SALES FLOOR ARE SURFACE MOUNTED OVER FINISHED<br />
FLOOR. TO BE PROVIDED AND INSTALLED BY SAKS FIFTH AVE.<br />
ALL CARPET TILES TO BE 19.7" X 19.7"<br />
3.<br />
4.<br />
6. REFER TO FOR SLAB PATCHING DETAILS.<br />
E4<br />
A-802<br />
ALL EXPOSED ROOF DRAINS, PIPING/CONDUIT AND COLUMNS TO BE<br />
PAINTED (PT-1).<br />
2.<br />
E5 FINISH LEGEND<br />
POLISHED CONCRETE<br />
VINYL PLANK FLOORING<br />
SEALED CONCRETE<br />
VT<br />
1<br />
PC 1<br />
S<br />
1<br />
CARPET CPT<br />
1<br />
0 351 CONCRETE FLOOR FINISHES<br />
POLISHED CONCRETE PROCE S:<br />
A. SURFACE TREATMENTS FOR CONCRETE FLOORS AND SLABS.<br />
THE FO LOWING IS A STEP BY STEP PROCE S FOR THE TREATMENT OF THE POLISHED<br />
CONCRETE FLOOR SLABS.<br />
1. REMOVE EXISTING COATINGS IF A PLICABLE. EXISTING CONCRETE SLAB ON THIS<br />
PROJECT IS OLD. GC TO INSTA L ANY IN FLOOR ELECTRICAL ROUGH IN ITEMS PRIOR TO<br />
COMMENCEMENT WITH POLISHED CONCRETE TREATMENT . GC SHA L REVIEW CONDITIONS<br />
ONSITE. CLEAN AND REPAIR ANY DEFICIENT AREAS.<br />
2. SEAL CRACKS AND JOINTS IN THE EXISTING CONCRETE SLAB WITH AN EPOXY OR<br />
OTHER SEMI-RIGID FI LER. THE JOINTS SHA L BE CLEANED AND FI LED WITH<br />
METZGER/MCGUIRE RS-88 - COLOR STANDARD GREY ( OR APPROVED EQUAL PRODUCT ). TOP<br />
OF JOINT TO BE SCRAPED SMOOTH PRIOR TO THE START OF THE GRINDING / POLISHING<br />
PROCE S.<br />
E3 POLISHED CONCRETE INFORMATION<br />
NOTE TO THE G.C. :<br />
PREFE RED POLISHED CONCRETE<br />
VENDOR: QUESTMARK<br />
CONTACT: RON PRI T<br />
(717) 965-9340<br />
3. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 30- OR 40-GRIT<br />
METAL-BONDED DIAMOND.<br />
4. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH AN 80-GRIT METAL-BONDED<br />
DIAMOND.<br />
5. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 150-GRIT METAL-BONDED<br />
DIAMOND.<br />
6. VACUUM AND CLEAN ENTIRE SLAB AREA PRIOR TO THE A PLICATION OF THE CHEMICAL<br />
HARDENER.<br />
7. APPLY A CHEMICAL HARDENER TO DENSIFY THE CONCRETE. PRODUCT EQUAL TO<br />
AMERIPOLISH 3D HSL DENSIFIER.<br />
8. POLISH AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 100- OR 200-GRIT<br />
RESIN-BOND DIAMOND, OR A COMBINATION OF THE TWO.<br />
9. POLISH AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 400-GRIT RESIN-BOND<br />
DIAMOND.<br />
10. VACUUM AND CLEAN ENTIRE SLAB AREA PRIOR TO THE APPLICATION OF THE STAIN<br />
GUARD / SEALER.<br />
11. APPLY A STAIN GUARD TO HELP PROTECT THE POLISHED SURFACE AND MAKE IT EASIER<br />
TO MAINTAIN. PRODUCT EQUAL TO AMERIPOLISH STAIN PROTECTOR - TWO COATS WITH A<br />
BURNISHED POLISH FINISH TO GET THE DESIRED REFLECTIVE SH EN ON THE SURFACE.<br />
POLISHED CONCRETE<br />
PC 1<br />
PC 1 C6<br />
A-802<br />
VT<br />
1 FLOOR<br />
101<br />
SALES<br />
OF DOORS<br />
CPT<br />
2 SIZE: 3X9<br />
QTY: 27 TILES<br />
WALK OFF MAT<br />
C5<br />
A-802<br />
S<br />
1<br />
S<br />
1<br />
S<br />
1<br />
S<br />
1<br />
S<br />
1<br />
S<br />
1<br />
PC 1<br />
PC 1 CPT<br />
1<br />
CPT<br />
1<br />
FT<br />
1<br />
FT<br />
1 C5<br />
A-802<br />
C5<br />
A-802<br />
C5<br />
A-802<br />
A<br />
B<br />
C<br />
D<br />
E<br />
A<br />
B<br />
1 2 3 4 5 6<br />
1 2 3 4 5<br />
UNIFORM DRAWING SYSTEM - U.S. NATIONAL CAD STANDARD VERSION 3.1<br />
SHEET TITLE:<br />
SCALE:<br />
DRAWN BY:<br />
DATE:<br />
FILE:<br />
PROJECT:<br />
FILE LOCATION: p:\2015\15025\Sh ets\A103.dwg PLOT DATE: 6/5/2015 2:20 PM<br />
SHEET OF<br />
-<br />
FINISH PLAN<br />
A103<br />
40'-0"<br />
30'-0"<br />
7<br />
F<br />
E<br />
D<br />
C<br />
B<br />
A<br />
40'-0" 31'-0"<br />
40'-0"<br />
31'-0"<br />
16'-0" 30'-0" 40'-0" 30'-0" 16'-0"<br />
212'-0"<br />
132'-0"<br />
A1 FINISH PLAN<br />
SCALE: 1/8" = 1'-0"<br />
1. A L WALLS TO BE PAINTED W/ VINYL BASE<br />
UNLE S NOTED OTHERWISE. S E ELEVATIONS AND FINISH SCHEDULE FOR<br />
MORE INFORMATION.<br />
PT 1 VB1<br />
E6 GENERAL NOTES<br />
5. REMOVE A L BURNISHES & SEALANTS FROM CONCRETE SLAB IF<br />
NECESSARY.<br />
A L CARPET TILES ON SALES FLOOR ARE SURFACE MOUNTED OVER FINISHED<br />
FLOOR. TO BE PROVIDED AND INSTA LED BY SAKS FIFTH AVE.<br />
A L CARPET TILES TO BE 19.7" X 19.7"<br />
3.<br />
4.<br />
6. REFER TO FOR SLAB PATCHING DETAILS.<br />
E4<br />
A-802<br />
A L EXPOSED ROOF DRAINS, PIPING/CONDUIT AND COLUMNS TO BE<br />
PAINTED (PT-1).<br />
2.<br />
E5 FINISH LEGEND<br />
POLISHED CONCRETE<br />
VINYL PLANK FLOORING<br />
SEALED CONCRETE<br />
VT<br />
1<br />
PC 1<br />
S<br />
1<br />
CARPET CPT<br />
1<br />
03351 CONCRETE FLOOR FINISHES<br />
POLISHED CONCRETE PROCESS:<br />
A. SURFACE TREATMENTS FOR CONCRETE FLOORS AND SLABS.<br />
THE FO LOWING IS A STEP BY STEP PROCE S FOR THE TREATMENT OF THE POLISHED<br />
CONCRETE FLOOR SLABS.<br />
1. REMOVE EXISTING COATINGS IF A PLICABLE. EXISTING CONCRETE SLAB ON THIS<br />
PROJECT IS OLD. GC TO INSTA L ANY IN FLOOR ELECTRICAL ROUGH IN ITEMS PRIOR TO<br />
COMMENCEMENT WITH POLISHED CONCRETE TREATMENT . GC SHA L REVIEW CONDITIONS<br />
ONSITE. CLEAN AND REPAIR ANY DEFICIENT AREAS.<br />
2. SEAL CRACKS AND JOINTS IN THE EXISTING CONCRETE SLAB WITH AN EPOXY OR<br />
OTHER SEMI-RIGID FILLER. THE JOINTS SHA L BE CLEANED AND FI LED WITH<br />
METZGER/MCGUIRE RS-88 - COLOR STANDARD GREY ( OR APPROVED EQUAL PRODUCT ). TOP<br />
OF JOINT TO BE SCRAPED SMOOTH PRIOR TO THE START OF THE GRINDING / POLISHING<br />
PROCE S.<br />
E3 POLISHED CONCRETE INFORMATION<br />
NOTE TO THE G.C. :<br />
PREFERRED POLISHED CONCRETE<br />
VENDOR: QUESTMARK<br />
CONTACT: RON PRI T<br />
(717) 965-9340<br />
3. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 30- OR 40-GRIT<br />
METAL-BONDED DIAMOND.<br />
4. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH AN 80-GRIT METAL-BONDED<br />
DIAMOND.<br />
5. GRIND AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 150-GRIT METAL-BONDED<br />
DIAMOND.<br />
6. VACUUM AND CLEAN ENTIRE SLAB AREA PRIOR TO THE A PLICATION OF THE CHEMICAL<br />
HARDENER.<br />
7. A PLY A CHEMICAL HARDENER TO DENSIFY THE CONCRETE. PRODUCT EQUAL TO<br />
AMERIPOLISH 3D HSL DENSIFIER.<br />
8. POLISH AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 1 0- OR 200-GRIT<br />
RESIN-BOND DIAMOND, OR A COMBINATION OF THE TWO.<br />
9. POLISH AREA TO RECEIVE POLISHED CONCRETE FINISH WITH A 4 0-GRIT RESIN-BOND<br />
DIAMOND.<br />
10. VACUUM AND CLEAN ENTIRE SLAB AREA PRIOR TO THE APPLICATION OF THE STAIN<br />
GUARD / SEALER.<br />
1. A PLY A STAIN GUARD TO HELP PROTECT THE POLISHED SURFACE AND MAKE IT EASIER<br />
TO MAINTAIN. PRODUCT EQUAL TO AMERIPOLISH STAIN PROTECTOR - TWO COATS WITH A<br />
BURNISHED POLISH FINISH TO GET THE DESIRED REFLECTIVE SH EN ON THE SURFACE.<br />
POLISHED CONCRETE<br />
PC 1<br />
PC 1 C6<br />
A-802<br />
VT<br />
1 FLOOR<br />
101<br />
SALES<br />
OF DOORS<br />
CPT<br />
2 SIZE: 3X9<br />
QTY: 27 TILES<br />
WALK O F MAT<br />
C5<br />
A-802<br />
S<br />
1<br />
S<br />
1<br />
S<br />
1<br />
S<br />
1<br />
S<br />
1<br />
S<br />
1<br />
PC 1<br />
PC 1 CPT<br />
1<br />
CPT<br />
1<br />
FT<br />
1<br />
FT<br />
1 C5<br />
A-802<br />
C5<br />
A-802<br />
C5<br />
A-802<br />
A<br />
B<br />
C<br />
D<br />
E<br />
A<br />
B<br />
C<br />
D<br />
E<br />
1 2 3 4 5 6<br />
1 2 3 4 5 6<br />
UNIFORM DRAWING SYSTEM - U.S. NATIONAL CAD STANDARD VERSION 3.1<br />
SHEET TITLE:<br />
SCALE:<br />
DRAWN BY:<br />
DATE:<br />
FILE:<br />
PROJECT:<br />
REVISIONS:<br />
AS NOTED<br />
TENANT IMPROVEMENT<br />
4 MAY 2015<br />
I SUED FOR PLAN CHECK & L A PROVAL<br />
FILE LOCATION: p:\2015\15025\Sh ets\A103.dwg PLOT DATE: 6/5/2015 2:20 PM<br />
A103.DWG<br />
SHEET OF -<br />
-<br />
FINISH PLAN<br />
A102<br />
SHOE’S R US<br />
NOTE TO THE G.C.<br />
PREFERRED POLISHED CONCRETE<br />
VENDOR: RPM - RETAIL POLISHING MANAGEMENT<br />
CONTACT: TIM KENNADY<br />
916-349-1200<br />
SHOES R US | MASTER SPECIFICATION 03 35 40<br />
V02.12.14 03 35 00 - 1<br />
INTERIOR CONCRETE SLAB REPAIRS<br />
AND JOINT FILLER REPLACEMENT<br />
RPM<br />
PART 1 – GENERAL<br />
1.01 SUMMARY:<br />
The purpose <strong>of</strong> this specification is to establish standards <strong>of</strong> work and<br />
pre-determine expected quantity<br />
and costs <strong>of</strong> prep and repair prior to start <strong>of</strong> work.<br />
A. SECTION INCLUDES:<br />
1. Joint fi le removal and replacement, <strong>with</strong> or <strong>with</strong>out metal keyway (slight chipping and spa ling):<br />
a. Contractor is to provide unit price per linear foot for joint fi le removal and replacement<br />
based on the following formula:<br />
1. Total area to be polished X 0.14 = Total projected linear feet <strong>of</strong> joint filler removal and<br />
replacemen to be included and broken out in the bid.<br />
2. Spa led joint repair or joint <strong>with</strong> metalkeyway (less than 3/4<strong>”</strong> spa ling):<br />
a. Contractor is to provide unit price per linear foot for keyway segment removal and fi ler<br />
insta lation based on the fo lowing formula:<br />
1. Total area to be polished X 0.03 = Total projected linear feet <strong>of</strong> keyway segment<br />
removal to be included and broken out in the bid.<br />
3. Spa led joint repair, joint <strong>with</strong> metal keyway or self<br />
-leveling compound removal (grea than 3/4<strong>”</strong><br />
spa ling):<br />
a. Contractor is to provide unit price per linear fot for keyway segment removal and repair<br />
material. Insta lation based on the fo lowing formula:<br />
1. Total area to be polished X 0.03 = Total projected square feet <strong>of</strong> keyway segment and<br />
self-leveling compound removal and repair material. Insta lation to be in<br />
cluded and<br />
broken out in the bid.<br />
4. Crack repair:<br />
a. Contractor is to provide unit price per linear foot for crack cleaning and fi ling based on the<br />
fo lowing formula:<br />
SHOES R US | MASTER SPECIFICATION 03 35 00<br />
v02.12.15 03 35 00 - 1<br />
POLISHED CONCRETE FLOOR FINISH<br />
RPM<br />
PART 1 - GENERAL<br />
1.01 SUMMARY:<br />
A. Insta lation <strong>of</strong> polished concrete floor system for new and/or existing interior concrete <strong>floors</strong> by dry<br />
grinding only, application <strong>of</strong> penetrating concrete hardener/densifier, and polishing <strong>with</strong> various<br />
size grit metal-bonded, hybrid and resin-bonded diamonds to the scheduled specified minimum<br />
local and overa l gloss values.<br />
B. Removal <strong>of</strong> existing epoxy, ceramic, carpet,and/or vinyl composite tile floor finish, and a l existing<br />
underlayment, joint and crack repair products where shown on drawings<br />
C. Application <strong>of</strong> chemical dye and complementary edge band treatment.<br />
D. References:<br />
1. ASTM C 1028 – Standard Test Method for Determining the Static Coefficient <strong>of</strong> Friction <strong>of</strong><br />
Ceramic Tile and Other Like Surfaces by the Horizontal Dynamometer Pu l<br />
-Meter Method.<br />
2. ASTM D 523 – Standard Test Method for Specular Gloss.<br />
3. NFSI - National Floor SafetyInstitute; Test Method 101A; current edition.<br />
1.02 SUMMARY<br />
A. Comply <strong>with</strong> Section 01 XX XX Submittal Procedures<br />
B. PRODUCT DATA:<br />
1. Provide manufacturer's equipment product data sheets for:<br />
a. Planetary grinder polishing equipment<br />
b. Planetary grinder HEPA dust co lection equipment<br />
c. Hand tools<br />
d. Hand tool dust co lection equipment<br />
e. Diamond tooling<br />
f. High speed propane burnisher <strong>with</strong> dust skirt<br />
SPECIFICATIONS<br />
“A<strong>we</strong>some Estimators and Sales Pro’s!<br />
That’s How...<strong>”</strong><br />
In the event that your<br />
company <strong>do</strong>es not<br />
have a comprehensive<br />
specification - RPM has<br />
two options for you;<br />
1. We will customize our time tested<br />
and proven specification template and<br />
make it specific for your company –<br />
Complimentary!<br />
2. Put you into direct contact <strong>with</strong> several<br />
<strong>of</strong> the leading manufacturers in<br />
our industry so you can choose which<br />
is the best solution for your company.<br />
DATE/TIME OWNER/GC TM 1.0 15-1234<br />
STORE # 123 # PHONE Scope <strong>of</strong> Work Description<br />
NAME/DIVISION PM REMOVE FLOOR COVERING ADHESIVE<br />
LOCATION PHONE<br />
ADDRESS 1 SUPER<br />
ADDRESS 2 PHONE<br />
SPACE # A SALES OFFICE<br />
CITY ANYTOWN ESTIMATOR<br />
STATE CA DIRECT<br />
PDCI LIC # EMAIL tkennady@the-rpm-group.com<br />
! !<br />
EQUIPMENT QTY UOM UNIT COST EQUIPMENT MATERIALS LABOR<br />
1 Truck 1.00 Day 100.00<br />
$ 100<br />
$<br />
2 Fuel Surcharge 150.00 Miles 0.58<br />
$ 87<br />
3 Trailer 2.00 Day 100.00<br />
$ 200<br />
4 Generator 2.00 Day 500.00<br />
$ 1,000<br />
5 Fuel Surcharge 2.00 Day 250.00<br />
$ 500<br />
6 Heavy Planetary Grinder Platform 10.00 H<strong>ours</strong> 30.00<br />
$ 300<br />
7 Dust Extraction Equipment 10.00 H<strong>ours</strong> 25.00<br />
$ 250<br />
8 Light Grinder Platform H<strong>ours</strong> 20.00<br />
$ -<br />
9 Vacuum H<strong>ours</strong> 15.00<br />
$ -<br />
10 Hand Grinder for Edge Gridning 5.00 H<strong>ours</strong> 10.00<br />
$ 50<br />
11 Dust Collection Equipment 5.00 H<strong>ours</strong> 5.00<br />
$ 25<br />
12 Post use Inspection, Decontamination & Re-Certification 0.25 Ea. 250.00<br />
$ 63<br />
13 -<br />
14 -<br />
15 -<br />
16 MATERIALS<br />
17 T-REX PCD Scraping Blades 0.25 Set 1,000.00<br />
$ 250<br />
$<br />
18 Metal Bonded Diamond Pads (40,80,100: 10,000 sf) Set 450.00<br />
$ -<br />
19 Transitional Diamond Pads (100,150: 10,000 sf) Set 300.00<br />
$ -<br />
20 Resin Bonded Diamond Pads (100,400,800,1500: 2,500 sf) Set 100.00<br />
$ -<br />
21 Hand Grinding Tooling Ea. 100.00<br />
$ -<br />
22 Sealer Ga lon 10.00<br />
$ -<br />
23 Densifier - Lithium Ga lon 10.00<br />
$ -<br />
24 Densifier - Potasium Ga lon 12.00<br />
$ -<br />
25 Guard Gallon 10.00<br />
$ -<br />
26 Acetone Stain Gallon 15.00<br />
$ -<br />
27 Epoxy SF 6.00<br />
$ -<br />
28 Polyurea Joint Fi ler LF 3.00<br />
$ -<br />
29 Grout Coat SF 1.25<br />
$ -<br />
30 Mender Coat SF 1.25<br />
$ -<br />
31 Burnishing Pad Ea. 180.00<br />
$ -<br />
32 Edging Pads Ea. 180.00<br />
$ -<br />
33 Cleaner/Conditioner Ga lon 8.00<br />
$ -<br />
34 Dye SF 0.10<br />
$ -<br />
35 -<br />
36 -<br />
37 -<br />
38 -<br />
39 -<br />
40 LABOR<br />
41 Field Supervisor<br />
42 Regular Time 10.00 H<strong>ours</strong> 51.15<br />
$ 512<br />
$<br />
43 Overtime H<strong>ours</strong> 76.73<br />
$ -<br />
44 Double Time H<strong>ours</strong> 102.30<br />
$ -<br />
45 Weekend H<strong>ours</strong> 76.73<br />
$ -<br />
46 Holiday H<strong>ours</strong> 102.30<br />
$ -<br />
47 Team Supervisor<br />
48 Regular Time 10.00 H<strong>ours</strong> 46.75<br />
$ 468<br />
49 Overtime H<strong>ours</strong> 70.13<br />
$ -<br />
50 Double Time H<strong>ours</strong> 93.50<br />
$ -<br />
51 Weekend H<strong>ours</strong> 70.13<br />
$ -<br />
52 Holiday H<strong>ours</strong> 93.50<br />
$ -<br />
53 Field Technician<br />
54 Regular Time 10.00 H<strong>ours</strong> 41.50<br />
$ 415<br />
55 Overtime H<strong>ours</strong> 62.25<br />
$ -<br />
56 Double Time H<strong>ours</strong> 83.00<br />
$ -<br />
57 Weekend H<strong>ours</strong> 62.25<br />
$ -<br />
58 Holiday H<strong>ours</strong> 83.00<br />
$ -<br />
59<br />
60 Subcontractor H<strong>ours</strong> -<br />
61 Lodging Workers x Nights 2.00 Ea. 145.00<br />
$ 290<br />
62 Meals Workers x Days 2.00 Ea. 25.00<br />
$ 50<br />
63 -<br />
64 -<br />
65 -<br />
66 TOTAL COSTS 2,575<br />
$ 250<br />
$ 1,734<br />
$<br />
67 TAX 8.75% 22<br />
68 OVERHEAD 10% 257 25 173<br />
69 PROFIT 15% 385 37 259<br />
70 EQUIPMENT MATERIALS LABOR<br />
71 3,217<br />
$ 334<br />
$ 2,167<br />
$<br />
75 Owner/GC Representative Signature Date TOTAL<br />
rev.033015.1<br />
TM 15-1234 SHOES R US #123 - BIG MALL - ANYTOWN CA<br />
SHOES R US #123 - BIG MALL - ANYTOWN CA TIME and MATERIALS<br />
8/3/2015 16:56 OWNER<br />
916-555-1234<br />
SHOES R US<br />
RPM<br />
Tim Kennady<br />
408-898-0256<br />
CA 818796<br />
BIG MALL<br />
1 MAIN ST<br />
5,718<br />
$<br />
-<br />
$<br />
This <strong>do</strong>cument constitutes a proposal for an arrangement under which PDCI is to be paid on the basis <strong>of</strong> (1) actual cost <strong>of</strong> direct labor at specified hourly rates, (2) actual<br />
cost <strong>of</strong> materials and equipment usage, and (3) PDCI's overhead, pr<strong>of</strong>it and applicable tax.<br />
NOT TO EXCEED AMOUNT: COSTS<br />
DATE/TIME OWNER/GC WKSHT 1.0 15-1234<br />
STORE # 123 # PHONE<br />
NAME/DIVISION<br />
PM<br />
LOCATION<br />
PHONE<br />
ADDRESS 1<br />
SUPER<br />
ADDRESS 2<br />
PHONE<br />
SPACE # A SALES OFFICE<br />
CITY ANYTOWN ESTIMATOR<br />
STATE CA DIRECT<br />
PDCI LIC # EMAIL tkennady@the-rpm-group.com 1<br />
! !<br />
MULTIPLIER<br />
TOTAL FROM<br />
MULTIPLIER<br />
UNIT RATE<br />
INCLUDED IN<br />
BID<br />
TOTAL COST<br />
INCLUDED IN BID<br />
1 10,000 sf x 0.00 = 0 lf @ 3.00<br />
$ lf -<br />
$<br />
2 10,000 sf x 0.03 = 300 lf @ 1.50<br />
$ lf 450<br />
$<br />
3 10,000 sf x 0.03 = 300 lf @ 2.00<br />
$ lf 600<br />
$<br />
4 10,000 sf x 0.025 = 250 lf @ 6.00<br />
$ lf 1,500<br />
$<br />
5a 10,000 sf x 0.015 = 150 units @ 2.65<br />
$ ea 398<br />
$<br />
5b 10,000 sf x 0.01 = 100 units @ 4.00<br />
$ ea 400<br />
$<br />
6 10,000 sf x 0.0003 = 3 units @ 50.00<br />
$ ea 150<br />
$<br />
7 10,000 sf x 0.00 = 0 sf @ 10.00<br />
$ sf -<br />
$<br />
8 10,000 sf x 0.00 = 0 sf @ 1.25<br />
$ sf -<br />
$<br />
9 10,000 sf x 0.00 = 0 sf @ 4.50<br />
$ sf -<br />
$<br />
10 10,000 sf x 0.00 = 0 sf @ 0.60<br />
$ sf -<br />
$<br />
11 10,000 sf x 0.00 = 0 sf @ 1.20<br />
$ sf -<br />
$<br />
12 10,000 sf x 0.00 = 0 sf @ 0.75<br />
$ sf -<br />
$<br />
13a 10,000 sf x 0.00 = 0 sf @ 1.25<br />
$ sf -<br />
$<br />
13b 10,000 sf x 0.00 = 0 sf @ 2.25<br />
$ sf -<br />
$<br />
14a 10,000 sf x 0.00 = 0 sf @ 2.00<br />
$ sf -<br />
$<br />
14b 10,000 sf x 0.00 = 0 sf @ 4.00<br />
$ sf -<br />
$<br />
15 10,000 sf x 0.00 = 0 lf @ 10.00<br />
$ lf -<br />
$<br />
16a 10,000 sf x 0.00 = 0 ea @ 1,500<br />
$ ea -<br />
$<br />
16b 10,000 sf x 0.00 = 0 ea @ 2,500<br />
$ ea -<br />
$<br />
17 10,000 sf x 0.00 = 0 ea @ -<br />
$ ea -<br />
$<br />
3,498<br />
$<br />
This form is to be used to illustrate standard calculations for Slab Enhancement, Repair and Joint Filler Replacement. Use <strong>these</strong> numbers to calculate expense<br />
for <strong>these</strong> scopes <strong>of</strong> work in the accompanying Base Bid price. No deductions allo<strong>we</strong>d. Prices include from 0 (zero) - UP TO stated quantities.<br />
WKSHT 15-1234 SHOES R US #123 - BIG MALL - ANYTOWN CA<br />
SHOES R US #123 - BIG MALL - ANYTOWN CA<br />
WORKSHEET<br />
8/3/2015 16:49 OWNER<br />
916-555-1234<br />
SHOES R US<br />
Tim Kennady<br />
408-898-0256<br />
CA 818796<br />
BIG MALL<br />
1 MAIN ST<br />
RPM<br />
Surface Defect Repair, Including Pop-Outs, Spalls and<br />
Gouges 3/4"- 1-1/2" Dia.<br />
Surface Defect Repair, Including Pop-Outs, Spalls and<br />
Gouges 1-1/2" - 6" Dia.<br />
Surface Embed Repair, Including Clean-Outs, In Floor<br />
Electrical Outlets, and Walker Duct Access Holes<br />
Large Surface Repair. Install 3/8" Polished Overlay using<br />
Epoxy Primer<br />
TOTAL<br />
Mobilization/Mock-up (Grind/Polish) - per crew (1-3<br />
persons), truck & tools<br />
Mobilization (non-grind) - per crew (1-3 persons), truck &<br />
tools<br />
Spalled Joint Repair or Joint <strong>with</strong> Metal Keyway - Less<br />
than 3/4"<br />
Spalled Joint Repair, Joint <strong>with</strong> Metal Keyway or Self-<br />
Leveling Compound Removal - Greater than 3/4"<br />
Crack Repair<br />
ITEM<br />
AREA FROM ABOVE<br />
TOTAL SQUARE FOOTAGE<br />
TO BE PROCESSED<br />
MODERATE/FAIR<br />
CONCRETE CONDITION<br />
Ramp or elevation transition (per 1/4" at thickest point -<br />
$1500 minimum)<br />
10,000<br />
Demolition <strong>of</strong> epoxy based setting materials - Less than<br />
1/8"<br />
Demolition <strong>of</strong> Setting materials - 1/8" to 3/8" (Greater than<br />
3/8" requires evaluation and PCO)<br />
Demolition <strong>of</strong> epoxy based Setting materials - 1/8" to 3/8"<br />
(Greater than 3/8" requires evaluation and PCO)<br />
Grout Coat Surface Enhancement, Including Micro-Pin<br />
Holes, Pitting and other Shallow Surface Deficiencies<br />
Full Grind, Densify, Dye and Polish Portions <strong>of</strong> the Project<br />
not Currently Indicated on the Drawings<br />
Start initial grind <strong>with</strong> 25-metals<br />
Start initial grind <strong>with</strong> 16-metals<br />
Adhesive Removal<br />
Demolition <strong>of</strong> setting materials - Less than 1/8"<br />
Joint Filler Removal and Replacement<br />
DATE/TIME BID TO BID DATE EXPIRES BID 15-1234 OWN<br />
STORE # 123 # PM 08/03/15 11/01/15<br />
NAME/DIVISION TEL<br />
LOCATION FAX<br />
ADDRESS 1 1 MAIN ST DIRECT BID SET 05/25/15<br />
ADDRESS 2 EMAIL ADDENDUM 1 5/24/2015<br />
SPACE # A SALES OFFICE DELTA 2 4/17/2015<br />
CITY ANYTOWN ESTIMATOR CONST TYPE<br />
STATE CA DIRECT WAGE RATE<br />
PDCI LIC # EMAIL tkennady@the-rpm-group.com<br />
! !<br />
ITEM DESCRIPTION QTY UOM $ RATE Base/Option<br />
OPTIONS /<br />
ALTERNATES<br />
BASE BID Y / N<br />
1 ASSUMPTIONS:<br />
2 Assumes location is closed <strong>with</strong> work to being performed during normal h<strong>ours</strong>.<br />
3 Includes performing minor floor patching as identified in standard exclusions in red box at bo tom <strong>of</strong> this bid and yelow box a top<br />
4 <strong>of</strong> this bid. Slab must be accepted by Pacific Decorative prior to start <strong>of</strong> work; a l patching, filing, saw-cu ting, core driling, and<br />
5 other procedures that a fec the concrete must have been completed. GC to provide 110 po<strong>we</strong>r, adequate lighting, and dumpsters.<br />
6<br />
7<br />
8 POLISHED CONCRETE 10,000 SF 2.75 BASE 27,500<br />
9 Insta l natural Diamond Polish floor finish at areas indicated on the a tached takeo f.<br />
10 Diamond grind concrete <strong>floors</strong> using dry method <strong>with</strong> metal/resin bonded diamond abrasives at both field and edges;<br />
11 tooling is fi ted <strong>with</strong> hepa filter dust extractor/co lectors capturing 99.9 percent <strong>of</strong> airborne dust. Perform minor floor<br />
12 patching as identified in standard exclusions in red box at bottom <strong>of</strong> this bid and ye low box a top <strong>of</strong> this bid.<br />
13 Insta l Densifier (or approved equal) in accordance <strong>with</strong> manufacture specifications.<br />
14 Continue to refine using successively finer resin bonded diamond abraisives while removing scratches from previous grits.<br />
15 Polish concrete up to 1,500 grit <strong>with</strong> resin bonded diamond abrasives.<br />
16 Insta l Guard\Sealer (or approved equal) to floor in accordance <strong>with</strong> manufacture specifications.<br />
17 Burnish floor diamond twister pad to completion <strong>with</strong> high speed burnisher.<br />
18 Mock-up is to be perform upon a rival to start scope <strong>of</strong> work; otherwise, a separate mobilization fee wi l be charged.<br />
19<br />
20 OPEN STORE REMODEL 10,000 SF 1 BASE 10,000<br />
21 Open store remodel <strong>with</strong> work to be performed at night, minimum 8 hour shifts.<br />
22 Demob and remob equipment after each shift; figuring for six shifts.<br />
23 * A l dust containment is to be performed by others.<br />
24 * A l final cleaning is to be performed by others.<br />
25<br />
26 MOCK-UP 1 EA 1,500 OPTION 1,500<br />
27 PDC to perform an onsite mockup for approval by architect & end user as a separate mobilization prior to job start.<br />
28<br />
29 POWER 1 EA 1,500 OPTION 1,500<br />
30 480 V / 3 PHASE POWER<br />
31 PDC to provide 480V, 3 Phase po<strong>we</strong>r on site (Required for grinding equipment)<br />
32<br />
33 JOINT FILLER 1,200 LF 2.50 BASE 3,000<br />
34 PDCI to chase, clean out and insta l "Hi-Tech Polyurea" (or equal) polyurea joint fi ler in a l construction/control/<br />
35 expansion joints in areas to receive concrete polishing or sealer. Color: Clear.<br />
36<br />
37<br />
38<br />
39<br />
40<br />
41 Subcontractor is NOT responsible to achieve FF or FL results and a l e for to achieve specification is<br />
42 IMPORTANT NOTE:<br />
43 Face Flatness Number (FF): The maximum slab curvature a lo<strong>we</strong>d over 24 inches computer on the basis <strong>of</strong><br />
44 succcessive 12 inch di ferentials<br />
45 Face Levelness Number (FL): The relative conformity <strong>of</strong> the slab surface to a horizontal plane as measured<br />
46 over a 10 foot distance.<br />
47 Specification for this project; Reference Specification 03 30 00<br />
48 FF: 30 FL: 35<br />
49 Subcontractor is NOT responsible to achieve FF or FL results and a l e for to achieve specification is<br />
50 EXCLUDED from proposal!<br />
51<br />
52<br />
53 INCLUDED<br />
54 Certifications: RPM, ICPI, CPAA, Ardex, PROSOCO, Ultrafloor, Ameripolish, Retroplate, Certishine, FGS, Sherwin Wi liams,<br />
55 Ashford Formula, Sase, HTC, Versaflex, Consolodeck, L&M Sc<strong>of</strong>ield, Adsil<br />
56 Assumes a closed store remodel.<br />
57 Minor patching included - Break<strong>do</strong>wn available upon request<br />
58 1 (one) mobilization(s) included - Additional @ $2,500 per crew<br />
59 1 (one) 8'x8' Mock-up included - if insta led on day one <strong>of</strong> start <strong>of</strong> above scope <strong>of</strong> work - unless otherwise noted above<br />
60 10 Years experience <strong>with</strong> similar projects and scopes OPT / ALT BASE BID<br />
61 SUB TOTALS 3,000 40,500<br />
62 *SEE STANDARD EXCLUSIONS BELOW ! TOTAL AS BID<br />
! !<br />
Reg-Time Overtime Dbl-Time<br />
Field Supervisor 79.28 118.92 158.57<br />
Team Supervisor 72.46 108.69 144.93<br />
Field Technician 64.33 96.49 128.65<br />
BID 15-1234 OWN SHOES R US #123 - BIG MALL - ANYTOWN CA<br />
SHOES R US #123 - BIG MALL - ANYTOWN CA<br />
8/3/2015 16:49<br />
43,500<br />
$<br />
916-555-1234<br />
A.1 FLOOR PLAN<br />
SPECIFICATION 03 30 00<br />
PDCi sha l not be required to provide any additional labor, equipment or materials until such time as the General<br />
Contractor has signed and delivered a wri ten Change Order authorizing and approving such extra work, equipment<br />
and/or materials.<br />
Hourly Rates<br />
CA 818796<br />
916-555-9876<br />
!VERY IMPORTANT ! !!VERY IMPORTANT ! !!VERY IMPORTANT ! !VERY IMPORTANT ! !VERY IMPORTANT !VERY IMPORTANT ! !VERY IMPORTANT !<br />
STANDARD EXCLUSIONS: (These items are excluded UNLESS otherwise described in Scope <strong>of</strong> Work above) Water Pro<strong>of</strong>ing, Crack Isolation Membranes, Expansion joint Fi l/Sealants, Cleaning, Waxing,<br />
Protecting <strong>of</strong> su roundings and Vacuuming, Moisture, Bond and Alkalinity Testing, Moisture Remediation, Sca folding, Lifting Equipment, Heaters, Extensive Floor Preparation, Underlayment, Leveling and<br />
Priming, Grout Coats, Gloss & Slip Meter Testing, Post Installation Protection, Lighting, and Dumpsters.<br />
SLAB REMEDIATION: Clean, solid concrete substrate <strong>with</strong> no coatings, including residual coatings and curing sealers is assumed <strong>with</strong> only minor patching required; defined as 15 golf ba l size sprawls/holes<br />
per 1,000 square feet. Patching beyond minor patching, removal/replacement <strong>of</strong> existing path work, any additional work required is extra work beyond the base bid.<br />
CONTROL JOINTS: When Joint Fi ler is not excluded or priced seperately; PDC wi l fill ¼ inch or sma ler saw-cut control joints that are in good repair <strong>with</strong> squared o f shoulders. Repairing control joints prior to<br />
fi ling is extra work beyond the base bid.<br />
APPLICABLE DOCUMENTS<br />
BIG MALL<br />
PROPOSAL<br />
SHOES R US<br />
OWNER<br />
rev.033015.1<br />
RPM<br />
UNLESS OTHERWISE INDICATED - THIS PROPOSAL ASSUMES A CLEAN, FLAT CONCRETE SURFACE THAT IS FREE FROM ALL SETTING MATERIALS,<br />
ADHESIVES OR COATINGS OF ANY KIND, INCLUDING CURING COMPOUNDS AND WITH MINIMUM SURFACE DEFECTS SUCH AS SPALLS AND CRACKS. A<br />
"STANDARD PREP WORKSHEET" IS AVAILABLE UPON REQUEST.<br />
408-898-0256<br />
Tim Kennady OPEN REMODEL<br />
NON-UNION<br />
SUBCONTRACTOR WORK ORDER FOR SHOES R US #123 – BIG MALL – ANYTOWN, CA JULY 30, 2015 4<br />
Fee Schedule<br />
This project wi l be performed on a lump sum basis. The total value for the Services pursuant to this SWO shall<br />
not exceed:<br />
$37,845.00<br />
unless otherwise agreed to by both parties via the project change control procedure, as outlined <strong>with</strong>in. A PCR<br />
wi l be issued specifying the amended value.Payment wi l be made per the MSA (Sections 10, 11, 12)<br />
Invoice to:<br />
By Mail By eMail By Fax<br />
RPM | Finance<br />
5421 Stationers Way<br />
Sacramento, CA 95842<br />
tkennady@the-rpm-group.com 916-349-1211<br />
Exhibits<br />
1. Original Proposal<br />
2. Standard Prep Worksheet<br />
3. Shop Drawing / Take Off<br />
4. Specification 03 30 00<br />
5. Specification 03 35 00<br />
Assumptions<br />
1. 4 Day Insta lation<br />
2. Clean Sound Substrate<br />
Proposed Change Order Procedure<br />
Per the terms <strong>of</strong> the MSA (Section 5)<br />
IN WITNESS WHEREOF, the parties hereto have caused this SOW to be effective as <strong>of</strong> the day, month and year<br />
first written above.<br />
RPM Pacific Decorative Concrete<br />
By: By:<br />
Name: Timothy A Kennady Name:<br />
Title: President Title:<br />
SUBCONTRACTOR WORK ORDER FOR SHOES R US #123 – BIG MALL – ANYTOWN, CA JULY 30, 2015 3<br />
Stairs: NO Qty: - Elevator: unknown Size: -<br />
Lifting Equip Needed: unknown<br />
If so, What: -<br />
Park Dist. from Door: unknown<br />
Staging, load/unload area:<br />
unknown<br />
Secured Storage: YES<br />
Existing Floor: unknown Concrete Condition: unknown Concrete Hardness: unknown<br />
Po<strong>we</strong>r Available: unknown<br />
Break / Panel Type: -<br />
Can Breaker be provided? [ ]<br />
Dist. from Generator: unknown<br />
KTA-Tator, Inc. Relative Humidity<br />
Test Results, as <strong>of</strong> [Click to select<br />
date]: No tested as <strong>of</strong> 9/12/14! !<br />
Test 1 –%<br />
Test 2 –%<br />
Test 3 –%<br />
Test 4 –%<br />
Test 5 –%<br />
Test 6 –%<br />
Debris Disposal: NO - Remove from<br />
site<br />
Exclusions<br />
These items are excluded unless struck: Water Pro<strong>of</strong>ing, Crack Isolation Membranes, Expansion joint<br />
Fi l/Sealants, Cleaning, Waxing, Protecting <strong>of</strong> surroundings and Vacuuming, Moisture, Bond and Alkalinity<br />
Testing, Moisture Remediation, Scaffolding, Lifting Equipment, Heaters, Extensive Floor Preparation,<br />
Underlayment, Leveling and Priming, Grout Coats,<br />
Gloss & Slip Meter Testing, Post Insta lation Protection.<br />
SLAB REMEDIATION: Clean, solid concrete substrate <strong>with</strong> no coatings, including residual<br />
coatings and curing<br />
sealers is assumed <strong>with</strong> only minor patching required; defined by the Standard Prep Worksheet (SPW).<br />
Patching beyond minor patching, removal/replacement <strong>of</strong> existing patch work, any additional work required is<br />
extra work beyond the base bid.<br />
CONTROL JOINTS: Fi l saw-cut control joints that are in good repair <strong>with</strong> squared <strong>of</strong>f shoulders. Repairing<br />
control joints prior to fi ling may be extra work beyond the base bid – Refer to your SPW.<br />
Subcontractor Responsibilities<br />
1. Provide Po<strong>we</strong>r<br />
2. Provide Post Insta lation Protection (Ramboard)<br />
3. Pictures before, prior to densify (some <strong>of</strong> gloss mete readings) and at completion, to include pictures<br />
<strong>of</strong> gloss mete readings<br />
4. Completed SPW – regardless if there was any extra prep.<br />
Owner Responsibilities<br />
The Owners GC is required to provide clean substrate and clear lighted workspace. Any adhesive removal or<br />
other coatings or mortar bed removal is to be treated as a Change Order and MUST be approved PRIOR to start<br />
or RPM wi l NOT be compensated for extra work.<br />
SUBCONTRACTOR WORK ORDER FOR SHOES R US #123 – BIG MALL – ANYTOWN, CA JULY 30, 2015 2<br />
Engagement Resources<br />
RPM<br />
PM: Scott McGuire<br />
916-705-8578<br />
smcguire@the-rpm-group.com<br />
Owner: Foot Locker<br />
PM Contact: John Smith<br />
jsmith@ shoesrus.com<br />
916-555-5555<br />
GC: Smart Construction<br />
PM Contact: Jane Francisco<br />
209-327-9999<br />
Site Contact: David Freedman<br />
210-884-3000<br />
Scope <strong>of</strong> Work<br />
Subcontractor sha l provide the Services and Deliverable(s) as fo lows:<br />
1. Prep, Grind, Polish, Densify, Dye, Seal and Protect per Foot Locker Master Specification 03 30 00 a nd 03 35<br />
00;<br />
a) Subcontractor wi l prep the existing substrate as necessary to polish, densify, color and seal the floor<br />
to 1500 grit.<br />
b) Concrete (Staining/Scoring)– 2 Colors<br />
i) Concrete Grey<br />
ii) Midnight Black<br />
c) Additional Prep that exceeds the amount specified on<br />
the Worksheet requires verification <strong>of</strong> Owner or<br />
Owners representative (General Contractor) and a signed Worksheet must be submitted to RPM and<br />
approved by Clien to be paid.<br />
d) Insta l ramping at a l adjoining floor transitions and color and polish. (Ardex, TRU, Diamatic, TGA)<br />
e) Provide Po<strong>we</strong>r<br />
f) Post Insta lation Protection – RamBoard – NO substitutions. Tape a l seams – NO spo taping.<br />
Process sf Polish Level sf Detail Work Qty<br />
Demolition 0 200 0 Edgework (lf) 1,600<br />
Surface Prep 10,000 400 0 Dye (sf) 0<br />
Grind & Seal 0 800 0 Patching (sf) 0<br />
Overlay 0 1500 10,000 Joint Fi ler (lf) 1,200<br />
Thickness 0 Other Cracks (lf) 250<br />
Ramping 36 Other Deco Saw Cuts (lf) 0<br />
Other Other Post Protection (sf) 0<br />
Site Conditions<br />
Job Type: Retail (Ma l) Union Labor: NO Lighting: YES<br />
SUBCONTRACTOR WORK ORDER FOR SHOES R US #123 – BIG MALL – ANYTOWN, CA JULY 30, 2015 1<br />
Subcontractor Work Order 15-1234<br />
Issued To:<br />
Pacific Decorative Concrete<br />
5421 Stationers Way<br />
Sacramento, CA 95842<br />
Phone: 916-349-1200<br />
Fax: 916-349-1211<br />
5421 Stationers Way<br />
Sacramento, CA 95842<br />
916-349-1200<br />
916-349-1211<br />
SWO 1.0 15-1234 for Agreemen to Perform PolishingServices to Shoes R Us<br />
Project Name: SHOES R US #123 – BIG MALL – ANYTOWN, CA<br />
Date Services Performed By: Project:<br />
July 30, 2015 Pacific Decorative Concrete<br />
5421 Stationers Way<br />
Sacramento, CA 95842<br />
Phone: 916-349-1200<br />
Fax: 916-349-1211<br />
Shoes R Us<br />
#123<br />
Big Mall<br />
1 Main St<br />
Anytown, CA<br />
Suite #A<br />
CONGRATULATIONS! Your company is the beneficiary <strong>of</strong> a quality project through your RPM membership. Please<br />
review your Master Agreement and this SOW carefully as it contains a l <strong>of</strong> the information you need to satisfy<br />
our client and securing ou relationship <strong>with</strong> them. Yo<br />
u are a very important part <strong>of</strong> the RPM team! If you need<br />
any assistance, please contact us anytime or your most trusted RPM partner. – GOOD LUCK!<br />
This Subcontract Work Order(SWO) 15-1234 is issued pursuan to a Purchasing Agreement bet<strong>we</strong>en RPM and<br />
Shoes R Us and the Master Services Agreement(MSA) bet<strong>we</strong>en RPM and Pacific Decorative Concrete<br />
(“Subcontractor<strong>”</strong>). This SWO is subjec to the terms and conditions contained in the MSA bet<strong>we</strong>en the parties<br />
and are made a part there<strong>of</strong>. Any term not otherwise defined herein sha l have the meaning specified in the<br />
MSA. In the event <strong>of</strong> any conflict or inconsistency bet<strong>we</strong>en the terms <strong>of</strong> this SWO and the terms <strong>of</strong> the MSA,<br />
the terms <strong>of</strong> this SWO sha l govern and prevail<br />
.<br />
This SWO # 15-1234 effective as <strong>of</strong> July 30, 2015, is entered into by and bet<strong>we</strong>en Subcontractor and RPM, and is<br />
subject to the terms and conditions specified below. The Exhibit(s) to this SWO, if any, sha l be deemed to be a<br />
part here<strong>of</strong>. In the event <strong>of</strong> any inconsistencies bet<strong>we</strong>en the terms <strong>of</strong> the body <strong>of</strong> this SWO and the terms <strong>of</strong><br />
the Exhibit(s) hereto, the terms <strong>of</strong> the body <strong>of</strong> this SWO sha l prevail.<br />
Period <strong>of</strong> Performance<br />
1. The Services sha l commence on September 30, 2015, and sha l continue through October 10, 2015.*<br />
*Note: These dates are estimated insta lation dates. Verify <strong>with</strong> site superintendent! !<br />
2. 10 Day Installation.<br />
3. Night work unless otherwise specified by Shoes R Us GC.<br />
DATE/TIME OWNER/GC PROPOSAL WO 1.0 15-1234<br />
STORE # 123 # PHONE<br />
NAME/DIVISION PM<br />
LOCATION PHONE<br />
ADDRESS 1 SUPER BID SET 05/25/15<br />
ADDRESS 2 PHONE ADDENDUM 1<br />
SPACE # A SALES OFFICE DELTA 2<br />
CITY ANYTOWN ESTIMATOR CONST TYPE OPEN REMODEL<br />
STATE CA DIRECT WAGE RATE NON-UNION<br />
PDCI LIC # EMAIL tkennady@the-rpm-group.com<br />
! !<br />
QTY DESCRIPTION OF WORK COMPLETED<br />
1 Debris Disposal<br />
2 Provided On-Site<br />
3 1 Haul Away<br />
4 Temporary Po<strong>we</strong>r<br />
5 Provided On-Site<br />
6 1 Generator (480 V / 3 Phase)<br />
7 Misc<br />
8 Lighting<br />
9 Water<br />
10 Other (Explain)<br />
11<br />
12 10000 SF POLISHED CONCRETE<br />
13 Insta l natural Diamond Polish floor finish at areas indicated on the a tached takeo f.<br />
14 Diamond grind concrete <strong>floors</strong> using dry method <strong>with</strong> metal/resin bonded diamond abrasives at both field and edges;<br />
15 tooling is fi ted <strong>with</strong> hepa filter dust extractor/co lectors capturing 99.9 percent <strong>of</strong> airborne dust. Perform minor floor<br />
16 patching as identified in standard exclusions in red box at bo tom <strong>of</strong> this bid and ye low box a top <strong>of</strong> this bid.<br />
17 Insta l Densifier (or approved equal) in accordance <strong>with</strong> manufacture specifications.<br />
18 Continue to refine using successively fine resin bonded diamond abraisives while removing scratches from previous grits.<br />
19 Polish concrete up to 1,500 grit <strong>with</strong> resin bonded diamond abrasives.<br />
20 Insta l Guard\Sealer (or approved equal) to floor in accordance <strong>with</strong> manufacture specifications.<br />
21 Burnish floor diamond twister pad to completion <strong>with</strong> high speed burnisher.<br />
22 Mock-up is to be perform upon a rival to start scope <strong>of</strong> work; otherwise, a separate mobilization fee wi l be charged.<br />
23<br />
24 10000 SF OPEN STORE REMODEL<br />
25 Open store remodel <strong>with</strong> work to be performed at night, minimum 8 hour shifts.<br />
26 Demob and remob equipment after each shift; figuring for six shifts.<br />
27 * A l dust containment is to be performed by others.<br />
28 * A l final cleaning is to be performed by others.<br />
29<br />
30 1 EA MOCK-UP<br />
31 PDC to perform an onsite mockup for approval by architect & end user as a separate mobilization prior to job start.<br />
32<br />
33 1 EA POWER<br />
34 480 V / 3 PHASE POWER<br />
35 PDC to provide 480V, 3 Phase po<strong>we</strong>r on site (Required for grinding equipment)<br />
36<br />
37 1200 LF JOINT FILLER<br />
38 PDCI to chase, clean out and insta l "Hi-Tech Polyurea" (or equal) polyurea joint fi ler in a l construction/control/<br />
39 expansion joints in areas to receive concrete polishing or sealer. Color: Clear.<br />
40<br />
41<br />
42<br />
43<br />
44<br />
45<br />
46<br />
47<br />
48<br />
49<br />
50<br />
51<br />
52<br />
53<br />
54<br />
55<br />
56<br />
57<br />
58<br />
59<br />
60<br />
61<br />
62<br />
63<br />
64<br />
65<br />
66 YES T-Rex Required?<br />
67<br />
68<br />
69<br />
70<br />
71<br />
72 Owner/GC Representative Signature Date<br />
73<br />
74<br />
75<br />
Installer Notes Above This Line<br />
*Signature <strong>do</strong>es not represent an agreemen to payment by the signer. Signature only verifies tha the work has been completed satisfactorily by the qualified representative for<br />
the Owner and/or GC.<br />
rev.033015.1<br />
1 MAIN ST<br />
YOU ARE NOT APPROVED TO PERFORM WORK OUTSIDE OF THE SCOPE INDICATED IN THIS WORK<br />
ORDER WITHOUT PROPER AUTHORIZATION! - CONTACT YOUR ESTIMATOR/PM<br />
CA 818796<br />
A.1 FLOOR PLAN<br />
RPM<br />
Tim Kennady<br />
408-898-0256<br />
WO 15-1234 SHOES R US #123 - BIG MALL - ANYTOWN CA<br />
SHOES R US #123 - BIG MALL - ANYTOWN CA WORK ORDER<br />
8/3/2015 16:58 OWNER<br />
SPECIFICATION 03 30 00<br />
916-555-1234<br />
SHOES R US APPLICABLE DOCUMENTS<br />
BIG MALL<br />
“Detail & Time Oriented<br />
Administrative Team.<br />
That’s How...<strong>”</strong><br />
Comprehensive and informative<br />
post-installation reporting.<br />
Proposals are easy to read and clearly<br />
identify base price and options.<br />
Inclusions and exclusions are also<br />
clearly identified along <strong>with</strong> labor<br />
costs, project and contact information.<br />
Included <strong>with</strong> your proposal package<br />
is the proposal itself, a worksheet<br />
identifying what is standard preparation<br />
work, and itemized pricing for<br />
additional scopes that may be necessary<br />
after the start <strong>of</strong><br />
your installation. No<br />
surprises - predict<br />
-<br />
able pre-negotiated<br />
pricing.<br />
RPM<br />
RPM<br />
10 YEAR WARRANTY!<br />
!<br />
"#$%!&'%%'()*+<br />
!"#$%&#'&($)*)'+$&,#)-.$+//&("#0+((+-$#12(#+33/)'+$)1-#<br />
31/).%)-4#.5.$&6#$1#7&#*(&*#,2.$)-4#'+2.&,#75#*11$#$(+**)'#)-#<br />
2-,&(#-1(6+/#2.&#+-,#.&(8)'*#$%&#.5.$&6#*1(#+#3&()1,#1*#9#<br />
5&+(#*(16#$%&#)-.$+//+$)1-#,+$&:#;%+-2*+'$2(&(#1*#$%&#<br />
'1-'(&$/).%)-4#.5.$&6#%10&8&(#0)//#42+(+-$&&#$%+$#$%&#<br />
*/11(#0)//#(&6+)-#,&-.)*)&,#*1(#+#3&()1,#1*#9
You mean besides the fact that<br />
its so BEAUTIFUL!?<br />
Well - it’s also;<br />
cleaner<br />
stronger<br />
brighter<br />
easier<br />
quicker<br />
cheaper<br />
harder<br />
greener<br />
It’s just simply BETTER-ER!<br />
EFFLORESCENT DUSTING ELIMINATED<br />
Polished concrete floor eliminates dusting entirely, making<br />
for a much healthier work environment.<br />
RESISTANT TO STAINS<br />
Polished concrete floor system transforms a porous<br />
concrete floor into a tightened surface, dense enough to<br />
keep water, oil, and other contaminants from penetrating<br />
the surface.<br />
STRONGER MORE DURABLE SURFACE<br />
The polished concete process hardens what was once<br />
beneath that old deteriorated surface.<br />
INCREASED LIGHTING<br />
With a floor as reflective as a polished concrete floor, the<br />
increased lighting in your facility benefits everyone.<br />
SAFER & LESS SLIPPERY<br />
It may look like glass, but it has a higher friction co-efficient<br />
than ordinary concrete.<br />
NO MORE TIRE MARKS<br />
With a polished concrete floor system, ordinary cleaning<br />
removes tire marks immediately.<br />
REDUCTION IN TIRE WEAR<br />
Level joints and polished concrete make the entire surface<br />
smooth, allowing tires to last much longer.<br />
MUCH LOWER MAINTENANCE<br />
The surface is so tightly compacted that it actually repels<br />
oils and other substances, making cleaning much<br />
easier than <strong>with</strong> other <strong>floors</strong>.<br />
REDUCED DOWN-TIME DURING INSTALL<br />
Concrete polishing is a dry process and there is no delay in<br />
making the floor available for use immediately upon<br />
completion.<br />
COST-EFFECTIVE<br />
Polished concrete is not only less expensive to install than<br />
most floor covering materials, it is significantly less<br />
expensive to maintain - and never needs replacement.<br />
BEAUTY<br />
No other floor system can boast such beauty as a Polished<br />
Concrete floor system.<br />
NO WAXING OR STRIPPING<br />
Polished concrete floor system never needs it!<br />
LONGEST-LASTING SOLUTION POSSIBLE<br />
There is simply no comparison to other floor systems<br />
when it comes to how long a floor can last.<br />
GO GREEN | ECO FRIENDLY<br />
High in durability and low in environmental impact, concrete is the perfect flooring material for<br />
sustainable work places. As builders and business owners discover the benefits <strong>of</strong> green<br />
construction, <strong>with</strong>out sacrificing aesthetics or going over budget, there are more retail,<br />
industrial, commercial and public spaces starting to use polished concrete flooring. Going green<br />
isn’t just good for the planet…it saves money too.<br />
Concrete <strong>floors</strong>, left exposed, help conserve resources by functioning as a foundation slab —<br />
when they are given a stain or polish, concrete flooring also has a decorative and aesthetic<br />
look. In other words, polished concrete <strong>floors</strong> <strong>of</strong>fer the benefits <strong>of</strong> both form and function!<br />
DESIGN VERSATILITY<br />
Decorative techniques such as polishing, coloring, staining, and stenciling give you a wide<br />
variety <strong>of</strong> design choices, allowing you to create <strong>floors</strong> that look like more traditional materials,<br />
such as tile or slate, or a custom design that is completely unique. There are also more environmentally<br />
friendly options for products used to color, stain, and seal concrete.<br />
DURABILITY & RESOURCE CONSERVATION<br />
When properly installed and sealed, a decorative concrete floor should last a lifetime, and <strong>with</strong><br />
proper maintenance, it will never need to be replaced. Few flooring materials can achieve this.<br />
Concrete <strong>floors</strong> also utilize sustainable materials. The main raw material for the cement in<br />
concrete is limestone; the most abundant mineral on earth.<br />
ENERGY EFFICIENCY<br />
Because <strong>of</strong> their thermal mass and ability to retain heat, concrete <strong>floors</strong> are ideal for passive<br />
solar designs. When spaces are built to take advantage <strong>of</strong> solar radiation entering through<br />
win<strong>do</strong>ws in the winter months, concrete <strong>floors</strong> will absorb the heat from the direct sunlight<br />
and release the stored heat as needed. It also increases ambient lighting by as much as 30%!<br />
ECONOMICAL<br />
An exposed concrete floor is almost always an economical alternative to other solutions that<br />
require an additional covering, such as hardwood flooring and tile. For new commercial<br />
projects <strong>with</strong> site-cast concrete floor slabs, leaving the concrete <strong>floors</strong> exposed can save a lot <strong>of</strong><br />
money over the life <strong>of</strong> the building.
ALTERNATIVE SOLUTIONS?<br />
We ARE the alternative solution!<br />
Existing Floor Covering<br />
Coating, Adhesive or Mortar<br />
Cream Finish<br />
Salt & Pepper Finish<br />
Medium Aggregate<br />
Heavy Aggregate<br />
Large Aggregate<br />
“For my facilities - Polished & Sealed<br />
Concrete is the only way I go!<strong>”</strong><br />
Polished Concrete<br />
(“They won’t see my face - right?<strong>”</strong>)<br />
- Carpet Supplier<br />
Design Options<br />
Performance Longevity<br />
Maintenance Ease<br />
Store & Release Solar Energy<br />
Moisture Vulnerability<br />
Mold, Dust, Mildew Resistant<br />
Sustainable<br />
Square Foot Cost
Retail Polishing Management LLC (RPM) and its membership believe in the<br />
importance <strong>of</strong> specifications and the interface their function creates<br />
bet<strong>we</strong>en the supplier and the owner.<br />
The supplier identified in this commitment is one that has certified our<br />
company in the intended use and/or installation <strong>of</strong> their product and<br />
requires that certification to purchase and/or obtain a warranty for their<br />
product.<br />
We acknowledge that our supplier has put forth effort and expense for the<br />
purpose <strong>of</strong> receiving the benefits that come <strong>with</strong> having their product<br />
included in specifications and that our Supplier has a reasonable expectation<br />
that <strong>we</strong> will honor that specification.<br />
We understand that our Supplier will engage in competitive activities in the<br />
normal c<strong>ours</strong>e <strong>of</strong> their business to protect and/or cause or affect change in<br />
specifications and <strong>we</strong> agree not to interfere in those activities.<br />
WE ARE COMMITTED TO AND ARE HEREBY RESOLVED;<br />
That <strong>we</strong> will install the specified product <strong>of</strong> our Supplier in all cases<br />
and under all circumstances regardless <strong>of</strong> any financial incentives to <strong>do</strong><br />
otherwise.<br />
When one or more products are specified by more than one<br />
Supplier, it will be at our discretion which product is most appropriate for the<br />
project.<br />
If there is an alternative product listed in the specification to our<br />
Suppliers product that is an ‘<strong>of</strong>f shelf’ product, or if an ‘or equal’ is stated in<br />
any specification, <strong>we</strong> will only provide for the bid, installation and/or use <strong>of</strong><br />
our Suppliers product exclusively.<br />
Under no circumstance will <strong>we</strong> recommend, submit a proposal for,<br />
install and/or use an alternate product to the one exclusively listed in the<br />
specification <strong>of</strong> our Supplier and identified in our bid.<br />
Your Warranty!<br />
W<br />
E, the certificated installer, warrant our application <br />
polishing system to be free <strong>of</strong> dusting caused by foot traffic in <br />
under normal use and service <strong>of</strong> the system for a period <strong>of</strong> 1 <br />
year from the installation date. The manufacturer <strong>of</strong> the <br />
concrete polishing system ho<strong>we</strong>ver will guarantee that the <br />
floor will remain densified for a period <strong>of</strong> 10 years. This means <br />
that if the floor was put under a microscope that the densifier <br />
will still be present in the floor after a ten year period. A basic <br />
one step grind, densify and re-‐polish is all that will be <br />
necessary to rejuvenate a polished floor after a ten year period <br />
if not maintained properly. There are many ways to prolong <br />
the longevity <strong>of</strong> your new polished concrete floor. This <br />
warranty <strong>do</strong>es not cover the longevity <strong>of</strong> the <strong>floors</strong> polished <br />
shine. It is up to you the customer to maintain this shine by <br />
using the proper cleaning materials as mentioned. If the floor <br />
fails to perform as indicated as per its advertised claims and <br />
benefits after a one year period, the installer will provide the <br />
necessary labor, materials and equipment to re-‐apply a <br />
standard application <strong>of</strong> densified used in the concrete polishing <br />
system. <br />
This warranty <strong>do</strong>es not apply to defects resulting from <br />
faulty concrete, structural defects, abuse or any other <br />
unusual circumstance beyond the scope <strong>of</strong> the product <br />
limitations. The foregoing warranty to re-‐apply a <br />
standard application <strong>of</strong> concrete polishing system is <br />
the only warranty, either expressed, implied or <br />
statutory, upon which the said application is sold. All <br />
other damages, liabilities or warranties, statutory or <br />
otherwise, are hereby waived. <br />
President, Retail Polishing<br />
Management LLC
Using a concrete sealer prevents water from penetrating the material,<br />
reducing the risk <strong>of</strong> cracks and other types <strong>of</strong> water damage. Stains are<br />
also greatly reduced. Preventing staining and moisture can discourage the<br />
growth <strong>of</strong> mold that might use the concrete as a substrate.<br />
Increase the concrete’s longevity<br />
Improves appearance<br />
It is cost effective<br />
Fast & efficient installation<br />
Reduces spalling, flaking and cracking<br />
Protection from oil spills and other stains<br />
Mold and mildew resistant
SEALED<br />
The durability and performance <strong>of</strong> polished concrete makes it a leading<br />
choice finish for retail stores, warehouses, <strong>of</strong>fice facilities, and municipalities.<br />
Even homeowners are making the choice towards <strong>these</strong> beautiful,<br />
high-luster <strong>floors</strong> that imitate the look <strong>of</strong> polished stone.<br />
Increase the concrete’s longevity<br />
Improves appearance and visual appeal<br />
Adds value to the property<br />
Least expensive to install in most cases<br />
Reduces spalling, flaking and cracking<br />
Protects from stains and spills<br />
Mold and mildew resistant
TAINED<br />
GOLD RAW SIENNA CARAMEL SAND<br />
TERRA COTTA MAHOGANY SADDLE BROWN CHOCOLATE BROWN<br />
WALNUT BURNT SIENNA CHESTNUT RED<br />
MAROON SEPIA EGGPLANT TURQUOISE<br />
SLATE BLUE PATRIOT BLUE GREEN PINE GREEN<br />
FOREST GREEN GRAY BLACK MIDNIGHT BLACK<br />
STAINED CONCRETE IS BEAUTFUL, ELEGANT<br />
AND A WARM FLOORING SOLUTION<br />
Acid stain is not a paint or coating agent, rather, it’s a coloring process<br />
involving a chemical reaction on a cementitious material. A solution made<br />
<strong>with</strong> water, acid, and inorganic salts react <strong>with</strong> minerals already present in<br />
the concrete, and the result <strong>of</strong> this reaction is color.<br />
Great durability<br />
Elegance & beauty<br />
Energy savings<br />
Light maintenance<br />
Optimal air quality<br />
Unsurpassed water resistance<br />
Sustainable
POXY<br />
OATINGS<br />
Providing outstanding resistance to corrosive chemicals, heat, and<br />
ultra violet light. Epoxy Coatings also exhibit excellent dimensional<br />
stability, extreme toughness, and abrasion resistance. They come in a<br />
variety <strong>of</strong> color and texture options.
Surface Preparation is an extremely important part <strong>of</strong> any decorative concrete<br />
solution. Whether it is removing existing coatings or impurities, leveling<br />
or pr<strong>of</strong>iling the substrate to apply other coatings; Surface Preparation<br />
<strong>do</strong>ne correctly ensures proper bonding to your substrate.<br />
Remove existing coatings<br />
Remove surface impurities<br />
Repair cracks and spalls<br />
Leveling and pr<strong>of</strong>iling<br />
Overlayments<br />
Repair surface blemishes<br />
Moisture remediation
026
Retail Polishing Management LLC<br />
Concrete Sealing, Staining, Polishing, Coating & Surface Prep Solutions for clients<br />
whose various real estate interests are diversely located geographically.<br />
Processing and Beautifying Concrete for National Accounts is what <strong>we</strong> <strong>do</strong>...<br />
5421 Stationers Way<br />
Sacramento, CA 95842<br />
888.RPM.1111<br />
www.the-rpm-group.com<br />
info@the-rpm-group.com<br />
Local | Regional | National | Global