SCHEDULELkOUTPUTS<br />

Completed Incremental Design<br />

Review (IDR)<br />

Performed Stage Integration<br />

Reviews (SIR)<br />

A series of incremental, cumulative reviews throughout the design phase to assure that system<br />

level requirements are properly implemented in the design, have traceability, and that hardware<br />

and software can be integrated to support staged assembly and operation. IDR # 1 performed<br />

these functions for flights 1A/R through 6A. Subsequently, IDR #2 assessed design progress for<br />

flights 1A/R through 7A. IDR#2B assessed the entire Space Station assembly sequence.<br />

IDRs have been replaced by Stage Integration Reviews (SIR), a more classical critical design<br />

review approach on a stage-by-stage basis which review groupings of flights with assembly<br />

hardware and functionality/performance linkages across the stage.<br />

Performed SIR 1 for flights through 2A (4th Qtr FY 1997)<br />

Performed SIR 2 for flights through 4A (1st Qtr FY 1998)<br />

Performed SIR 3 for flights through 6A (2nd Qtr FY 1998)<br />

Performed SIR 4 for flights through 4R (1" Qtr FY 1999)<br />

Performed SIR 5 for flights through UF-2 (1"' Qtr FY 2000)<br />

Perform SIR 6 for flights through 9A. 1 (2'Id Qtr FY 2000)<br />

Perform SIR 7 for flights through 13A (4" Qtr FY 2000)<br />

Perform SIR 8 for flights through 1OA. 1 (2"d Qtr FY 2001)<br />

Perform SIR 9 for flights through UF3 (3rd Qtr FY 2001)<br />

Prime Development Activity NOTE: All activities listed are planning milestones, and are not contractual.<br />

Flight lA/R: Self-powered, active vehicle: provides attitude control through early assembly stages: provides<br />

Zarya (FGB Energy Block) fuel storage capability after the service module is attached: provides rendezvous and docking<br />

(First Element Launch) capability.<br />

(Proton Launch Vehicle)<br />

Planned (Rev B): Nov. 1997 Completed factory ground testing of first flight unit (slip from 3rd Qtr FY 1997 to 2nd Qtr FY<br />

Revised (Rev D Mod): Nov. 1998 1998)<br />

Completed November 1998 Completed flight software (slip from 3rd Qtr FY 1997 to 1st Qtr FY1998)<br />

0 Delivered FGB flight article to Baikanour (slip from 3rd Qtr FY 1997 to 2'ld Qtr FY 1998)<br />

Installed solar arrays in FGB flight article (slip from 1"' Qtr FY 1998 to 3rd Qtr FY 1998)<br />

Removed Zarya from storage and complete deconservation (1"' Qtr FY 1999)<br />

Mated FGB to Launch Vehicle (slip from 1"' Qtr FY 1998 to 1st Qtr FY 1999)<br />

On-Orbit checkout, Service Module docking, fuel transfer (slip from 1"' Qtr FY 1998 to 1"' Qtr<br />

FY 1999)<br />

0 Launch of the Zarya (1"' Qtr FY 1999)<br />

HSF 1-8