6.5 Standard Offer; Standard Product<br />
There have been some teething problems in these programmes due to overlaps<br />
between them. Current thinking is to decide which would be the most efficient<br />
and effective route to follow in order to get the fastest turnaround time.<br />
A marketing blurb has been done and is on the Eskom IDM website. There are<br />
simple steps to follow, and we could make a link to this on our website.<br />
Mr Etzinger asked that anybody experiencing any hiccups on these programmes,<br />
or wishing to make suggestions, should please contact him.<br />
6.6 Heat pump rebate<br />
14 suppliers have now been registered. The delay was that SABS do not have<br />
standards for heat pumps. Eskom specialists have looked at the quality of the<br />
suppliers and on this basis have approved certain suppliers. A formal<br />
accreditation process from SABS should be ready within about 3 – 4 months.<br />
6.7 SWH rebate review<br />
Currently these rebates are subject to revision. This will be announced in the<br />
near future. The take-up of this programme is growing very fast. Of the 40 000<br />
installed and applied for during the past three years, a total of 10 000 have been<br />
done in February alone.<br />
One issue receiving attention is that local content must be built into the rebate.<br />
6.8 Downlighters workshop.<br />
This workshop (that was held on 31 March) focussed on this lighting technology.<br />
The next big wave after CFLs will be LEDs.<br />
6.9 Demand Response Programme.<br />
This used to be called Demand Market Participation with Key customers. Eskom<br />
now want to expand this to smaller customers that would be able to participate by<br />
means of aggregating sufficient capacity to qualify. A memo on this matter is<br />
posted on the Eskom website. It is likely that this opportunity could stimulate a<br />
whole new service industry of agents that could act on behalf of several smaller<br />
customers to effect this aggregation and metering.<br />
This system is currently working well in the US. At the “Right Price” anything can<br />
be switched off. Mr Etzinger emphasised that the grid needs an additional<br />
1600MW by January next year!<br />
Eskom will contract this with an international agency that has done this<br />
worldwide. They will then negotiate with indiviuduals to join. A two part tariff<br />
system is being considered, consisting of a fixed chare as well as a running<br />
charge.<br />