01.03.2013 Views

MINUTES

MINUTES

MINUTES

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.5 Standard Offer; Standard Product<br />

There have been some teething problems in these programmes due to overlaps<br />

between them. Current thinking is to decide which would be the most efficient<br />

and effective route to follow in order to get the fastest turnaround time.<br />

A marketing blurb has been done and is on the Eskom IDM website. There are<br />

simple steps to follow, and we could make a link to this on our website.<br />

Mr Etzinger asked that anybody experiencing any hiccups on these programmes,<br />

or wishing to make suggestions, should please contact him.<br />

6.6 Heat pump rebate<br />

14 suppliers have now been registered. The delay was that SABS do not have<br />

standards for heat pumps. Eskom specialists have looked at the quality of the<br />

suppliers and on this basis have approved certain suppliers. A formal<br />

accreditation process from SABS should be ready within about 3 – 4 months.<br />

6.7 SWH rebate review<br />

Currently these rebates are subject to revision. This will be announced in the<br />

near future. The take-up of this programme is growing very fast. Of the 40 000<br />

installed and applied for during the past three years, a total of 10 000 have been<br />

done in February alone.<br />

One issue receiving attention is that local content must be built into the rebate.<br />

6.8 Downlighters workshop.<br />

This workshop (that was held on 31 March) focussed on this lighting technology.<br />

The next big wave after CFLs will be LEDs.<br />

6.9 Demand Response Programme.<br />

This used to be called Demand Market Participation with Key customers. Eskom<br />

now want to expand this to smaller customers that would be able to participate by<br />

means of aggregating sufficient capacity to qualify. A memo on this matter is<br />

posted on the Eskom website. It is likely that this opportunity could stimulate a<br />

whole new service industry of agents that could act on behalf of several smaller<br />

customers to effect this aggregation and metering.<br />

This system is currently working well in the US. At the “Right Price” anything can<br />

be switched off. Mr Etzinger emphasised that the grid needs an additional<br />

1600MW by January next year!<br />

Eskom will contract this with an international agency that has done this<br />

worldwide. They will then negotiate with indiviuduals to join. A two part tariff<br />

system is being considered, consisting of a fixed chare as well as a running<br />

charge.<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!