10.03.2013 Views

Advanced CANDU Reactor ACR-1000 ACR 1000

Advanced CANDU Reactor ACR-1000 ACR 1000

Advanced CANDU Reactor ACR-1000 ACR 1000

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fast & Simplified Outages<br />

• Faster application and removal of GSS – current efforts<br />

on Rod based<br />

• 4-division power supply and heat sinks<br />

– Electrical distribution and heat sink maintenance not critical<br />

path<br />

– Steam generators (SG) not required as back-up heat sink<br />

– Fuel channel and SG inspections in parallel<br />

• Back-up power for essential outage equipment<br />

• More walkways and hoists, few temporary scaffolds<br />

• R/B elevator for personel, tools and equipment<br />

• Air, power and water for outage maintenance areas<br />

38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!