FTTX SYSTEM CATALOGUE 2011 E 2011 - Emtelle Scandinavia A/S
FTTX SYSTEM CATALOGUE 2011 E 2011 - Emtelle Scandinavia A/S
FTTX SYSTEM CATALOGUE 2011 E 2011 - Emtelle Scandinavia A/S
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Air Blown Fibre FttX Customers Fibre Products Tube Bundle Sub-Duct Accessories Installation Equipment Tools Training <strong>Emtelle</strong> Offi ces Terms & Conditions<br />
44<br />
I N N O V A T I O N A N D F L E X I B I L I T Y<br />
ACCESSORIES<br />
Kitting: Pre-assembled, Pre-fi tted, Customised FttX Solutions<br />
as customised, preassembled<br />
units, making their deployment<br />
easier and faster. Kitting not only integrates products, it simplifi es the procedures<br />
required to install them. This further lessens technicians’ workloads,<br />
accelerates the installation process, reduces the investment per home and<br />
increases the total installation capacity.<br />
With the Kitting option, <strong>Emtelle</strong> can combine products to create value beyond<br />
the sum of the individual parts: we put more value in the box and take<br />
more labour out of it. We have established a dedicated unit that will be<br />
responsible for the complete and timely delivery of Kitting products, which<br />
<strong>Emtelle</strong> provides FttX solutions that signifi cantly reduce day-one Capital Expenses (CapEx). In the<br />
period 2005-2009, <strong>Emtelle</strong> has reduced CapEx per connected home by more than 35%. This reduction<br />
has been achieved as a result of : easier and faster installation, lower skill sets and reduced<br />
manpower required – they all lower initial investment. To these can be added another innovative<br />
way in which <strong>Emtelle</strong> reduces CapEx for its customers: Kitting. In Kitting, products are put together<br />
Telecoms Sectional Access Chambers<br />
Concrete Cover<br />
page 46<br />
we can develop on a project by project basis. Kitting<br />
provides an exceptional degree of simplifi cation and<br />
customisation for our customers, confi rming our position<br />
as the world’s foremost, most forward-thinking<br />
FttX solution provider.<br />
Preformed access chambers offer users de-skilled, fast track construction method with a single site visit without the need for concrete<br />
backfi ll. Installation carried out for BT, complete chambers were constructed from excavation to reinstatement in just over one hour.<br />
Chambers have been independently tested to meet the requirements for Class C250 of BS EN124:19954 making them suitable for all<br />
non-carriageway applications including areas subject to slow moving HGV loads.<br />
Frame<br />
page 46<br />
Manhole<br />
Step Iron<br />
page 47<br />
Sump<br />
Mini cable<br />
page 18<br />
Mini Cable<br />
Storage Reel<br />
page 48<br />
Locking Holes<br />
At <strong>Emtelle</strong> we strive to improve our products every day and therefore strongly suggest that all new orders and specifications be confirmed by your <strong>Emtelle</strong> representative. The current specifications may be different<br />
from those listed in our latest catalogues, which are limited by publication date. For the latest specifications please visit our website at www.emtelle.com or contact your <strong>Emtelle</strong> representative.<br />
<br />
1300<br />
1200<br />
1100<br />
1000<br />
900<br />
800<br />
700<br />
600<br />
500<br />
400<br />
300<br />
200<br />
100<br />
2003<br />
Badge<br />
Labour<br />
Passive System Components<br />
= Capital Expense per home connected<br />
2004 2005 2006 2007 2008 2009<br />
Source: <strong>Emtelle</strong><br />
Cable Bearer (x 2)<br />
page 47<br />
Locking Pin<br />
page 48<br />
Duct 2x<br />
Reduced CapEx<br />
-37%