Blowout Preventer Stack and Control Systems - Lillehammer Energy ...
Blowout Preventer Stack and Control Systems - Lillehammer Energy ...
Blowout Preventer Stack and Control Systems - Lillehammer Energy ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
WARRANTIES<br />
It is warranted that where the Assured is the operator or joint operator on any<br />
insured well being drilled, deepened, serviced, worked over, completed <strong>and</strong>/or<br />
reconditioned, a blowout preventer(s) of st<strong>and</strong>ard make will, when in accordance<br />
with all regulations, requirements <strong>and</strong> normal <strong>and</strong> customary practices in the<br />
industry, be set on surface casing or on the wellhead <strong>and</strong> installed <strong>and</strong> tested in<br />
accordance with usual practice.<br />
WELL WELL OUT OF CONTROL CONTROL DEFINITION<br />
DEFINITION<br />
“…a well(s) well(s) shall be deemed deemed to be out of control control only when when there is an<br />
unintended unintended flow from the well(s) well(s) of drilling drilling fluid, oil, gas or water water above above the<br />
surface surface of the ground ground or water water bottom, bottom,<br />
which which flow cannot cannot promptly promptly be…stopped be…stopped by use of the equipment equipment on site <strong>and</strong>/or <strong>and</strong>/or<br />
the blowout blowout preventer, preventer, storm storm chokes chokes or other other equipment equipment …”