28.03.2013 Views

Blowout Preventer Stack and Control Systems - Lillehammer Energy ...

Blowout Preventer Stack and Control Systems - Lillehammer Energy ...

Blowout Preventer Stack and Control Systems - Lillehammer Energy ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WARRANTIES<br />

It is warranted that where the Assured is the operator or joint operator on any<br />

insured well being drilled, deepened, serviced, worked over, completed <strong>and</strong>/or<br />

reconditioned, a blowout preventer(s) of st<strong>and</strong>ard make will, when in accordance<br />

with all regulations, requirements <strong>and</strong> normal <strong>and</strong> customary practices in the<br />

industry, be set on surface casing or on the wellhead <strong>and</strong> installed <strong>and</strong> tested in<br />

accordance with usual practice.<br />

WELL WELL OUT OF CONTROL CONTROL DEFINITION<br />

DEFINITION<br />

“…a well(s) well(s) shall be deemed deemed to be out of control control only when when there is an<br />

unintended unintended flow from the well(s) well(s) of drilling drilling fluid, oil, gas or water water above above the<br />

surface surface of the ground ground or water water bottom, bottom,<br />

which which flow cannot cannot promptly promptly be…stopped be…stopped by use of the equipment equipment on site <strong>and</strong>/or <strong>and</strong>/or<br />

the blowout blowout preventer, preventer, storm storm chokes chokes or other other equipment equipment …”

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!