- Page 1: Best Practices Quality Asphalt Plac
- Page 5 and 6: Reachable Goals Maintaining the Hig
- Page 7 and 8: Get Your Pen & Note Pad! Retain The
- Page 9 and 10: Quality Pavements Proper Mix Design
- Page 11 and 12: All Over A Sound Base Quality Comme
- Page 13 and 14: Quality in HMA Pavements “Is Ever
- Page 15 and 16: From Start to Finish
- Page 17 and 18: “Let’s Get Down to Where the Ru
- Page 19 and 20: Truck Driver’s Responsibilities W
- Page 21 and 22: Define Sensitive Mixes Broadcast a
- Page 23 and 24: Proper Truck Loading Sensitive Mixe
- Page 25 and 26: Minimize Segregation in Corners Fir
- Page 27 and 28: Controlling Quality • Transportat
- Page 29 and 30: Tarp the Load Limit Heat Loss!
- Page 31 and 32: Breaking the Load Raise the Bed Unt
- Page 33 and 34: Presentation of HMA to the Paver Ho
- Page 35 and 36: Direct Discharge Hauling Unit Disch
- Page 37 and 38: Don’t Run the Hopper Empty!
- Page 39 and 40: Don’t Allow HMA to Dribble When R
- Page 41 and 42: Don’t Hold the Brakes Too Tightly
- Page 43 and 44: Don’t Clean & Leave Piles of HMA
- Page 45 and 46: Windrow Paving Surge Capacity
- Page 47 and 48: Windrow Paving Dump Person’s Resp
- Page 49 and 50: Start Up Procedures “Windrow Pavi
- Page 51 and 52: “Windrow Paving Operation” Don
- Page 53 and 54:
Aligning the Windrow Center the Win
- Page 55 and 56:
Pick Up the Windrow Cleanly Watch t
- Page 57 and 58:
Watch For Segregation! Rock and The
- Page 59 and 60:
Watch For Segregation Here!!!!
- Page 61 and 62:
MC-330 Material Transfer
- Page 63 and 64:
Hopper Insert Level 60% or Above
- Page 65 and 66:
Material Transfer Units Desensitize
- Page 67 and 68:
Paving Speed “Operators Look in T
- Page 69 and 70:
Moving HMA Through the Paver “Min
- Page 71 and 72:
Eight Paver Areas “Where Segregat
- Page 73 and 74:
1 Hopper Corners Solution Plates ca
- Page 75 and 76:
4 Identifying Segregation Potential
- Page 77 and 78:
Identifying Segregation Potentials
- Page 79 and 80:
5 If Kick Back Flights are Worn or
- Page 81 and 82:
Centerline Streak Quarter Point Str
- Page 83 and 84:
Identifying Segregation Potentials
- Page 85 and 86:
Controls the Volume of HMA Here Sen
- Page 87 and 88:
Segregation Here 12 to 18” “Bre
- Page 89 and 90:
Head of Material • Most Important
- Page 91 and 92:
HMA Volume Established Need Tunnel
- Page 93 and 94:
Controlling Quality “Reading The
- Page 95 and 96:
Lines or Steps in the Mat Steps or
- Page 97 and 98:
Screeding For Quality Joints Smooth
- Page 99 and 100:
Screeding For Smoothness • Proper
- Page 101 and 102:
Mission Statement Satisfy Our Custo
- Page 103 and 104:
Where Do We Look? • Loading The H
- Page 105 and 106:
Plan of Action “Transportation, P
- Page 107 and 108:
Plan of Action “Move HMA Through
- Page 109 and 110:
Plan of Action “Move HMA Through
- Page 111 and 112:
Plan of Action Transverse & Longitu
- Page 113 and 114:
Plan of Action “Safety” Most Im
- Page 115 and 116:
Those Who Learn and Apply Will Driv