Gen. 1<br />

Gen. 2<br />

Single point earthing<br />

50 mA<br />

Note that discrimination of earth leakage protection<br />

can normally only be achieved by using time delays.<br />

This is not compatible with personnel protection.<br />

Generally the generating set earth leakage protection<br />

should be delayed if possible.<br />

e/f<br />

Load<br />

Phase current<br />

Earth leakage current = 50 mA<br />

Gen 1 Earth path current<br />

Gen 2 Earth path current<br />

CT current<br />

The earth leakage protection on Gen. 1<br />

is arranged to intertrip both generators.<br />

There are no shared current paths and<br />

no circulating current therefore exists in<br />

the earth path.<br />

The set neutrals are interconnected<br />

and three pole circuit breakers are<br />

used.<br />

The earth leakage protection ignores<br />

any circulating current in the neutral<br />

paths.