Alderperson Clemons stated he is going to walk through the neighborhood to get a feel <strong>of</strong><br />
what the residents want.<br />
Alderperson Martin highly encourages sidewalks be installed for parents with strollers and<br />
ADA accessibility.<br />
Motion to hold by C. Wahl, seconded by G. Dannecker.<br />
Vote on Motion. (4/0)<br />
g. Award <strong>of</strong> 2013 Materials Testing Contract (M-13) to OMNNI Associates, Inc., in an amount<br />
not to exceed $100,000.<br />
Motion to approve by P. Coenen, seconded by G. Dannecker.<br />
Vote on Motion. (4/0)<br />
i. Award Traffic Sign Replacement Contract, Unit L-12, to 3M Company in an amount not to<br />
exceed $300,000.<br />
Motion to approve by G. Dannecker, seconded by C. Wahl.<br />
Vote on Motion. (4/0)<br />
j. Request from Mark’s East Side for a permanent street occupancy permit for the sign at 1405<br />
E. Wisconsin Avenue be approved with a minimum clearance <strong>of</strong> 10 feet.<br />
Motion to approve by G. Dannecker, seconded by C. Wahl.<br />
Alderperson Wahl what is city policy on graphic signs?<br />
Director Vandehey stated Municipal Services is in charge <strong>of</strong> the sign placement if in the<br />
street right-<strong>of</strong>-way. The actual sign itself will have to meet all the sign codes which is<br />
reviewed through Planning and Inspection staff.<br />
Vote on Motion. (4/0)<br />
INFORMATION ITEM<br />
a. Director’s Update<br />
• Tree planting at Riverside Cemetery<br />
Director Vandehey stated Attorney Walsh received notification from Riverside<br />
Cemetery due to the onset <strong>of</strong> cold weather the cemetery will plant the trees in Spring <strong>of</strong><br />
2013.<br />
b. Olde Oneida Street Bridge over the Fox River Project update.<br />
Chad Weyenberg updated the Committee and stated some <strong>of</strong> the bearings are in much worse<br />
condition than anticipated from the 2004 Bridge Condition Report. All the bearings will be<br />
repaired as part <strong>of</strong> the Local Bridge Program. He stated the contractor will be back out in<br />
January and this work will take about 8 weeks. In March they hope to have traffic back on<br />
the bridge. There will have to be some closures again in the Spring for punch list items,<br />
pavement marking, painting, etc. Additional project cost is estimated at $135,000 ($27,000<br />
local share).<br />