HOW TO PRESENTATION
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TEST COMPLETING TITLES FOR THE 1 DISCLAIMER LINE<br />
TEST TITLES FOR 2 LINES<br />
BOTH LOFT AND CAVITY<br />
ENSURE THAT THE NAME,<br />
ADDRESS, POSTCODE AND<br />
DATE OF SURVEY MATCHES<br />
THE MAIN SHEET BECAUSE<br />
THEY MAY BE SEPARATED<br />
ALWAYS GET A SIGNATURE<br />
LOFT INSULATION<br />
ALSO ENSURE THAT IF<br />
THERE ARE ANY ITEMS IN<br />
THE LOFT THAT THIS IS<br />
TICKED<br />
IF THEY WANT THE<br />
INSULATION OVER THE<br />
BOARDS – GET IT TICKED<br />
CAVITY INSULATION<br />
MANY CWI INSTALLS ARE<br />
CANCELLED BECAUSE THE<br />
CUS<strong>TO</strong>MER DOES NOT<br />
UNDERSTAND THE WORK<br />
INVOLVED<br />
THE MOST IMPORTANT<br />
TICKS ARE MAKING GOOD<br />
OF THE PAINTWORK AND<br />
INTERNAL DRILLING<br />
THERE WILL ALSO BE AT<br />
LEAST 1 TICK ON HERE <strong>TO</strong><br />
GET SIGNED<br />
READ THEM AND READ<br />
THEM AGAIN <strong>TO</strong> ENSURE<br />
EVERYTHING IS COVERED