IT-infrastructure in Zeuthen. - Desy
IT-infrastructure in Zeuthen. - Desy
IT-infrastructure in Zeuthen. - Desy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The comput<strong>in</strong>g centre <strong>in</strong> <strong>Zeuthen</strong> – an overview<br />
> 19 people<br />
> UPS:<br />
Tak<strong>in</strong>g care of any comput<strong>in</strong>g / telecommunication<br />
related work (there is no comput<strong>in</strong>g manpower <strong>in</strong><br />
the experiments)<br />
3 systems runn<strong>in</strong>g <strong>in</strong> parallel with 160 kW capacity each<br />
➔ 1 UPS runn<strong>in</strong>g as redundancy buffer<br />
> Air condition<strong>in</strong>g system:<br />
5 water-cooled Rittal racks with 20 kW cool<strong>in</strong>g power each<br />
Air condition<strong>in</strong>g with heat exchanger: 130 kW cool<strong>in</strong>g power<br />
Air condition<strong>in</strong>g with cooled water: 100 kW cool<strong>in</strong>g power<br />
In summer months we clearly see we reached the limit of the current air cool<strong>in</strong>g<br />
capacity<br />
> Currently more than 900 active server / storage systems<br />
~240 kW susta<strong>in</strong>ed power consumption<br />
Andreas Haupt | <strong>IT</strong>-<strong><strong>in</strong>frastructure</strong> <strong>in</strong> <strong>Zeuthen</strong> | June 6, 2011 | Page 10