VVR-S Reactor(cont.)<br />

In addition, a support from EC through Phare 2006 project related related<br />

to the<br />

infrastructure needed for decommissioning will be implemented. Through this<br />

project is made a refurbishment of the Radioactive Waste Treatment Treatment<br />

Plant (STDR)<br />

Magurele, for treatment <strong>and</strong> conditioning of radioactive waste from from<br />

decommissioning (the liquid processing is not operational for the the<br />

moment).<br />

Regarding the management of spent fuel from VVR-S VVR S Research Reactor, the main<br />

issue is related to the corrosion in time of the old Aluminum EK-10 EK 10 spent fuel of<br />

VVR-S VVR S reactor Magurele.<br />

As Romania get international technical assistance through Russian Russian<br />

Research<br />

Reactor Fuel Return Program, USDOE – <strong>IAEA</strong> – Russian Federation – Romania,<br />

dedicated to return of S-36 S 36 spent fuel to Russia, the implementation of this<br />

arrangement is underway <strong>and</strong> it is expected that the shipment can be completed in<br />

2009-2010. 2009 2010.<br />

The future of spent fuel EK-10 EK 10 is not defined yet <strong>and</strong> this is a milestone for the DP<br />

approval.<br />

To date it is not clear whether the high level waste from SNF reprocessing reprocessing<br />

will be<br />

returned to Romania for storage or disposal.<br />

Sydney, 13.11.2007<br />

Technical Meeting on R2D2P Workshop on<br />

Transition Phase<br />