04.05.2013 Views

Scaffolding Runway System Handbook - Niko Ltd

Scaffolding Runway System Handbook - Niko Ltd

Scaffolding Runway System Handbook - Niko Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- 10 -<br />

<strong>Niko</strong> <strong>Ltd</strong><br />

T. +44 (0) 1926 813111<br />

F. +44 (0) 1926 815599<br />

E-mail. Sales@niko-ltd.co.uk<br />

Web. www.niko-ltd.co.uk<br />

3.3.2 Calculate the maximum support centre distance, based upon the SWL<br />

using the graph below. 1m, 1.5m or 3m support centres work best with<br />

standard track lengths.<br />

3.3.3 Weight should be considered for handling and installation purposes.<br />

<strong>Niko</strong> Profile Track Weight / mtr <strong>System</strong> Weight /mtr *<br />

24.000 3.8kg 5kg<br />

25.000 6.3kg 8kg<br />

26.000 10kg 14kg<br />

27.000 18.4kg 24kg<br />

* Based on 3m track lengths and 1.5m support centres

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!