This document is intended as a<br />

means for sharing information<br />

about the process adopted by the<br />

Lesotho Highlands Development<br />

Authority (LHDA) for developing<br />

a policy for the release of water<br />

into downstream river courses<br />

(referred to as instream flow<br />

requirements (IFR)) for the Phase<br />

1 dams of the Lesotho Highlands<br />

Water Project in Lesotho.<br />

It also informs readers as to how<br />

they may participate in the public<br />

consultation process for the<br />

development of the policy.<br />

This document:<br />

❏ Explains the context for and<br />

need for an IFR policy<br />

❏ Gives a brief introduction to the<br />

theory behind IFR and the way in<br />

which scientists go about instream<br />

flow assessments (IFA) and<br />

❏ Indicates where readers may<br />

obtain further information and how<br />

they may participate in the<br />

process.<br />

LESOTHO HIGHLANDS WATER PROJECT<br />

Development of a Policy for Instream Flow Requirements<br />

PURPOSE OF THIS<br />

<strong>DOCUMENT</strong><br />

Senqunyane<br />

<strong>INFORMATION</strong> <strong>DOCUMENT</strong><br />

Republic of South Africa<br />

Republic of South Africa<br />

Senqu<br />

KINGDOM OF LESOTHO<br />

Senqu<br />

Malibamatso<br />

MASERU<br />

Mohale's Hoek<br />

IFR 6 @ Seaka Bridge<br />

IFR 7 @ Marakabei<br />

IFR 8 @ u/s Senqu confluence<br />

Quthing<br />

Matsoku<br />

Butha Butha<br />

IFR 2 @ Katse<br />

Thaba Tseka<br />

IFR 1 @ Seshote<br />

IFR 5 @ Whitehills<br />

IFR 3 @ Paray<br />

IFR 4 @ Sehonghong<br />

Qacha's Nek<br />

IFR Sites<br />

IFR "Super Sites"<br />

North<br />

0 20 40<br />

Kilometres<br />

Republic of South Africa<br />

KEY<br />

LHWP Dams (extant and planned)<br />

Border with RSA<br />

The Lesotho Highlands Water Project (LHWP) was established by Treaty between<br />

the Governments of Lesotho and South Africa in 1986. The purpose of this joint<br />

undertaking was to transfer water from the highlands of Lesotho to the Vaal River<br />

catchment, to augment water supplies to South Africa and to generate hydropower<br />

for Lesotho.<br />

The LHWP, one of the most ambitious water transfer schemes in the world,<br />

was designed to be developed in four phases. If developed in full, the Project<br />

would comprise 5 large dams in the upper catchments of the Orange River system,<br />

with all the project infrastructure, except for part of the transfer tunnels and<br />

discharge facilities, being located in Lesotho.<br />

To date, the implementation of Phase 1 has been virtually completed. Phase<br />

1A, comprising the largest of the dams, Katse on the Malibamats’o River, the<br />

transfer tunnels to RSA, Muela tail pond and the Muela Hydropower Station, was<br />

commissioned in 1998. Phase 1B is due for completion during 2003, with the<br />

inundation of Mohale Dam scheduled to commence in October 2002. Phase 1B<br />

consists of Mohale Dam on the Senqunyane River, Matsoku Weir on the Matsoku<br />

River, and transfer tunnels from Mohale and Matsoku to Katse Dam.<br />

The original demand predictions indicated that Phase 2 development would<br />

follow immediately on completion of Phase 1. However, circumstances, including<br />

a slower rate of growth in demand in South Africa, have conspired to result in the<br />

certain delay of Phase 2. Thus, the process for developing a policy for the release<br />

of water into downstream river courses (referred to as instream flow requirements<br />

(IFR)) concerns only Phase 1.<br />

Rivers<br />

1


❏ Treaty commitments to<br />

environmental management,<br />

maintaining livelihoods and<br />

compensating for losses<br />

❏ The need for a scientific<br />

approach to and policy for<br />

managing releases and<br />

downstream impacts<br />

❏ Lesotho seeks to comply with<br />

the Treaty and protect the interests<br />

of its people<br />

❏ South Africa seeks to comply<br />

with the Treaty and South African<br />

water law<br />

❏ An IFR policy will ensure some<br />

water is reserved for ecosystems<br />

and communities downstream of<br />

control structures<br />

❏ The IFR policy will ensure that<br />

reserved water is made available<br />

to the ecosystem and communities<br />

at appropriate times<br />

❏ The IFR policy will outline<br />

standards or indicators for the<br />

management of the target river<br />

health.<br />

MOTIVATING<br />

FACTORS<br />

Why Do We Need an IFR Policy?<br />

Water Releases: Design and Practice<br />

When the LHWP was designed in the 1970s and 1980s, awareness of environmental<br />

issues in general, and downstream environmental and social impacts of large dams<br />

in particular, was much lower than it is today. Nevertheless, environmental issues<br />

were embedded in the Treaty (see Box below) and the relevant Treaty articles were<br />

given effect through the implementation of Environmental Action Plans (EAPs)<br />

for both Phases 1A and 1B. The difference between 1A and 1B was that Phase 1B<br />

environmental and socio-economic baseline studies were done in advance of<br />

construction/implementation in the case of Mohale Dam, whereas the Phase 1A<br />

baseline studies were being conducted while construction of the Project was already<br />

underway. Thus, the Phase 1B EAP benefited from lessons learnt in implementing<br />

Phase 1A.<br />

The Phase 1 EAPs have, to date, applied only to the dam basins and upstream<br />

catchment areas. It was the Phase 1B environmental impact assessment report in<br />

1994 that identified the need for an instream flow assessment, to investigate<br />

environmental and social impacts downstream of both dams and to design measures<br />

to mitigate them or compensate for them.<br />

As far as management of the downstream environment goes, operation of dam<br />

releases under the Treaty articles (see box below) is the only operational mode<br />

currently approved by Project authorities. The Treaty specified compensation flows<br />

amounting to between 2% and 3% of Mean Annual Runoff (MAR). The Project<br />

was designed and, for the most part, constructed, on the basis of the intended<br />

transfer of approximately 93% of the water yield (MAR) from the rivers above<br />

the LHWP structures. From 1996-2001, releases or flows from Katse were<br />

substantially in excess of these parameters—averaging 32% of MAR, with a low<br />

of 4,2% MAR in 1999 and a high of 61,6% MAR in 2001 (see box below).<br />

Currently, to protect the river until an IFR Policy is in place, Katse Dam and<br />

the Matsoku weir are being operated to release 750 litres per second (l/s) and 600<br />

l/s, respectively.<br />

Other than control of releases, to date no downstream management or mitigation<br />

measures have been undertaken, except for the regular monitoring of water quality<br />

in downstream rivers.<br />

1996 64.0%<br />

1997 30.5%<br />

Katse Releases (% MAR)<br />

1998 27.4%<br />

1999 4.2%<br />

LHWP TREATY ENVIRONMENTAL AND SOCIAL COMMITMENTS<br />

2000 6.5%<br />

2001 61.6%<br />

Environmental considerations were incorporated into the Project from the beginning, notably as legally binding articles in<br />

the Treaty. The main provision for environmental matters in the Treaty (embodied in Article 15) states:<br />

“The Parties agree to take all reasonable measures to ensure that the implementation, operation and maintenance of<br />

the Project are compatible with the protection of the existing quality of the environment and, in particular, shall pay due<br />

regard to the maintenance of the welfare of persons and communities immediately affected by the project”.<br />

Furthermore, Article 7(18) of the Treaty enjoins the Lesotho Highlands Development Authority (LHDA, the body set up<br />

to implement the Project and be responsible for its operation and maintenance), to:<br />

“effect all measures to ensure that members of the local communities in the Kingdom of Lesotho, who will be affected<br />

by flooding, construction works or similar project-related causes, will be able to maintain a standard of living not inferior to<br />

that obtaining at the time of first disturbance, provided that such Authority shall effect compensation for any loss to such<br />

member as a result of such project-related causes not adequately met by such measures”.<br />

The Treaty, in recognition of downstream needs, specified Phase 1 downstream flows (the “Treaty Minimum Releases”)<br />

of not less than 500 l/s and 300 l/s from Katse and Mohale dams, respectively. It made no mention of the Matsoku weir.<br />

2


PUBLIC DISCLOSURE<br />

AND INVOLVEMENT<br />

Public disclosure and input into<br />

policy development is the policy<br />

of the LHDA and a World Bank<br />

requirement. It involves the use of<br />

two-way communication:<br />

❏ May-June 2002: a pilot<br />

consultation process was<br />

conducted, in 16 potentially<br />

affected villages downstream of<br />

Phase 1 structures in a 5 km wide<br />

corridor each side of the river<br />

❏ May-August: meetings with the<br />

Principal Chiefs of Lesotho are an<br />

important matter of protocol<br />

❏ June-August: extension of this<br />

process to all downstream villages<br />

in potentially significantly affected<br />

river reaches in a 5 km wide<br />

corridor each side of the river (IFR<br />

Sites 1, 2, 3 and 7)<br />

❏ Public disclosure: this document<br />

represents the first step in a<br />

process which will inform the<br />

broader interested and/or affected<br />

community about the IFR policy<br />

❏ Public consultation: the posting<br />

of the Draft IFR Policy on websites<br />

and in libraries, in early August<br />

2002 for 30 days, for the purposes<br />

of public comment<br />

❏ Public notification: the posting<br />

of the final IFR Policy and a<br />

Response Report, to notify<br />

stakeholders of the final Policy and<br />

to explain how LHDA has<br />

responded to concerns.<br />

What is an Instream Flow<br />

Requirements Policy?<br />

Instream flow requirements (IFR) refer to the amount, quality and timing of water<br />

released through or over dams and associated structures to meet riverine ecosystem<br />

and social needs in the reaches downstream of dams. The objective is to mitigate<br />

the impacts of such structures on the downstream environment and people.<br />

Downstream affected people have to be consulted about the potential impacts of<br />

the project on their livelihoods and compensated for any losses, in such a way as<br />

to restore those livelihoods.<br />

The approach adopted by LHDA, and endorsed by the Lesotho Highlands<br />

Water Commission and the World Bank, was to focus on the obligations contained<br />

in the Treaty and in the World Bank Loan Agreement to mitigate the adverse effects<br />

of the dam on the downstream environment and people.<br />

The IFR Policy will emphasize the establishment of a pattern of target water<br />

releases—base flows and floods, in wet, average and dry years—that will ensure<br />

that adverse impacts on the downstream environment do not exceed agreed levels<br />

of river health conditions.<br />

In contrast to the impact evaluations undertaken for areas upstream of the<br />

LHWP dams, which typically dealt with largely significant impacts on a relatively<br />

small number of people (a few hundred), downstream evaluation has had to deal<br />

with relatively small impacts on a large number of people (tens of thousands) in<br />

an area that had not previously been studied.<br />

This approach - managing the river rather than managing the dam – makes the<br />

ecological health of the river and the welfare of downstream communities key<br />

elements in decisions regarding the allocation and use of water. It also paves the<br />

way for establishing a firm basis for determining losses of and compensation for<br />

downstream aquatic and riparian resources.<br />

It will lead to an IFR policy that covers the geographic scope of the policy’s<br />

interventions, a monthly release schedule that specifies base flows and flood<br />

releases for wet, normal and dry years, dam operating procedures, monitoring, the<br />

principles of the social mitigation and compensation process, record keeping,<br />

audits, disclosure and consultation and the budget commitments required to operate<br />

the policy.<br />

Senqunyane River. (Photo: George van der Merwe)<br />

3


It is important to note that, given the<br />

scientific state of the art regarding<br />

environmental flow requirement studies<br />

and the forecasting of potential impacts,<br />

the results of the studies should be<br />

interpreted as providing guidance to<br />

inform the formulation of a policy and<br />

not as exact predictions of what may<br />

happen.<br />

Uncertain future rainfall patterns, the<br />

specific way in which the river ecology<br />

may respond to changed hydrological<br />

and hydraulic conditions, and the<br />

adaptation strategies of the downstream<br />

riparian plants and animals, will all<br />

interact to create a new ecology and,<br />

potentially, new socio-economic<br />

patterns.<br />

This is why it is important to design a<br />

policy that is adaptable to the emerging<br />

reality on the ground and to monitor<br />

the environmental and social conditions<br />

as they evolve, in order to do the<br />

maximum to ensure river health and the<br />

livelihoods of the affected people.<br />

The Outcome<br />

The culmination of all these studies<br />

will be the formulation and approval<br />

by the Project Authorities of an IFR<br />

Policy, which will<br />

❏ commit the LHDA to a target<br />

release regime from each of Phase<br />

1’s dams, namely, Katse and Mohale<br />

Dams and Matsoku Weir;<br />

❏ commit the LHDA to specified<br />

principles of mitigation of impacts<br />

and compensation for losses;<br />

❏ establish the basis for the<br />

assessment of environmental and<br />

social losses and procedures for<br />

claiming compensation;<br />

❏ set out the details of a monitoring<br />

program which will support the<br />

release regime, compensation and<br />

mitigation policy; and<br />

❏ establish a regular program to<br />

review the policy in the light of the<br />

results of the monitoring studies.<br />

IFR STUDIES undertaken<br />

by LHDA<br />

Contracts 648 and 678<br />

The decision to appoint a consultant to undertake a thorough assessment of<br />

downstream impacts was taken during 1996. Metsi Consultants, a joint venture<br />

of SMEC International of Australia and Southern Waters Ecological Research and<br />

Consulting of South Africa, was contracted to undertake IFR studies of the Project<br />

under LHDA.<br />

Contract 648, conducted between 1997 and 2000, produced 22 separate reports.<br />

The terms of reference for the study required consideration of the combined effects<br />

of Phases 1 and 2. The study area included the Malibamats’o River downstream<br />

of Katse, the Matsoku River (tributary of the Malibamats’o) downstream of Matsoku<br />

Weir, the Senqunyane River downstream of Mohale, to their respective confluences<br />

with the Senqu River, and the middle and lower reaches of the Senqu River, to the<br />

border with South Africa. The study involved a wide range of specialists, from<br />

physical and biological scientists to human and animal health and socio-economic<br />

specialists.<br />

When it became clear that a significant delay in the implementation of Phase<br />

2 was probable, Metsi Consultants was asked to assess the situation without the<br />

effects of Phase 2. This exercise was undertaken as LHDA Contract 678, the final<br />

reports of which have recently been completed. These studies have analyzed the<br />

downstream rivers’ responses to reduced flows and have predicted a range of<br />

impacts, the overall trends of which are shown in boxes on succeeding pages.<br />

Upstream of Katse Dam. (Photo: George van der Merwe)<br />

4


Instream Flow Requirements: Theory and Practice<br />

The analysis of environmental flow requirements is based on the premise that river flow is the primary determinant of a number<br />

of physical and biological parameters in aquatic and riparian ecosystems. A crucial relationship exists between river flow or<br />

discharge (analyzed as a number of components, notably base flows and floods), hydraulics and geomorphology. The volume<br />

of flow determines the depth and size of the river and a number of ecological processes are linked to this.<br />

An IFR is a description of a modified flow regime, invariably due to the presence of a control structure in the river, such as a<br />

dam or weir, that is linked to a description of the condition or health of the river that this flow might be expected to produce.<br />

Furthermore, because the characteristics of a river change as one moves downstream, flow-ecology relationships change too.<br />

One must, therefore, establish different relationships for each affected river reach. Thus, IFR studies focus their analyses on<br />

carefully selected IFR Sites, representative of particular river reaches (the LHWP IFR Phase 1 Sites are shown in the map on<br />

<strong>Page</strong> 1).<br />

In Southern Africa, the Building Block Methodology (BBM) has been developed and used for the assessment of IFRs. The BBM<br />

requires that a desired future state of the river be identified first; then the scientists<br />

construct the seasonal flow regime, comprising base flows, small and large floods,<br />

required to maintain that desired state. In the case of the LHWP, the in-stream<br />

flow assessment (IFA) was needed to assist in determining a desired future state,<br />

not the other way round, so a different approach was developed. This Downstream<br />

Response to Imposed Flow Transformations (DRIFT) methodology allows the<br />

biophysical and socio-economic consequences of flow changes to be determined<br />

for a number of potential future flow regimes. That is, it is a scenario-based approach.<br />

A Caveat. It is important to bear this in mind when reading the findings of these<br />

studies, that the findings are based on a specific set of conditions defined as<br />

the scenario and not on actual conditions. The findings are, thus, all predictions<br />

and are only as good as the primary information or databases that support them.<br />

For instance, the assessment of changes in riparian vegetation patterns requires<br />

a detailed knowledge of the auto-ecology of individual species, but such data<br />

are not available for the Highlands environment and species specifically, although<br />

experience in other systems will be applicable to some extent. The results of<br />

these studies must, therefore, be interpreted with caution; they must not be viewed<br />

as fact, but rather as the best predictions currently available. Careful monitoring<br />

of the system, after implementation of the IFR Policy, will be essential to establish<br />

the actual system responses, to establish actual losses to resource users and to<br />

permit adaptation as necessary.<br />

The LHWP IFR analysis proceeded on the basis of eight IFR sites in the four rivers<br />

of interest (see Map). Detailed, holistic field characterizations of each site field<br />

were undertaken over a 12-month period to establish a baseline, although a preproject<br />

baseline for the Malibamats’o River could not be established, due to the<br />

presence of Katse Dam. The DRIFT methodology was then used to predict the<br />

effects on different biophysical system components. Four modified flow regimes<br />

were hypothesized, based on design and operational constraints and the nature of<br />

the rivers. Finally, the consequences of the predicted biophysical changes on the<br />

human Population at Risk were analyzed and the costs of potential resource losses<br />

were calculated.<br />

Bringing all the<br />

elements together<br />

The final phase of policy development<br />

will be to assess the trade-offs between<br />

river health, communities and the<br />

implications of different release options<br />

in terms of lost benefits to the two<br />

countries – all within the context of the<br />

Treaty requirement that the project<br />

should “pay due regard to the<br />

maintenance of the welfare of persons<br />

and communities”, and “take all<br />

reasonable measures to ensure…the<br />

protection of the existing quality of the<br />

environment”. If a purely financial<br />

approach were to be taken, the project<br />

would maximize revenue at the expense<br />

of the downstream environment and<br />

communities; if a purely environmental<br />

approach were to be taken, the project<br />

would release as much water as was<br />

necessary to protect the environment<br />

and communities at a high cost in terms<br />

of lost revenue. The policy development<br />

process seeks an intermediate position<br />

that will represent a fair and reasonable<br />

balance between the two extreme<br />

positions.<br />

5


YOUR INVOLVEMENT<br />

Your involvement is very important<br />

to us. While at this stage we seek<br />

to inform, not to solicit comment,<br />

we urge you to submit comments<br />

on the Draft IFR Policy when it is<br />

released.<br />

Details about the venues where<br />

documentation is available, and<br />

where the Draft IFR Policy will<br />

be posted are provided on the<br />

next page.<br />

WHO TO CONTACT<br />

ABOUT THIS PROJECT<br />

Should you wish to submit<br />

comments, please do so to the<br />

following email address<br />

lhwp@lhda.org.ls<br />

Or by fax to +266 325775,<br />

for the attention of<br />

Mr R Maphetla<br />

Chief Executive Officer<br />

LHDA<br />

PO Box 7332<br />

Maseru 100<br />

Lesotho<br />

Should you wish to discuss<br />

anything relating to the IFR policy<br />

process, or to obtain further<br />

information, do not hesitate to<br />

contact the following persons at<br />

LHDA:<br />

Ms. M. Mothepu<br />

Deputy General Manager ESSG<br />

Phone:<br />

+266 835 0825<br />

+266 85 0679 (Cell phone)<br />

Mr. Taole Tesele<br />

IFR Co-ordinator<br />

Phone:<br />

+266 835 0731<br />

+266 85 2143 (Cell phone)<br />

Description of the<br />

Lesotho Highlands<br />

Lesotho is a land-locked country 30 355km 2 in extent. The eastern two-thirds,<br />

called the Highlands, are formed by the rugged Drakensberg and Maloti ranges,<br />

which form a high, dissected plateau with an average elevation of about 2 500<br />

metres above sea level (masl). The narrow river valleys are steep-sided; the<br />

landscape is one of deeply incised valleys and peaks. The Senqu (Orange) River<br />

drains the eastern and southern sectors and has several large tributaries, including<br />

the Malibamats’o, Senqunyane and Matsoku rivers, which are the locations for<br />

LHWP structures (see map).<br />

Highland catchments are characterised by high rainfall, temperate summers<br />

and long, cold winters, and they have high water yields due to rapid runoff from<br />

the steep slopes. Rainfall occurs predominantly as thunderstorms of high intensity<br />

and short duration. The nature of the rainfall and the rapid movement of water off<br />

the steep slopes and thin soil results in a quick drainage reaction time. Highly<br />

variable, but distinct wet, dry and transitional seasons are identifiable from<br />

hydrological records. The wet/rainy season extends from December to March,<br />

while the dry season usually extends from June through September.<br />

Grasslands and shrublands dominate highland vegetation; wetlands occur in<br />

all drainage lines. Vegetation zones along rivers typically have a higher biodiversity<br />

than elsewhere and a higher proportion of woody vegetation, both indigenous and<br />

exotic species. The wild animal communities of Lesotho are distinctive, with<br />

several endemic species, but wildlife densities are very low due to heavy, uncontrolled<br />

exploitation.<br />

The human population along the rivers downstream of the LHWP structures<br />

within Lesotho live in small villages, with a small proportion living in larger<br />

settlements such as Marakabei. It has been estimated that some 8 300 households<br />

in a 5km corridor on each side of the downstream rivers may be significantly<br />

affected by Phase 1 of the LHWP. While foreign employment in South Africa<br />

represents an important, although declining, source of income, rural people are<br />

heavily dependent on local resources for their livelihood. Agriculture is an important<br />

source of livelihood, but agricultural plots are constrained in size by topography<br />

and soil depths. Relatively more and better land is available along the Matsoku<br />

and upper Senqunyane Rivers than along the deeply incised Malibamats’o and<br />

upper Senqu rivers. The nutrition status of local people, especially children, is low,<br />

even by Lesotho rural standards, and there is a high incidence of childhood<br />

infectious diseases as well as water-related diseases. Livestock are abundant in<br />

the area (estimated populations of 68 000 catttle, 78 000 sheep, 131 000 goats and<br />

24 000 horses and donkeys).<br />

IFR Study Scenarios<br />

Minimum Degradation Scenario<br />

This scenario was developed as a hypothetical condition, in which maintenance<br />

of the rivers in a state of minimal degradation from their current condition was the<br />

main objective and only thereafter would water delivery needs be catered for (ie<br />

transferred to SA). It assumed that 60-65% of Mean Annual Runoff would be<br />

released to downstream ecosystems. This scenario allowed specialists to consider<br />

interactively baseline conditions relative to flow levels and to establish the flows<br />

below which significant ecological and physical changes could be anticipated. It<br />

should be noted that this scenario is not technically achievable due to design<br />

constraints on the structures<br />

6


WHERE TO GET<br />

MORE <strong>INFORMATION</strong><br />

The 3 key reports:<br />

❏ Metsi Consultants (2002) Report<br />

678-F-001, Summary of Main<br />

Findings for Phase 1 Development<br />

❏ Metsi Consultants (2002) Report<br />

678-F-002, Additional Scenarios and<br />

Production of a New Final Report<br />

(Vol. II)<br />

❏ S. Klasen (2002) The Costs and<br />

Benefits of Changing Instream Flow<br />

Requirements<br />

are available on the following<br />

websites:<br />

❏ www.lhwp.org.ls.<br />

❏ www.lesotho.gov.ls<br />

❏ www.dwaf.gov.za<br />

❏ www.sametsi.com<br />

Hard copies of these reports are<br />

lodged for public inspection at<br />

the following venues:<br />

❏ LHDA Library, 3rd Floor, Post<br />

Office Building, Kingsway, Maseru,<br />

Lesotho<br />

❏ National Environmental<br />

Secretariat Library, Post Office<br />

Building, Maseru<br />

❏ National University of Lesotho<br />

Library, Roma, Lesotho<br />

❏ <strong>DWA</strong>F Library, 3rd Floor Sedibeng<br />

Bldg, Schoeman St, Pretoria<br />

❏ World Bank office, Pro-Equity<br />

Court, 1250 Pretorius Street,<br />

Pretoria<br />

❏ University of Cape Town Library,<br />

Rondebosch, Cape Town<br />

❏ Public Information Center, World<br />

Bank, 1818 H Street NW,<br />

Washington, DC<br />

Should you wish to read further,<br />

a full set of Metsi Consultants<br />

Contract 648 reports are lodged<br />

at:<br />

❏ LHDA Library, 3rd Floor, Post<br />

Office Building, Kingsway, Maseru,<br />

Lesotho<br />

❏ <strong>DWA</strong>F Library, 3rd Floor,<br />

Sedibeng Bldg, Schoeman St,<br />

Pretoria, South Africa<br />

❏ National University of Lesotho<br />

Library, Roma, Lesotho<br />

Treaty Minimum Release Scenario<br />

This is the scenario generated by application of the minimum release conditions<br />

specified in the Treaty and is at the opposite end of the range from Minimum<br />

Degradation in terms of water requirements. Conceptually, the scenario differs<br />

from that above in that the volumes of delivery water are first specified and<br />

consequential river conditions then assessed.<br />

Design Limitation Scenario<br />

This is a scenario based on the practical limitations of flow releases imposed by<br />

the designs of the Phase 1 structures. In terms of volumes of water releases, it is<br />

between the above two scenarios.<br />

Fourth (Intermediate) Scenario<br />

This scenario was selected to fall between the Treaty Minimum and Design<br />

Limitation scenarios and to provide a reference point between the former (legally<br />

defined and highest water delivery, but most severe environmental and socioeconomic<br />

impacts) and the latter (possible within engineering constraints, but<br />

likely to have high impacts on water and revenues).<br />

Summary of Findings<br />

Hydrological changes<br />

The Table below gives a global picture of the hydrological changes that are predicted<br />

to occur under each of the four scenarios. It is from the changes in the river<br />

hydrology or flow regime that all other predicted changes are derived. This overview<br />

presents the overall amount of water available to downstream ecosystems on an<br />

annual basis, as a proportion of mean annual runoff (MAR), this being an estimate<br />

of the average amount of water draining from the catchment in a year.<br />

Table 1: Historical MAR, the annual volume allocated to the river and the percentage of<br />

historical MAR that this represents, under each of the four scenarios at each IFR site for<br />

LHWP Phase 1 development. Shaded sites represent reaches immediately downstream of<br />

the dams in Phase 1a and 1b<br />

IFR<br />

Site<br />

Historical<br />

MAR<br />

Minimum<br />

Degradation<br />

Scenario<br />

MCM a -l MCM a -l %MAR MCM a -l %MAR MCM a -l %MAR MCM a -l %MAR<br />

1 87 51 59 35 40 35 40 31 36<br />

2 554 366 66 22 4 184 33 97 18<br />

3 774 436 56 128 17 315 41 227 29<br />

4 1572 866 55 831 53 831 53 831 53<br />

5 1924 1194 62<br />

6 3330 2171 65<br />

Treaty<br />

Minimum<br />

Scenario<br />

Design<br />

Limitation<br />

Scenario<br />

Fourth<br />

Scenario<br />

Flows sufficient for Minimum Degradation<br />

7 355 231 65 48 13 126 35 77 22<br />

8 592 397 67 158 27 254 43 195 33<br />

Site 1 = Matsoku R, immediately downstream of Matsoku Weir (30km)<br />

Site 2 = Malibamats’o R, immediately downstream of Katse Dam (20km)<br />

Site 7 = Senqunyane R immediately downstream of Mohale Dam (90km)<br />

Site 3 = Malibamats’o R at Paray, downstream of confluence with Matsoku R (35km)<br />

Site 4 = Senqu R at Sehonghong, representing Senqu between confluences of Malibamats’o and<br />

Tsoelike rivers (125km)<br />

Site 5 = Senqu R at Whitehills, between confluences of Tsoelike and Senqunyane rivers (85km)<br />

Site 6 = Senqu R at Seaka Bridge, from confluence with Senqunyane to South African border (140km)<br />

Site 8 = Senqunyane R upstream of the confluence with the Senqu R, from confluence with Lesobeng<br />

R to the confluence with the Senqu R (40km).<br />

7


PREDICTED IMPACTS<br />

Vegetation (See also Resource Impacts)<br />

❏ Narrower vegetation zones along<br />

rivers<br />

❏ Many riparian species will be less<br />

abundant<br />

❏ Algal blooms will be more frequent<br />

❏ Some species will increase<br />

Aquatic animals<br />

❏ Increases in algal feeding invertebrate<br />

community<br />

❏ Increases in tolerant filter feeding<br />

invertebrate communities; decreases in<br />

sensitive species<br />

❏ Increases in some Simulium,<br />

(significant as stock disease vectors)<br />

❏ Increases in midges<br />

❏ Possible introduction of disease<br />

carrying snails, Planorbidae and<br />

Physidea<br />

❏ Decline of some fish species: trout,<br />

yellowfish<br />

❏ Likely extinction of the Maloti<br />

minnow in some river reaches<br />

Resource impacts<br />

❏ Decreases in shrubs and trees used<br />

for fuel and construction<br />

❏ Decrease in some medicinal plant<br />

species<br />

❏ Decrease in availability and size of<br />

fish<br />

❏ Decrease in availability of river sand<br />

❏ Decreases in availability of wild<br />

edible vegetation<br />

❏ Increase in the availability of reeds<br />

and thatching grass<br />

Socio-economic impacts<br />

❏ Immediately downstream of Katse<br />

and Mohale dams, social impacts may<br />

be critically severe under the Treaty<br />

scenario, due to resource depletion<br />

❏ Social impacts are low, however, for<br />

all sites located two or more reaches<br />

away from the structures<br />

❏ The baseline health status of the<br />

population at risk is relatively poor ;<br />

the Treaty and Fourth scenarios increase<br />

the risks of infection from moderate to<br />

severe for diarrhoeal and skin and eye<br />

diseases.<br />

Summary of findings (continued)<br />

The main significance of hydrological changes will be as follows:<br />

Low flows will be lower, both wet and dry season low flows. Low flows are<br />

important for creating different conditions in different seasons, dictating the<br />

occurrence or emergence and population densities of various species at different<br />

times of the year.<br />

Small floods will be smaller and less frequent in occurrence. They stimulate<br />

spawning in fish, flush out poor quality water, cleanse the riverbed and sort river<br />

stones by size, thereby creating different habitats. They trigger and synchronize<br />

activities as varied as upstream migrations of fish and germination of seedlings<br />

on river banks.<br />

Large floods will be almost eliminated, except for very wet periods when the dams<br />

may overtop. Large floods provide scouring flows that shape the river channel;<br />

they also trigger some of the same responses as small floods. They move and<br />

cleanse cobbles and boulders on the riverbed and deposit silt, nutrients, eggs and<br />

seeds on floodplains; they inundate backwaters, secondary channels and floodplains,<br />

recharge soil moisture levels in the banks and trigger bursts of growth in many<br />

species.<br />

Flow variability will be reduced, in daily, seasonal and annual cycles. Variability<br />

acts as a form of natural disturbance, which effectively creates temporal and spatial<br />

habitat mosaics, of areas inundated and exposed for different periods of time. The<br />

greater the habitat diversity, the greater the species diversity and the greater is<br />

ecosystem stability and resilience against unnatural perturbations.<br />

Overall Impact Rating<br />

The overall significance of the potential biophysical changes flowing from these<br />

hydrological changes was rated by Metsi for each IFR site, under each scenario,<br />

as shown in Table 2.<br />

Table 2: Reach-specific summary of the predicted combined biophysical consequences for<br />

each scenario with Phase 1 dams in place. The levels of impacts are coded as follows:<br />

white – negligible; green – low; yellow – moderate; blue – severe; red – critically severe.<br />

1<br />

2<br />

7<br />

3<br />

4<br />

5<br />

6<br />

8<br />

Reach<br />

Proximal to<br />

dam or weir<br />

Distant from<br />

dam or weir<br />

Minimum<br />

Degrradation<br />

M<br />

M<br />

L<br />

L<br />

L<br />

N<br />

N<br />

N<br />

Design<br />

Limitation<br />

** Site 1 is below Matsoku Weir, and attracts Severe and Critically Severe ratings, despite the relatively<br />

high proportion of MAR (40%) still flowing down the river, due to the extinction in the Matsoku River<br />

of the Maloti minnow. LHDA is establishing a program to protect the minnow in other Lesotho rivers.<br />

Summary Findings<br />

❏ Sites proximal to dam structures have the potential to be severely impacted<br />

under all realistic scenarios (the exception is the Minimum Degradation scenario),<br />

largely on the basis of physical in-stream habitat changes and losses of aquatic<br />

biota.<br />

❏ Consequential changes in riparian biota and resources are much less certain<br />

(see Predicted Impacts), as are changes in human and animal health vectors and<br />

agents.<br />

S**<br />

S<br />

S<br />

M<br />

L<br />

L<br />

N<br />

L<br />

Fourth<br />

S**<br />

S<br />

S<br />

M<br />

L<br />

L<br />

L<br />

L<br />

Treaty<br />

S**<br />

CS<br />

S<br />

S<br />

M<br />

L<br />

L<br />

M<br />

8


RECORDED IMPACTS<br />

Metsi Consultants did their baseline study<br />

field work during 1999, when Katse Dam<br />

was being operated at close to Treaty<br />

minimum releases, so the results gave a<br />

good indication of the kinds of conditions<br />

which might prevail under the Treaty<br />

scenario:<br />

❏ The state of both the instream and<br />

riparian habitat (“habitat integrity”) at site<br />

2 (below Katse) was rated to be less than<br />

50% (of the ‘pristine’ condition). Other<br />

sites – not affected by a dam – got scores<br />

of between 80% and 95%.<br />

❏ Water quality at site 2 was poor, there<br />

were abundant algae in the water<br />

(mountain rivers usually flow clean) and<br />

very few fish.<br />

Monitoring downstream of Katse Dam<br />

(IFR sites 2 and 3) in summer 2000/01<br />

and summer 2001/02 has shown<br />

❏ A reduction in instream river health<br />

indicators at site 2, much less so at site 3,<br />

largely due to the absence at site 2 of<br />

sensitive groups of macro- invertebrates<br />

(only tolerant groups were recorded)<br />

❏ A lack of clear geomorphologic trends<br />

(an important prediction of the IFR studies<br />

was major changes in river<br />

geomorphology), although sedimentation<br />

in some pools was observed;<br />

❏ Woody plant species have increased in<br />

number and distribution, having colonised<br />

boulder beds and sandbars, which would<br />

previously have been often covered with<br />

water. This appears to contradict the study<br />

findings, but it does not mean that the<br />

pattern will not change in the long term.<br />

❏ During summer 2002, however, river<br />

flow was very high and fish were reported<br />

to be abundant below Katse Dam.<br />

Metsi’s pilot community surveys,<br />

conducted in April and May 2002, show<br />

some communities already suffering fuel<br />

wood shortages that are not due to the<br />

project, that is, fuel wood resources are<br />

already depleted in some areas.<br />

They also report on the experience of<br />

communities regarding both reduced flows<br />

and flood conditions. Reduced flows allow<br />

their stock to cross the river, where<br />

previously they couldn’t, and encroach<br />

into other villages’ grazing lands. High<br />

flows, on the other hand, wash away trees<br />

planted by individuals.<br />

The Economics of IFRS<br />

Losses To Downstream Communities<br />

❏ The IFR study finds sizeable economic losses (in terms of use values and<br />

necessary compensation costs) to downstream communities ranging from a total<br />

of M2,9 million to M8 million annually depending on the IFR scenario chosen.<br />

It should be kept in mind, however, that the figures are estimates only, based on<br />

certain biophysical predictions, and are primarily for the purposes of scenario<br />

comparison.<br />

❏ The IFR study also finds that small increases in releases will only have a modest<br />

impact on these losses, although there are differences between the various resources<br />

and sites. Only considerable increases in IFR releases will succeed in sharply<br />

reducing the losses to downstream communities. Even in the Minimum Degradation<br />

Scenario, downstream communities do face losses for which, according to Treaty<br />

rules, they should be entitled to compensation of some form.<br />

❏ A recent pilot consultation process amongst downstream communities revealed<br />

very realistic and clear preferences for mitigation and compensation amongst<br />

potentially affected communities, from programs of assistance to replace lost<br />

resources, to flow releases, to assistance with broader development needs as<br />

mitigation for losses which would be difficult to replace directly.<br />

Revenue and Other Losses<br />

❏ While increasing IFR releases for Lesotho would reduce downstream losses,<br />

Lesotho would also lose variable water royalties and hydropower revenues, which<br />

would have a negative impact on Lesotho’s economy as a whole. For example, if<br />

the Fourth Scenario were to be adopted, the loss to the Lesotho economy would<br />

be some M17,5 million per annum at 1999 prices, or about 6% of the total revenues<br />

from the LHWP. In addition the original objective that Muela HEP would make<br />

Lesotho self sufficient in electricity, would be compromised.<br />

❏ The Klasen study of the economic impacts of the different IFR release scenarios<br />

shows that, from an economic point of view, the economic costs to Lesotho and<br />

South Africa of increasing downstream releases beyond the Treaty minimum level<br />

always outweigh the benefits for downstream communities (and, thus, the costs<br />

of compensation for losses). This is the case from the point of view of the project,<br />

of RSA and of Lesotho.<br />

❏ In other words, the lost royalty and hydropower revenues would always be<br />

greater than the economic losses to downstream communities.<br />

❏ Notwithstanding this, the overall project benefits, over the life of this project,<br />

are so large that the viability of the project is not affected by including these<br />

downstream losses, that previously had not been considered in the economic<br />

assessment of the project.<br />

❏ While the water transfer benefits of the project would be sharply reduced under<br />

the three scenarios with releases in excess of the Treaty Minimum, as would the<br />

already low rate of return of the hydropower component, they remain sizeable<br />

enough that LHWP as a whole remains viable even if IFR releases were increased.<br />

❏ Therefore in setting the IFR policy some difficult decisions and trade-offs have<br />

to be considered, and public consultation is an essential element in this process.<br />

9


PROVISIONAL LIST<br />

OF AUTHORITIES<br />

AND IAPS<br />

NATIONAL AUTHORITIES<br />

❏ Government of Lesotho<br />

❏ Ministry of Natural Resources<br />

❏ National Environmental<br />

Secretariat<br />

❏ Ministry of Finance<br />

❏ South Africa<br />

❏ Department of Water Affairs &<br />

Forestry<br />

TRADITIONAL AUTHORITIES<br />

❏ Principal Chiefs of Lesotho (24)<br />

and their community development<br />

representatives<br />

AFFECTED COMMUNITIES<br />

❏ Some 8,300 households in 338<br />

villages in a 5-km wide corridor on<br />

either side of the affected river<br />

reaches, incorporating IFR Sites 1,<br />

2, 3 and 7.<br />

LENDERS/ DONORS<br />

❏ World Bank<br />

❏ European Investment Bank<br />

❏ Development Bank of South Africa<br />

OTHER INTERESTED PARTIES<br />

❏ Lesotho Council of NGOs<br />

❏ NGOs/civic organizations/<br />

individuals in Lesotho and South<br />

Africa<br />

❏ International NGOs<br />

Should you feel strongly that any<br />

particular organizations should be<br />

made aware of this project, please<br />

do not hesitate to contact us and<br />

give us their contact details (without<br />

their contact details we will not be<br />

able to involve them, due to the tight<br />

program).<br />

Implications for IFR Policy<br />

Mitigation by flow releases: Overall<br />

❏ The Minimum Degradation scenario was always a hypothetical option, since<br />

design limitations in the dams prevent the releases being made which might achieve<br />

it. It is not, therefore, an option that can be considered for operational purposes.<br />

It has, however, been useful as a scenario against which to compare the other<br />

scenarios.<br />

Katse Releases<br />

❏ The IFR studies show that the design limitations on Katse do not allow much<br />

flexibility of release regime and that all three possible scenarios are predicted to<br />

result in “Severe” overall ecological impacts in reaches immediately downstream<br />

of the dam (Site 2).<br />

❏ The Matsoku rating of “Severe” overall impact under all three scenarios is<br />

heavily skewed by the probable extinction of one species from this river, namely<br />

the Maloti minnow. If the Maloti minnow is taken out of the equation, then<br />

Matsoku’s 600 l/s release regime will allow the downstream ecosystem to be<br />

maintained in a reasonable condition, since it will have 40% of MAR available<br />

to it. Recognizing the importance of the species, LHDA will implement a program<br />

to establish the Maloti minnow in other Lesotho rivers.<br />

Mohale Releases<br />

❏ Because of its more flexible release structures and mechanisms, Mohale Dam<br />

holds the greater potential for manipulating releases to meet river health targets<br />

in the Senqunyane River.<br />

❏ Because there is a considerable population living downstream of the Mohale<br />

Dam, important gains in water quality and maintaining riparian vegetation - an<br />

important resource - would result from even moderately increased flows. The<br />

Mohale impacts are predicted to reduce rapidly downstream due to inflows from<br />

tributaries.<br />

Compensation<br />

❏ The degree of uncertainty in predictions/ estimates of potential losses to<br />

communities means that monitoring of socio-economic status and biophysical<br />

status of riverine ecosystems will be of paramount importance in an adaptive<br />

management system.<br />

❏ The geographic extent of measurable impacts on the Population at Risk can be<br />

limited to river reaches represented by IFR Sites 1, 2, 3 and 7. This is the area to<br />

which, it is proposed, the IFR Policy’s compensation programs will apply. Monitoring<br />

will nonetheless extend to reaches 4, 5, 6 and 8 in order to confirm the moderate<br />

or negligable levels of impact predicted for these reaches.<br />

❏ Different principles of compensation and/or mitigation are required for downstream<br />

rivers (compared with upstream of the structures) because of the different nature<br />

of the impacts. The following principles are proposed:<br />

❏ Taking account of national socio-economic trends, communities will not be<br />

worse off after Policy implementation<br />

❏ Compensation will be based on resources affected or lost, not on resources used,<br />

and will generally be directed at communities, not at individuals;<br />

❏ Compensation will be for demonstrated losses, and both direct compensation<br />

(based on replacement of lost resources) and indirect compensation/ mitigation<br />

(other programs) will be considered.<br />