15.05.2013 Views

TS 134 123-2 - V10.3.0 - Universal Mobile ... - ETSI

TS 134 123-2 - V10.3.0 - Universal Mobile ... - ETSI

TS 134 123-2 - V10.3.0 - Universal Mobile ... - ETSI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3GPP <strong>TS</strong> 34.<strong>123</strong>-2 version 10.3.0 Release 10<br />

35<br />

E<strong>TS</strong>I<br />

E<strong>TS</strong>I <strong>TS</strong> <strong>134</strong> <strong>123</strong>-2 <strong>V10.3.0</strong> (2013-01)<br />

Clause Title Release Applicability Comments Number of TC Executions<br />

(informative)<br />

8.1.2.22 RRC Connection Establishment: Reject with R99 C01d UE supporting FDD and ((CS bearer 1 or 2 Executions: CS( only if<br />

Frequency Info set to the same frequency<br />

service and CS call establishment) or CS call establishment is<br />

band – Unsuccessful case<br />

PS bearer service).<br />

supported ),PS<br />

8.1.2.22a RRC Connection Establishment: Reject with R99 C481d UE supporting FDD and ((CS bearer 1 or 2 Executions: CS ( only if<br />

Frequency Info set to a different frequency<br />

service and CS call establishment) or CS call establishment is<br />

band – Unsuccessful case<br />

PS bearer service) and multiple FDD<br />

bands simultaneously.<br />

supported ),PS<br />

8.1.2.23 Void<br />

8.1.2.23a Void<br />

8.1.2.24 Void<br />

8.1.2.24a Void<br />

8.1.2.25 RRC Connection Establishment for transition Rel-9 C758 UEs supporting 1.28Mcps TDD and 1 Execution: PS<br />

from Idle Mode to CELL_FACH: Success<br />

(Start of E-DCH and HS-DSCH Reception)<br />

HS-PDSCH in CELL_FACH<br />

8.1.2.26 RRC Connection Establishment / Paging<br />

Rel-8 C90d UEs supporting FDD and PS domain 1 Execution: CS+PS<br />

Permission with Access Control: Success<br />

services and CS domain services and<br />

CS call establishment.<br />

C91 UEs supporting 3.84 Mcps TDD option<br />

or 1.28 Mcps TDD option and PS<br />

domain services and CS domain<br />

services.<br />

8.1.2.27 RRC Connection Establishment using the Rel-9 C560 UEs supporting FDD and HS-PDSCH 1 Execution: PS<br />

default configuration#23 for HS-DSCH / E-<br />

and E-DPDCH and fully supporting F-<br />

DCH signalling bearers<br />

DPCH<br />

Rel-9 C630 UEs supporting 1.28Mcps TDD and<br />

HS-PDSCH and E-PUCH<br />

8.1.3.1 RRC / RRC Connection Release in<br />

R99 C01d UEs supporting FDD and ((CS bearer 1 or 2 Executions: CS ( only if<br />

CELL_DCH state: Successful<br />

service and CS call establishment) or CS call establishment is<br />

PS bearer service).<br />

supported ), PS<br />

C02 UEs supporting 3.84 Mcps TDD option<br />

or 1.28 Mcps TDD option or 7.68 Mcps<br />

TDD option.<br />

8.1.3.2 RRC / RRC Connection Release using on R99 C01 UEs supporting FDD.<br />

DCCH in CELL_FACH state: Successful<br />

C02 UEs supporting 3.84 Mcps TDD option<br />

or 1.28 Mcps TDD option or 7.68 Mcps<br />

TDD option.<br />

8.1.3.3 RRC / RRC Connection Release using on R99 C01d UEs supporting FDD and ((CS bearer 1 or 2 Executions: CS ( only if<br />

CCCH in CELL_FACH state: Success<br />

service and CS call establishment) or CS call establishment is<br />

PS bearer service).<br />

supported ), PS<br />

C02 UEs supporting 3.84 Mcps TDD option<br />

or 1.28 Mcps TDD option or 7.68 Mcps<br />

TDD option.<br />

8.1.3.4 RRC / RRC Connection Release in<br />

R99 C01d UEs supporting FDD and ((CS bearer 1 or 2 Executions: CS ( only if<br />

CELL_FACH state: Failure<br />

service and CS call establishment) or CS call establishment is<br />

PS bearer service).<br />

supported ), PS<br />

C02 UEs supporting 3.84 Mcps TDD option<br />

or 1.28 Mcps TDD option or 7.68 Mcps<br />

TDD option.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!