ISRAEL<br />

RAILWAYS<br />

TENDERS:<br />

(i). (i). T TTender<br />

T ender No. No. HN/KB/27/05<br />

HN/KB/27/05: HN/KB/27/05 Grade<br />

Grade<br />

separations separations separations on on the the Akko Akko - - Nahariya Nahariya line line<br />

line<br />

section. section. Works include: building 2 road<br />

bridges and 1 pedestrian steel bridge,<br />

roads paving, supporting walls, drainage,<br />

lighting, and infrastructures. Implementation<br />

time: 12 months. Latest bidding date:<br />

29.12.2005.<br />

(ii). (ii). T TTender<br />

T ender No. No. TK/KB/03/05: TK/KB/03/05: Works orks of<br />

of<br />

upgrading upgrading the the lighting lighting facilities facilities at at the the ter-<br />

ter<br />

minals minals of of of Dimona Dimona and and Tzefa. Tzefa. Works include:<br />

dismantling of lighting elements<br />

and replacing them by new elements, and<br />

changes on electrical control boards. Implementation<br />

time: 6 months. Latest bidding<br />

date: 20.12.2005.<br />

(iii). Tender No. MC/KB/10/05: Upgrading<br />

new inspection channels at Kishon<br />

Works, Haifa.<br />

Works include: dismantling of existing concrete<br />

floors and channels, building 2 new<br />

concrete channels and floors, installing<br />

frames, drainage and electricity works,<br />

supply and installation of distribution<br />

boards, lighting and power systems, supply<br />

and installation of compressed air<br />

pipes, and earthworks. Works are to be<br />

carried out in an existing active building,<br />

and no disruption to regular works is permitted.<br />

Implementation time: 5 months.<br />

Latest bidding date: 03.01.2006.<br />

(iv). (iv). T TTender<br />

T ender No. No. No. TK/KB/01/06: TK/KB/01/06: UpgradUpgrad-<br />

ing ing ing lighting lighting systems systems at at the the P PPort<br />

P ort of of Ashdod<br />

Ashdod<br />

Classification Classification Classification YY<br />

Yard. YY<br />

ard.<br />

Works include: replacing<br />

an existing diesel-generator, adding<br />

lighting posts with crowns, changes in<br />

the main electrical board, rebuilding existing<br />

lighting posts, and dismantling of<br />

existing lighting elements and replacing<br />

them by new elements.<br />

The works consist of 2 different parts:<br />

§ 43: improving lighting of the tracks.<br />

§ 08: option - electrical works and generator.<br />

Implementation times: For works: 6<br />

months. For the option: 5 months. Latest<br />

bidding date: 12.01.2006.<br />

(v).T (v).Tender (v).T ender No. No. MC/MT/02/05: MC/MT/02/05: Inspection<br />

Inspection<br />

services services for for the the the design, design, design, manufacturing<br />

manufacturing,<br />

manufacturing<br />

and and acceptance acceptance acceptance tests tests of of 75 75 flat flat cars cars for<br />

for<br />

container container haulage. haulage<br />

haulage The contract is till the<br />

end of services, meaning till all the 75 cars<br />

will be handed over from the manufacturer<br />

Isam Khury Metal Works Co. to Israel<br />

Railways Ltd. Latest bidding date:<br />

15.01.2006.<br />

(vi). Tender No. HN/KB/02/06: Building<br />

under-track passages and a bridge on the<br />

rebuilt Beit-Shemesh - Jerusalem line.<br />

Works include the following structures:<br />

Structure 01 - an under-track passage at<br />

km 77.5.<br />

Structure 02 - an under-track passage at<br />

km 78.2.<br />

Structure 03 - a bridge over Refaim wadi.<br />

Structure 04 - Scenery rebuilding at Refaim<br />

wadi; km 76 to 77.<br />

Implementation time: 6 months. Latest<br />

bidding date: 23.01.2006.<br />

(vii). Tender MC/KB/01/06: Infrastructure<br />

works for a lathe at Haifa Kishon works.<br />

Works include: earthworks, concrete, sealing,<br />

sanitary, painting, frames, electricity,<br />

dismantling and assembly. Implementation<br />

time: 3 months. Latest bidding date:<br />

31.01.2006.<br />

(viii). (viii). (viii). T TTender<br />

T ender HN/KB/03/06: HN/KB/03/06: InfrastrucInfrastruc-<br />

ture ture works works for for building building the the Beer Beer-Sheva Beer Sheva -<br />

-<br />

Netivot, Netivot, at at the the section section between between Ofakim<br />

Ofakim<br />

and and Netivot Netivot (section (section C).<br />

C).<br />

Works include:<br />

Structure 01 - track infrastructure works.<br />

Structure 02 - construction works for culverts,<br />

earth and acoustic walls.<br />

Structure 03 - a railway bridge A-6 over<br />

Patish wadi.<br />

Structure 04 - a railway bridge A-7 over<br />

Grar wadi.<br />

Structure 05 - an overhead agricultural<br />

passage OAG-7.<br />

Structure 06 - an overhead agricultural<br />

passage OAG-8.<br />

Structure 07 - an overhead agricultural<br />

passage OAG-9.<br />

Structure 08 - an overhead agricultural<br />

passage OAG-11.<br />

Structure 09 - an overhead agricultural<br />

passage OAG-12.<br />

Structure 10 - 2 security buildings near<br />

the railway bridges.<br />

Structure 11 - option: distributing and laying<br />

mono-block type concrete sleepers<br />

and rails along the alignment.<br />

Implementation time: 18 months. Latest<br />

bidding date: 13.02.2006.<br />

(ix). (ix). T TTender<br />

T ender No. No. BZ/MT/02/06: BZ/MT/02/06: Meas-<br />

Meas<br />

uring uring services services (inspection (inspection and and quality<br />

quality<br />

control) control) on on on the the V VValley<br />

V alley (Hedjaz) (Hedjaz) line. line. The<br />

contract is for 5 years with options for extending<br />

it according to the railways’ administration<br />

decision. Latest bidding date:<br />

16.02.2006.<br />

(x). Tender No. BN/KB/01/06: Framework<br />

contract for fences.<br />

The agreement is for the supply, installation,<br />

repair and maintenance of fences<br />

along the lines south of Tel-Aviv South station<br />

from time to time according to need.<br />

The contract is for 12 months; the railways<br />

reserve themselves the right to extend<br />

it by up to an additional 36 month,<br />

as well as to change the working areas.<br />

(xi). (xi). Request Request Request for for Information Information - by<br />

30.03.2006 - for “existing technologies<br />

,cfrv<br />

,cfrv<br />

for safety improvement of level crossings,<br />

approved and installed in mainline railways,<br />

which enable the following:-<br />

- automatic detection of obstacles in the<br />

critical crossing area of road and track<br />

between the barriers.<br />

- automatic stop of trains approaching<br />

level crossings in case of detected obstacles.”<br />

(xii). (xii). T TTender<br />

T Tender<br />

ender No. No. BN/KB/06/06: BN/KB/06/06: Building Building<br />

Building<br />

aa tile tile tile roof roof on on top top of of track track and and communicommuni-<br />

cation cation departments departments buildings buildings buildings of of Haifa<br />

Haifa<br />

East East station station. station Works include: demolishing<br />

and dismantling, cast concrete, sanitation,<br />

stone works, frame and carpenter, and industrialized<br />

elements. Implementation<br />

time: 4 months. Latest bidding date:<br />

22.03.2006.<br />

(xiii). (xiii). T TTender<br />

T ender MC/KB/03/06:<br />

MC/KB/03/06: MC/KB/03/06: Building Building Building a<br />

a<br />

refuelling refuelling system system at at Ashdod Ashdod classification<br />

classification<br />

classification<br />

yard yard. yard<br />

Works include: earthworks and area preparing,<br />

manufacturing and installing a 50<br />

kiloliter capacity fuel tank as per API 650,<br />

concrete works of platforms and bases,<br />

constructions and metal sheet works for<br />

pumping complex and unloading road<br />

refueling tankers, building a base for fuel<br />

tanks, a refueling position for rail vehicles,<br />

a control position for a fuel stock<br />

control and management system, building<br />

a moveable structure, electricity and<br />

communication, pipeline works and<br />

equipment installation. Implementation<br />

time: 6 months. Latest bidding date:<br />

30.03.2006.<br />

(xiv). Tender No. MC/KB/02/06: Building<br />

a pumping complex and a water reservoir<br />

for firefighting at the Dimona station.<br />

Works include: earthworks, concrete and<br />

civil engineering, manufacturing and installation<br />

of a 300 cu.m. capacity<br />

firefighting water reservoir, pumps and<br />

their housing, instruments and control,<br />

electricity, pipelines, welding, painting,<br />

plating, and installations. Implementation<br />

time: 6 months.<br />

Latest bidding date: 03.04.2006.<br />

(xv). (xv). T TTender<br />

T Tender<br />

ender No. No. HN/KB/06/06: HN/KB/06/06: UpgradUpgrad-<br />

ing ing, ing , tracks tracks extension, extension, extension, and and adding adding tracks tracks<br />

tracks<br />

at at Mamshit Mamshit station station (south of Dimona).<br />

Works include: infrastructure, building culverts,<br />

signalization and communication<br />

works. Implementation time: 15 months.<br />

Latest bidding date: 04.04.2006.<br />

(xvi). Tender No. HN/KB/04/06: Treating<br />

oxidation pools at Ofakim.<br />

Works include: demolishing the oxidation<br />

(sewage) pools and treating the surrounding<br />

soil.<br />

Implementation time: 24 months. Latest<br />

bidding date: 09.04.2006. (Note: these<br />

works are an integral part of clearing the<br />

area for the Ashkelon - Shderot - Netivot<br />

- Ofakim - Beer-Sheva line now under<br />

construction.)