Mobility challenges in Dhaka and initiatives
Mobility challenges in Dhaka and initiatives
Mobility challenges in Dhaka and initiatives
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Challenges <strong>in</strong> <strong>Dhaka</strong><br />
Pedestrians are ignored<br />
Footpath cut <strong>in</strong> some area under<br />
model project<br />
STP allocated only 10 million USD<br />
for pedestrian’s of total budget 5.2<br />
billion USD.<br />
STP didn’t mention when <strong>and</strong> how<br />
improve walk<strong>in</strong>g environment.<br />
Constructed foot-over-bridges<br />
Erase zebra cross<strong>in</strong>g from several<br />
area