17.07.2013 Views

August 2011 - Kauai Island Utility Cooperative

August 2011 - Kauai Island Utility Cooperative

August 2011 - Kauai Island Utility Cooperative

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

38 KIUC CURRENTS<br />

Large Power Primary Service<br />

(metered on the primary side of customer­owned transformers)<br />

SCHEDULE “L”<br />

Applicable to all power users with metered loads in excess of 100 kW during any consecutive<br />

15­minute period in any month. Such customers must sign a contract for service for a minimum period<br />

of twelve (12) months except for temporary services.<br />

Rate:<br />

Customer Charge: (Per Customer per month) $355.08<br />

Demand Charge:<br />

Energy Charge:<br />

The minimum charge shall be the sum of the Customer Charge and the Demand Charge.<br />

The Resource Cost Adjustment (DSM & IRP) Surcharge shall be added to the Customer and Energy<br />

Charges, and energy cost adjustment.<br />

Large Power Secondary Service<br />

(metered on the secondary side of KIUC­owned transformers)<br />

SCHEDULE “P”<br />

Available to all power users with metered loads in excess of 100 kW during any consecutive<br />

15­minute period in any month. Such customers must sign a contract for service for a minimum period<br />

of twelve (12) months, except for temporary services.<br />

Rate:<br />

(To be added to Customer<br />

Charge)<br />

(To be added to Customer<br />

Charge and Demand Charge)<br />

$13.94 per kW of monthly<br />

demand<br />

First 400 kWh per kW demand $0.30416 per kWh<br />

All Over 400 kWh per kW demand $0.28141 per kWh<br />

Energy Rate Adjustment<br />

Clause (ERAC):<br />

All kWh<br />

Customer Charge: (Per Customer per month) $369.38<br />

Demand Charge:<br />

Energy Charge:<br />

(To be added to Customer<br />

Charge)<br />

(To be added to Customer<br />

Charge and Demand Charge)<br />

See explanation at the<br />

bottom of the schedules<br />

$11.14 per kW of monthly<br />

demand<br />

First 400 kWh per kW demand $0.31379 per kWh<br />

All Over 400 kWh per kW demand $0.28977 per kWh<br />

Energy Rate Adjustment<br />

Clause (ERAC):<br />

All kWh<br />

See explanation at the<br />

bottom of the schedules<br />

The minimum charge shall be the sum of the Customer Charge and the Demand Charge.<br />

The Resource Cost Adjustment (DSM & IRP) Surcharge shall be added to the Customer and Energy<br />

Charges, and energy cost adjustment.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!