23.07.2013 Views

The Modified Rational Method

The Modified Rational Method

The Modified Rational Method

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Comparison between TR-55 and <strong>Rational</strong> <strong>Method</strong><br />

Hydrographs – <strong>Rational</strong> <strong>Method</strong> (Post-Dev.):<br />

Remember, the actual Q PEAK will be based upon the Standard <strong>Rational</strong> <strong>Method</strong><br />

Equation, not the MRM Equation.<br />

<strong>The</strong>refore, if this were an inflow point into the detention basin, the storm drain<br />

and the Conduit Outlet Protection would need to be sized for this Q PEAK.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!