Power Plant<br />

Air Condition<br />

Monitor cooling regularly.<br />

Checking of thermostat settings, pipes,<br />

hose connections, drainage and jacketing.<br />

Ensure that the cooling coils, filters and gas<br />

checked as per regular service periods.<br />

Check regular load as per power plant capacity.<br />

Checking and tightening of connections with<br />

proper lugs.<br />

Make sure about MCB ratings as per attached<br />

equipments.<br />

Testing of all alarms, critical, major and minor.