Exhibit P-5, Cost Analysis: PB 2014 <strong>Defense</strong> <strong>Threat</strong> <strong>Reduction</strong> <strong>Agency</strong> Date: April 2013<br />

Appropriation / Budget Activity / Budget Sub Activity:<br />

0300D: Procurement, <strong>Defense</strong>-Wide / BA 01: Major<br />

Equipment / BSA 23: Major Equipment, <strong>Defense</strong> <strong>Threat</strong><br />

<strong>Reduction</strong> <strong>Agency</strong><br />

Resource Summary<br />

Prior<br />

Years FY 2012 FY 2013 #<br />

P-1 Line Item Nomenclature:<br />

20 - Vehicles<br />

FY 2014<br />

Base<br />

FY 2014<br />

OCO ##<br />

FY 2014<br />

Total FY 2015 FY 2016 FY 2017 FY 2018<br />

LI 20 - Vehicles UNCLASSIFIED<br />

<strong>Defense</strong> <strong>Threat</strong> <strong>Reduction</strong> <strong>Agency</strong> Page 3 <strong>of</strong> 5 P-1 Line #22<br />

Item Nomenclature (Item Number - Item<br />

Name, DODIC):<br />

22 - Vehicles<br />

To<br />

Complete Total<br />

Procurement Quantity (Units in Each) - - - - - - - - - - - -<br />

Gross/Weapon System Cost ($ in Millions) 1.371 0.200 0.050 0.100 - 0.100 - - - - Continuing Continuing<br />

Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - -<br />

Net Procurement (P1) ($ in Millions) 1.371 0.200 0.050 0.100 - 0.100 - - - - Continuing Continuing<br />

Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - -<br />

Total Obligation Authority ($ in Millions) 1.371 0.200 0.050 0.100 - 0.100 - - - - Continuing Continuing<br />

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)<br />

Initial Spares ($ in Millions) - - - - - - - - - - - -<br />

Gross/Weapon System Unit Cost<br />

(Units in Millions)<br />

# FY 2013 Program is from <strong>the</strong> FY 2013 President's Budget, submitted February 2012<br />

## The FY 2014 OCO Request will be submitted at a later date<br />

Cost Elements<br />

(† indicates <strong>the</strong><br />

presence <strong>of</strong> a P-5A)<br />

Vehicles Cost<br />

Recurring Cost<br />

ID Unit Cost<br />

CD ($ M )<br />

- - - - - - - - - - - -<br />

All Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Total<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ M )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ M )<br />

Quantity<br />

(Each)<br />

Sedan -1 A - - 0.161 - - - - - - - - - - - - - - -<br />

Sedan -2 A - - 0.163 - - - - - - - - - - - - - - -<br />

Station Wagon A - - 0.035 - - - - - - - - - - - - - - -<br />

Van-Wagon A - - 0.059 - - - - - - - - - - - - - - -<br />

Van-Wagon (8<br />

passenger)<br />

Van-Wagon (16<br />

passenger)<br />

Total<br />

Cost<br />

($ M )<br />

A - - 0.221 - - - - - - - - - - - - - - -<br />

A - - 0.047 - - - - - - - - - - - - - - -<br />

Suburban A - - 0.086 - - - - - - - - - - - - - - -<br />

Sport Utility Vehicle A - - 0.218 - - - - - - - - - - - - - - -<br />

† Sport Utility Vehicle<br />

(4x4)<br />

Passenger-Carrying<br />

Crew Cab Truck (4x)<br />

A - - 0.288 0.050 4 0.200 0.050 1 0.050 0.050 2 0.100 - - - 0.050 2 0.100<br />

A - - 0.041 - - - - - - - - - - - - - - -<br />

Bus A - - 0.052 - - - - - - - - - - - - - - -<br />

Total Recurring Cost 1.371 0.200 0.050 0.100 - 0.100<br />

Total Vehicles Cost 1.371 0.200 0.050 0.100 - 0.100<br />

Gross Weapon System<br />

Cost<br />

Unit Cost<br />

($ M )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ M )<br />

Quantity<br />

(Each)<br />

Total<br />

Cost<br />

($ M )<br />

Unit Cost<br />

($ M )<br />

Quantity<br />

(Each)<br />

1.371 0.200 0.050 0.100 - 0.100<br />

Total<br />

Cost<br />

($ M )<br />