SHARON
SHARON
SHARON
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>SHARON</strong> N-Removal Over Nitrite<br />
Results of rejection water treatment <strong>SHARON</strong> Rotterdam<br />
parameter dimension value<br />
Nkj influent mg/l 1.000 - 1.500<br />
N-removal % > 95<br />
HRToxic day 1,0 - 1,5<br />
temperature<br />
0<br />
C 30 - 40<br />
pH - 7,0 - 7,5<br />
oxygen ppm 1,0 - 1,5<br />
+<br />
NH4<br />
+<br />
NH4<br />
NITRIFICATION<br />
+<br />
+<br />
1,5 O2<br />
2 O2<br />
DENITRIFICATION<br />
-<br />
NO2 + H2O + 2H +<br />
-<br />
NO3<br />
25% ENERGY SAVED<br />
+ H2O + 2H +<br />
- -<br />
6 NO2 + 3CH3OH + 3 CO2 3N2 + 6 HCO3 +3 H2O<br />
- -<br />
6 NO3 + 5CH3OH + CO2 3N2 + 6 HCO3 +7 H2O<br />
40 % METHANOL SAVED<br />
In conventional aerobic systems the biological ammonia So in a system without sludge retention they can<br />
oxidation comprises of two steps. survive at shorter residence times.<br />
First the oxidation of ammonia to nitrite by Nitrosomonas and In a reactor with a temperature of 30 to 40 o C and a<br />
subsequently the oxidation of nitrite to nitrate by Nitrobacter. short residence time mainly ammonia oxidation to<br />
At higher temperatures Nitrosomonas prove to have significantly nitrite occurs because Nitrobacter is washed out of<br />
higher maximum growth rates than Nitrobacter. the system.<br />
PROCESS FEATURES FULL SCALE PLANTS<br />
• no sludge retention • location: WWTP Utrecht (NL)<br />
• simple process capacity: 400.000 pe<br />
• nitrite route reduces up to: influent: rejection water<br />
25% oxygen demand N-load: 900 kg Nkj/d<br />
40% methanol requirement operational: 1997<br />
40% sludge production<br />
• maximum usage of alkaline buffer • location: WWTP Rotterdam (NL)<br />
capacity: 470.000 pe<br />
influent: rejection water<br />
APPLICATION load: 850 kg Nkj/d<br />
• rejection water of sludge digestion operational: 1999<br />
• leachate water of landfill site<br />
• waste water of composting process • location: WWTP Zwolle (NL)<br />
• condensate of sludge drying capacity: 200.000 pe<br />
influent: rejection water<br />
N-load: 410 kg Nkj/d<br />
operational: 2003<br />
Grontmij Water & Waste Management<br />
Utrechtseweg 2<br />
3732 HB De Bilt<br />
Postbus 14<br />
3730 AA De Bilt<br />
The Netherlands<br />
Information:<br />
ir. R. van Kempen<br />
ir. H.W. de Mooij<br />
T. + 31 30 694 32 10<br />
F. + 31 30 695 63 66<br />
• location: WWTP Beverwijk (NL)<br />
capacity 320.000 pe<br />
influent: rejection water and condensate<br />
sludge drying<br />
N-load: 1.200 kg Nkj/d<br />
operational: 2003