2. Testing Requirements (US & Canada)<br />

7<br />

- UL 1741 Testing:<br />

- Temperature rise measurement , need to be tested at a<br />

chamber of max. specified environment temperature if it was<br />

marked more than 40C;<br />

- Output short-circuit test<br />

- GFDI verification test<br />

- Hi-Pot Test<br />