An annual marketing surveillance overseas trip at a cost K20,000.00 for<br />

landowner representatives.<br />

(e) Landowner Infrastructural Benefits<br />

Under the Project Agreement, landowners are entitled to a number of funds that can be<br />

used to develop infrastructures such as classrooms, teacher's houses, clinics and aid<br />

posts and other items that the committee tasked with the management of the funds<br />

approves. These funds are:<br />

An Annual Benefit Fund of K420,000.00 per annum, to be managed by an<br />

“Annual Benefits Fund Committee”;<br />

A Log Transport Infrastructure Fund of K150,000.00 specifically for those villages<br />

along the marine routes and waterways used by the company to transport logs,<br />

to be managed by a “Log Transport Infrastructure Fund Committee”;<br />

An amount of K100, 000.00 for construction of clinics;<br />

An amount of K100, 000.00 for the construction of classrooms and teacher's<br />

houses; and<br />

The installation of VHF Radios in several villages (see below) worth K30,000.00.<br />

The following infrastructures can be confirmed from the visit to villages able to be<br />

accessed by the Review Team:<br />

At Wasapea Village:<br />

o 1x standard double classroom<br />

o 1x aid post<br />

o 1x VHF radio<br />

At Makapa village:<br />

o 4x standard double classrooms<br />

o 4x L40 teacher's houses<br />

o 1x aid post<br />

o 1X VHF radio<br />

At Pikiwa village:<br />

o 4x L40 teacher's houses<br />

o 3x standard double classrooms<br />

o 1x aid post<br />

o 1x VHF radio<br />

The Review Team was unable to reach Bamustu village due to logistical problems and<br />

lack of time and therefore cannot confirm the infrastructure developments there. Apart<br />

from the above infrastructures 5 generator sets were also distributed for village<br />

electrification.<br />

Review of Current Logging Projects 2004<br />

Individual Project Review Report No 4 – TP 1-9 Makapa Page 12