19.12.2013 Views

Summary of Main Discussion Points - HCV Resource Network

Summary of Main Discussion Points - HCV Resource Network

Summary of Main Discussion Points - HCV Resource Network

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fran Price, Geri Steindlegger (and/or Ken Creighton), Jim Ford, Marcus Colchester<br />

and Peter Gardiner - for their initial consideration.<br />

It was noted in general the applicants were <strong>of</strong> an extremely high quality but that<br />

there were significant gaps in both expertise with social issues and from the Latin<br />

American region (possibly due to a lack <strong>of</strong> practitioners comfortable operating in<br />

English). The SG discussed the need for some more dedicated strategic outreach to<br />

fill these gaps. It was reiterated that the primary function <strong>of</strong> this panel was to be a<br />

scientific and technical one. However, it was also recognised that balancing<br />

stakeholder views would be likely to lead to an increased balance <strong>of</strong> technical skills,<br />

and that this should be borne in mind when making the final selection.<br />

Agreed Actions<br />

1. Members <strong>of</strong> the QC to suggest their preferred 20 candidates from the 27<br />

applications received asap.<br />

2. 3-4 spaces to remain open on the TP for the additional skill sets lacking in<br />

representation.<br />

3. Full SG to confirm final membership <strong>of</strong> the TP on a no objections basis, with a<br />

view to inviting members to an initial kick-<strong>of</strong>f meeting provisionally<br />

scheduled to be held in Oxford at the end <strong>of</strong> July.<br />

Funding<br />

The issue <strong>of</strong> fundraising for the first physical meeting <strong>of</strong> the Technical Panel (i.e.<br />

over the course <strong>of</strong> the next month) was discussed. It was noted that in order to avoid<br />

potential concerns <strong>of</strong> “green washing” and /or conflicts <strong>of</strong> interest the <strong>Network</strong><br />

needed specific rules with respect to which private companies it could approach for<br />

funding. In the specific context <strong>of</strong> raising funds for the TP, it was emphasized that<br />

individual companies would have no say in either the composition <strong>of</strong> the panel or<br />

any <strong>of</strong> its outputs.<br />

Agreed Action<br />

1. Start fundraising for TP meeting over the course <strong>of</strong> coming month.<br />

2. Co-chairs to draft a policy outlining rules for accepting funds from private<br />

donors.<br />

3. SG to agree procedure rules by email consultation.<br />

2.2 <strong>Network</strong> Activities 2008<br />

Technical Regional Update Meeting: N-W Russia, early September<br />

The Secretariat updated the SG on plans to hold its next regional meeting in<br />

Syktyvkar (Komi Republic). The proposed timing for this has been shifted to early<br />

September (originally scheduled for the latter half <strong>of</strong> the month) as a result <strong>of</strong> a<br />

Steering Group Telecon <strong>Summary</strong>, June 2008 2