"Mighty Mac's" Challenge Met<br />

By Local Union 876 Members<br />

Local 876 members were recemly<br />

Involved in a demanding Job tnvul , ­<br />

Ing the tn. lal lation <strong>of</strong> a fiber-optic·<br />

cable sy tem lor the MichIgan Bell<br />

Telephone Cumpany across the<br />

Mackina Bridge, which connects the<br />

Upper and Lower Penin -ulas <strong>of</strong><br />

MIchigan. MIchiga n Bell is 111staUing<br />

the cable system lor their uHernal<br />

u,e Irom one end <strong>of</strong> the state to the<br />

oth er, and the crosslIlg at the StmilS<br />

01 Mackinac presented a fomlidablc<br />

hallcnge.<br />

The "Mighty Mac," as It is known,<br />

IS one <strong>of</strong> Lhe world', greatest uspen­<br />

Ion bndges Wilh an overall length<br />

from land to land <strong>of</strong> 19, 2.42. lect and<br />

a dlstance between suspension to"' ·<br />

crs <strong>of</strong> 3,800 feCI, with the uspenslon<br />

span alone belOS 7,400 lect long. The<br />

lowers LhclU~cl vc::' lise approXlmately<br />

575 feel above the Water. Thc<br />

bndge wa thought to be Impossible<br />

to build lor years because <strong>of</strong> the<br />

trong curren ts 111 the traits between<br />

th e tWO pcnin'Ou las and the tremendous<br />

pressure on the suspensiontoWer<br />

loundatlons from ICC floes during<br />

the long winters. However, the<br />

bridge was linall y completed in 1957 ;<br />

and up until now had never been<br />

ll sed (or anything except vehicle<br />

traffic.<br />

MIchIga n Bell engincers ruled OUt<br />

311 undcrw3lcr c rossing because <strong>of</strong><br />

the prevIOusly mentioned problems<br />

amI subsequently negOliated a lea e<br />

WIth the Macklnac Bndge Authomy<br />

10 install a 4-lnc.h ga lvanized-sLCel<br />

conduil acros~ tbe brid 'e in whicb<br />

the cable would be pl aced. One <strong>of</strong><br />

the condlllon <strong>of</strong> the Icase was that<br />

the conduit be installed under the<br />

brit/I:" ruat/way, clear <strong>of</strong> any mtcr·<br />

fcrcncC' Wllh the bridge authonty's<br />

maintenance trolleys which are used<br />

constantly to inspect and paint the<br />

bndge_<br />

This cOllduion resulted in a cha l­<br />

lenge to the successful bidder, M. ).<br />

El ectric In c. <strong>of</strong> Iron Mountain, Michiga<br />

n, to deSIgn a movable scaffold<br />

1Q I <strong>IBEW</strong> JOURNAL! MARCH <strong>1987</strong><br />

Loca18/6 members Wayne VIllwock i:I/ld CI,arles Bishop perform Iheir work on Iho e;pecial scalfold<br />

designed for 1he fiber-optic-cable installation Job on the Mackinac Bridge .<br />

that wOll ld permit the conduit to be<br />

install ed in 20-foot len/lths wilhout<br />

exten ive building aod tearing down<br />

<strong>of</strong> scaffo lding, Cond that would still<br />

make a sale place for our members<br />

to work wuhollt hlnekillg more than<br />

one lane <strong>of</strong> traffic. M . ,. Electric'<br />

engineer were able to come up with<br />

a design lor a sca(fold made from<br />

modIfied substation teel [ru c<br />

mounted on a flatbed semitrailer<br />

which were extended OUt over the<br />

bridge rading, below the roadway,<br />

and back unde.r the mat/way a distance<br />

<strong>of</strong> approximately 8 fee t. An 18-<br />

Ion Grove crane was used to pu ll the<br />

assembly along as tbe nduit was<br />

insta ll ed :and to disconnect tbt; wUlk<br />

platfonn every ni ght to clear the<br />

bridge. A total <strong>of</strong> 11,736 feet <strong>of</strong> COndUit<br />

was installed in this manner<br />

between the nonh and south shores<br />

and the north and south su pen ioncable<br />

anchorages. Between the north<br />

and south cable anchorages on the<br />

su pen ion portion <strong>of</strong> the bridge, tbe<br />

conduit was installed using two 24-<br />

inch by 40-foOl aluminum " picks"<br />

in tead <strong>of</strong> the work platform because<br />

the su pension cables interfered with<br />

th e passage <strong>of</strong> the platform.<br />

In addjtion to the pbtIorm, M. ).<br />

Electric'S afcty DcpartIncnt required<br />

that a safety cable be llUng<br />

alongside <strong>of</strong> the conduit all along the<br />

insta.l lotion rOu t ei LInd the m en were<br />

I