EXTRANEAL (icodextrin) Peritoneal Dialysis Solution - Baxter
EXTRANEAL (icodextrin) Peritoneal Dialysis Solution - Baxter
EXTRANEAL (icodextrin) Peritoneal Dialysis Solution - Baxter
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Directions for Use<br />
For complete CAPD and APD system preparation, see directions accompanying<br />
ancillary equipment.<br />
Aseptic technique should be used.<br />
Warming<br />
For patient comfort, <strong>EXTRANEAL</strong> can be warmed to 37°C (98°F). Only dry heat<br />
should be used. It is best to warm solutions within the overwrap using a heating<br />
pad. Do not immerse <strong>EXTRANEAL</strong> in water for warming. Do not use a microwave<br />
oven to warm <strong>EXTRANEAL</strong>. Heating above 40°C (104°F) may be detrimental to<br />
the solution.<br />
To Open<br />
To open, tear the overwrap down at the slit and remove the solution container.<br />
Some opacity of the plastic, due to moisture absorption during the sterilization<br />
process, may be observed. This does not affect the solution quality or safety and<br />
may often leave a slight amount of moisture within the overwrap.<br />
Inspect for Container Integrity<br />
Inspect the container for signs of leakage and check for minute leaks by<br />
squeezing the container firmly.<br />
Adding Medications<br />
Some drug additives may be incompatible with <strong>EXTRANEAL</strong>.<br />
See DOSAGE AND ADMINISTRATION section for additional information. If the<br />
re-sealable rubber plug on the medication port is missing or partly removed, do<br />
not use the product if medication is to be added.<br />
1. Put on mask. Clean and/or disinfect hands.<br />
2. Prepare medication port site using aseptic technique.<br />
3. Using a syringe with a 1-inch long, 25- to 19-gauge needle, puncture the<br />
medication port and inject additive.<br />
4. Reposition container with container ports up and evacuate medication port by<br />
squeezing and tapping it.<br />
5. Mix solution and additive thoroughly.<br />
Preparation for Administration<br />
1. Put on mask. Clean and/or disinfect hands.<br />
2. Place <strong>EXTRANEAL</strong> on work surface.<br />
3. Remove pull ring from connector of solution container. If continuous fluid<br />
flow from connector is observed, discard solution container.<br />
4. Remove tip protector from tubing set and immediately attach to connector of<br />
solution container.<br />
5. Continue with therapy set-up as instructed in user manual or directions<br />
accompanying tubing sets.<br />
6. Upon completion of therapy, discard any unused portion.<br />
<strong>Baxter</strong>, Extraneal, UltraBag, and Ambu-Flex are trademarks of <strong>Baxter</strong><br />
International Inc.<br />
<strong>Baxter</strong> Healthcare Corporation<br />
Deerfield, IL 60015 USA<br />
Printed in USA<br />
07-19-65-351<br />
2010/10<br />
071965351<br />
*BAR CODE POSITION ONLY<br />
-6-<br />
HOW SUPPLIED<br />
<strong>EXTRANEAL</strong> (<strong>icodextrin</strong>) <strong>Peritoneal</strong> <strong>Dialysis</strong> <strong>Solution</strong> is available in the following<br />
containers and fill volumes:<br />
Container Fill Volume NDC<br />
ULTRABAG 1.5 L NDC 0941-0679-51<br />
ULTRABAG 2.0 L NDC 0941-0679-52<br />
ULTRABAG 2.5 L NDC 0941-0679-53<br />
AMBU-FLEX III 1.5 L NDC 0941-0679-45<br />
AMBU-FLEX III 2.0 L NDC 0941-0679-47<br />
AMBU-FLEX III 2.5 L NDC 0941-0679-48<br />
AMBU-FLEX II 2.0 L NDC 0941-0679-06<br />
AMBU-FLEX II 2.5 L NDC 0941-0679-05<br />
Each 100 mL of <strong>EXTRANEAL</strong> contains 7.5 grams of <strong>icodextrin</strong> in an electrolyte<br />
solution with 40 mEq/L lactate.<br />
Store at 20–25°C (68–77°F). Excursions permitted to 15–30°C (59–86°F) [See<br />
USP Controlled Room Temperature]. Store in moisture barrier overwrap in carton<br />
until ready to use. Protect from freezing.<br />
Rx Only<br />
07-19-65-351