Advice on Tendering for a Playing Surface - FIFA.com
Advice on Tendering for a Playing Surface - FIFA.com
Advice on Tendering for a Playing Surface - FIFA.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Some of this in<strong>for</strong>mati<strong>on</strong> can be gathered be<strong>for</strong>e the start of the <strong>for</strong>mal<br />
selecti<strong>on</strong> process through research, site-visits and references, and prospective<br />
c<strong>on</strong>tractors may be excluded from the process as a result.<br />
The selecti<strong>on</strong> process<br />
Be<strong>for</strong>e beginning the selecti<strong>on</strong> process, the facility planning exercise should have<br />
been undertaken and the project scope clearly determined. Funding should be in<br />
place to achieve the goals set.<br />
The c<strong>on</strong>tractor is selected through an ‘Invitati<strong>on</strong> to Tender’. The tender process<br />
invites <strong>com</strong>panies to bid <strong>com</strong>petitively to provide the services required based <strong>on</strong><br />
the same criteria and timeframe.<br />
The tender process should:<br />
Provide clear and <strong>com</strong>plete instructi<strong>on</strong>s to the bidding <strong>com</strong>panies about the<br />
project and the tender process<br />
Include standard <strong>for</strong>mat documents <strong>for</strong> <strong>com</strong>pleti<strong>on</strong> by the bidding <strong>com</strong>panies<br />
to ensure direct <strong>com</strong>paris<strong>on</strong> of proposals based <strong>on</strong> key criteria identified<br />
10